Search Documents

Sort by

  • AUSIMM
    "Development of a Real-Time Adherence to Mine Plan Tools as Part of an Integrated Remote Mine Control Centre"

    By S D. Dessureault

    In one of North AmericaÆs largest mines, which contains more than six active coal-producing faces, mine controllers must meet the complex challenge of adhering to the mine plan while also ensuring cus

    Sep 26, 2011

  • AUSIMM
    Multi-Disciplinary Engineering Research and Development Skills for Mining û A Case Study

    By S Van Duin, I Porter

    This paper discusses how advanced manufacturing technology (AMT), which is fundamentally reliant on and developed via multi-disciplinary skills, has benefitted non-mining industries, and what lessons

    Sep 26, 2011

  • AUSIMM
    Application of Simulation Technology to the Design of Coal Clearance Systems

    Longwall mining operations have been in place in Australia since the early 1960s. This mining method is currently used to extract the bulk of coal obtained from underground mines in Australia (CSIRO,

    Sep 26, 2011

  • AUSIMM
    Mining Network and the Security Question

    By A Huebner, A Noack

    Companies all over the world are very sensitive concerning their IT and network security. In most network connected technical installations and machines however, network security is not taken into acc

    Sep 26, 2011

  • AUSIMM
    Eight-Dimensional Planning Construction of an Integrated Model for Mine Planning Involving Constructability

    By E Rubio, N Morales

    A common practice in the mining industry is to decompose the planning process into different tasks, so the overall process and specific schedules can be constructed easily. Nevertheless, currently the

    Sep 26, 2011

  • AUSIMM
    Multivariate Geostatistical Simulation via Joint Approximate Diagonalisation û A Case Study

    By J Ferreira

    To speed up multivariate geostatistical simulation it is common to transform the set of attributes into spatially uncorrelated factors that can be simulated independently. One decorrelation method is

    Sep 26, 2011

  • AUSIMM
    Robust Decision Making û Application to Mine Planning Under Price Uncertainty

    By F Grobler

    Many projects fail because project performance in unfavourable economic conditions was not anticipated at the investment decision stage. This type of failure may have been avoided through the selectio

    Sep 26, 2011

  • AUSIMM
    Prediction of Burden at the Sungun Copper Mine by Artificial Neural Network

    By H Khoshrou, A Siamaki

    Blast designs can have productive and non-productive impacts on downstream stages, mine productivity and operating costs. On the other hand, ground vibration, fragmentation, and back break caused by b

    Sep 26, 2011

  • AUSIMM
    Total Integrated System Simulation for Master Planning of the Dalrymple Bay Coal Chain

    By B Olsson, R Norman, M Volz

    Australia has seen unprecedented demand for coal exports in the last ten years and this demand is set to expand further still according to many analysts. This rapid increase in demand has placed press

    Sep 26, 2011

  • AUSIMM
    A New Approach to Flexible Open Pit Optimisation and Scheduling

    By A Galli

    Traditionally pit optimisation and scheduling is carried out assuming that the resources, the commodity prices and production costs are all known. Once the pit contour and the mining schedule have bee

    Sep 26, 2011

  • AUSIMM
    A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning

    By C Niemann-Delius

    The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new

    Sep 26, 2011

  • AUSIMM
    Panel Caving Scheduling Under Precedence Constraints Considering Mining System

    By E Rubio, N Morales

    Currently, mine plans are optimised by using several criteria as objective functions, like profit, life-of-mine, concentration of some pollutants, mining costs, confidence level or ore resources, with

    Sep 26, 2011

  • AUSIMM
    Localised Indicator Kriging

    By I Douglas, L Allen

    Localised indicator kriging was developed following a similar approach used by Marat Abzalov (2006) in his paper titled æLocalised uniform conditioning (LUC): A new approach for direct modelling of sm

    Sep 26, 2011

  • AUSIMM
    Assessment Model for Quantifiably Measuring the Impact of an Information-Based Decision Support System in a Coal Mine Integrated Remote Control Room

    By S D. Dessureault

    The largest surface coal mine in North America requires complex materials handling infrastructure to fulfil the highly variable quality specifications of its contracts. These diverse demands, reflecte

    Sep 26, 2011

  • AUSIMM
    Safety Support Functions for Underground Network Communications

    By A Noack

    Today underground infrastructures, like tunnels and especially wide spread underground mines, are often equipped with ethernet based communication systems. These networks are used for the unified comm

    Sep 26, 2011

  • AUSIMM
    Development and Application of a Holistic Quantitative Deterministic Technique for Risk Modelling (Quadrim) in Mine Valuation

    In this paper a quantitative deterministic risk modelling approach (Quadrim) is introduced. The mathematical framework and equations for quantifying uncertainty within and aggregating across value cha

    Sep 26, 2011

  • AUSIMM
    Application of Statistical Approaches for the Development of Cost Estimation Models for JawáCrushers

    By J V. Mehrabani, A R. Sayadi

    Adequate estimation of equipment costs is a key factor in a feasibility study and in evaluation of design alternatives for mining and mineral processing projects. Inaccurate early cost estimation coul

    Sep 26, 2011

  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    Using SAP Business Objects to Deliver Actionable Information for Operators to Management

    Real-time data collection and plant historians are becoming common place in mining and processing plants. This vast quantity of data must be turned into easily accessible and actionable information fo

    Sep 26, 2011

  • AUSIMM
    "Optimisation of Mining Policy Under Different Economical Conditions Using a Combination of Non-Linear Programming and Genetic Algorithm"

    By A Esfahanipour, M Osanloo

    Determination of cut-off grade?strategy is one of the most important stages of open pit mine planning and design. It is the parameter directly influencing the financial, technical, economic, legal, en

    Sep 26, 2011