Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Summary Of The EU Voluntary Copper Risk AssessmentBy K. Delbeke
Within the framework of the EU Existing Substance (93/793/EEC) and REACH regulations EC/1907/2006), the copper industry initiated in 2000 a comprehensive Voluntary Risk Assessment of copper and severa
Jan 1, 2007
-
Modelling of Dry Magnetic Separator by Artificial Neural Network at Gol-e-Gohar Iron Ore MineBy B Yeganeh, A Sam, A Kohsari
The base of separation at Gol-e-Gohar iron ore plant (Sirjan in the south of Iran) is magnetic separation after milling. Magnetic separation in the plant is divided into two parts: dry magnetic separa
Jan 1, 2007
-
Fog Mesh Studies For Fog RemovalBy A. Martikainen
Field tests concerning a fog mesh method for fog removal are discussed. The first tests were performed at the Pyhäsalmi Mine, Finland. As this study gave promising results, further studies were compl
Jan 1, 2007
-
Geology Of The Biwabik Iron Formation And Duluth ComplexBy Mark A. Jirsa
The Biwabik Iron Formation is a ~1.9 billion year-old sequence of iron-rich sedimentary rocks that was metamorphosed at its eastern- most extent by ~1.1 billion year-old intrusions of the Duluth Comp
Jan 1, 2007
-
Gas Dispersion Management In A Copper I Molybdenum Separation CircuitThe effect of superficial gas rate distribution (Jg profile) on down-the-bank metallurgical response was tested in the rougher-scavenger bank (eight 10-m3 tank cells, 4 roughers and 4 scavengers) at H
Jan 1, 2007
-
Technology and Operational Improvements in Tuyere Punching, Silencing, Pyrometry and Refractory Drilling EquipmentBy M. J. Marinigh
Increased safety requirements, higher operational costs, greater environmental restrictions, and new competitive processing techniques are the challenges smelter operators must confront in order to re
Jan 1, 2007
-
Rock Engineering Aspects of Designing Large Span Caverns at Depth in the Deep Underground Science and Engineering LaboratoryBy C. Laughton
Construction of a Deep Underground Science and Engineering Laboratory(DUSEL) is proposed under the auspices of the US National Science Foundation(NSF). DUSEL will provide scientists and engineers with
Jan 1, 2007
-
Noranda Process Reactor at Xstrata Copper- Impact of Minor Slag Components (CaO, Al2O3, MgO, ZnO) on the Optimum %Fe/SiO2 in Slag and Operating TemperatureBy P. Coursol
The Noranda Reactor Process (NRP) has been in operation now for more than 30 years and this mature process has attained a high level of performance. The NRP at the Home Smelter of Xstrata Copper treat
Jan 1, 2007
-
Creep Properties of an Over-Aged Al2024 Composite Reinforced with SIC Particles Prepared by Hot Powder ExtrusionBy N. Bakhshizadeh
In this investigation, the aging effect on creep behavior of A12024-10%SiC composite fabricated by powder metallurgy was studied. P/M bars were manufactured by hot powder extrusion method at 450°C wit
Jan 1, 2007
-
Study of Effective Parameters on Splash Phenomenon in Peirce-Smith ConvertersBy Namavari. H., M. Ashouri, M. R. Sarhadi, S. H. Mansouri, A. Sarrafi
The splash phenomenon and its effective parameters in metallurgical converters have been studied thoroughly for decades. The detailed studies of processes such as tuyere blockage, wave formation durin
Jan 1, 2007
-
New Challenges Facing Cumerio Med Pirdop PlantBy T. Beamish, I. Vasilev, T. Nikolov, E. Marinov, D. Kirilov, P. Barrios
In April 2005, Umicore Copper de-merged from Umicore Group and created a new independent Copper company called Cumerio. As a separate company, Cumerio is a major European copper smelter and refinery a
Jan 1, 2007
-
Velocity of detonation of Non-Ideal explosives: investigating the influence of confinementThe VoD of non-ideal explosives depends on the charge diameter and the thickness, strength and sound velocity of the confiner. VoD measurements are made to evaluate explosives for development, quality
Jan 1, 2007
-
Increasing Competitiveness In The Atlantic Copper Metallurgical ComplexBy J. Contreras
In the period 2003-2004, the situation of the copper concentrate market was unfavourable for smelters and refineries, with low TC/RC values and euro-dollar parity affecting European companies negative
Jan 1, 2007
-
The Benefits of Automated Sampling and Analysis of Iron OreBy R Shaw, R Williamson
Global iron ore demand, sparked by ChinaÆs rapid industrialisation and emergence as the worldÆs newest steel market, has seen iron ore groups investing heavily in production capacity as well as infras
Jan 1, 2007
-
Old Iron, New Iron - A Story of Revival at Frances CreekTerritory Iron has seen fit to revive the old Frances Creek iron ore mine some 30 years after it ceased operations in AustraliaÆs Northern Territory. The key to this revival has been the changes that
Jan 1, 2007
-
Paipote Smelter in a Continuos Process of OptimizationBy O. C. Rojas, J. Sanhueza, J. C. Vargas
Empresa Nacional de Minería (ENAMI) is dedicated to the promotion of small and mid scale Chilean mining industry. Paipote, ENAMI Copper Smelter, processes a variety of mineral products as the result o
Jan 1, 2007
-
Multi-Attribute Selection Method For Mining TrucksBy D. Komljenovic, V. Kecojevic
Selection of the best possible truck type (model) is of crucial importance for the mine decision-makers. In this paper, authors contribute to the body of knowledge by developing a novel methodology f
Jan 1, 2007
-
Incorporation Of Ore Grade Uncertainty Into The Push Back Design ProcessBy J. Gholamnejad
In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi
Jan 1, 2007
-
A Logical Approach to Determination of Density and Porosity Values for Iron Ore DepositsThe importance of the accurate determination and interpretation of the bulk density and porosity of a given iron ore deposit is very often disregarded or neglected. Large amounts of time and money are
Jan 1, 2007
-
Management Innovations In The Processes At Cerro Verde MineBy G. V. Fernandez
Sociedad Minera Cerro Verde S.A.A leaches secondary copper sulfides. In recent years, the mine has introduced innovations that have improved the management of mineral crushing, agglomeration, curing,
Jan 1, 2007