Search Documents

Sort by

  • CIM
    A Fluid Inclusion and Stable Isotopic Investigation of the Boston Lode-Gold Deposit, Hope Bay Volcanic Belt, Nunavut

    By K. Muehlenbachs, J. U. Stemler

    "Abstract - The Boston deposit is a recently discovered Archean lode-gold deposit located approximately 700 km northeast of Yellowknife, in the southern portion of the Hope Bay volcanic belt. Primary

    Jan 1, 2006

  • CIM
    3-D Integrated Geological Modeling in the Abitibi Subprovince (Québec, Canada): Techniques and Applications

    By O. Rabeau, M. Legault, F. Fallara

    "Abstract - The development of robust 3-D geological models involves the integration of large amounts of public geological data, as well as additional accessible proprietary lithological, structural,

    Jan 1, 2006

  • CIM
    Genetic Model and Exploration Guidelines for Kaolin Beneath Unconformities in the Lower Cretaceous Fluvial Chaswood Formation, Nova Scotia

    By D. J. W. Piper, T. Hundert, G. Pe-Piper

    "Abstract - Potentially commercial deposits of kaolin are found in the fluvial Lower Cretaceous Chaswood Formation, the sedimentologically proximal equivalent of deltaic sediments of the offshore Scot

    Jan 1, 2006

  • CIM
    Geophysical Case Study of the Iso and New Insco Deposits, Québec, Canada, Part I: Data Comparison and Analysis

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "Abstract -A test survey using the MEGATEMII airborne electromagnetic system was flown over the Iso and New Insco massive sulfide orebodies in the Rouyn-Noranda mining camp, Canada. The results were c

    Jan 1, 2006

  • CIM
    Geophysical Case Study of the Iso and New Insco Deposits, Québec, Canada, Part II: Modeling and Interpretation

    By D. Bois, P. Keating, J. Lemieux, M. A. Vallée, M. Allard, R. S. Smith, L. Z. Cheng, M. Chouteau, D. K. Fountain

    "Abstract - MEGATEMII airborne electromagnetic data collected over the Iso and New Insco massive sulfide deposits have been modeled using three modeling packages. The EMQ package is a quick inversion

    Jan 1, 2006

  • CIM
    Co-Precipitation of Arsenic with Ferric Ions: Disposal Strategy for Inco's New Weak Acid Treatment Plant Sludge

    By K. Hardy

    As part of Inco's $115 million Fluid Bed Roaster SO2 Abatement Project, a new weak acid treatment plant (WATP) was constructed to treat bleed solutions from the Copper Cliff Smelting Complex gas-

    Jan 1, 2006

  • NIOSH
    OFR 195(2) - 83 - Evaluation of Safety Assessment Methods for the Mining Industry Volume II - User's Manual of Safety Assessment Methods for Mine Safety Officials

    By P. M. Daling

    The objectives of this study were to examine a representative cross section of formal safety analysis techniques developed for the nuclear and aerospace industries, to recommend those methods that wou

    Jan 1, 2006

  • DFI
    Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh

    Jan 1, 2006

  • AUSIMM
    Overview of the Water Provisions in Queensland's Petroleum Legislation

    The emerging coal seam gas (CSG) industry has the potential to provide a large-scale energy province for Queensland. Aquifer impacts and management of associated by-product water, both in terms of qua

    Jan 1, 2006

  • AUSIMM
    Susceptibility and Gamma-Gamma Probe Measurements in Boreholes for Ore Boundary Determinations in LKAB's Iron Ore Mine in Malmberget, Northern Sweden

    LKAB operates two underground mines in Kiruna and Malmberget, Sweden. Blast furnace pellet is the main product and makes up 70 per cent of total production. The orebodies are hosted by 1910 - 1860 Ma

    Jan 1, 2006

  • CIM
    Zinc Ferrite Treatment Options to Increase the Zinc Recovery at Teck Cominco's Trail Operations

    By M. A. Nagle

    Various strategic projects were carried out in 2002 to increase the capacity of Teck Cominco's integrated zinc-lead smelter at the Trail operations site in British Columbia, Canada. The lead smel

    Jan 1, 2006

  • AUSIMM
    Pike River Coal - Hydraulic Mine Design on New Zealand's West Coast

    Pike River Coal Limited is in the process of developing the Pike River Coal Mine in the Paparoa Ranges of New ZealandÆs South Island. The mine will be developed to extract a coking coal deposit of the

    Jan 1, 2006

  • DFI
    Optimized Neural Network Model For The Prediction Of Driven Pile's Resistance

    By Hyun. I. Park

    Although numerous investigations have been performed over the years to predict the behavior and bearing capacity of piles, the mechanisms of these behavior and bearing capacity of piles have yet to be

    Jan 1, 2006

  • AUSIMM
    The Mine Manager's Toolkit

    As the surrounding environment continues to change and evolve, mine managers face a changing climate of expectations. TodayÆs mine managers must juggle competing pressures to deliver sound social, env

    Jan 1, 2006

  • AUSIMM
    Relocating Waihi's Cornish Pumphouse

    WaihiÆs Cornish Pumphouse is located on the edge of town in a dynamic and changeable area where history affects the future. As in any successful project, ingenuity and team work have been significant

    Jan 1, 2006

  • AUSIMM
    Mining to Keep the Home Fires Burning - New Zealand's Energy in the 21st Century

    As a result of cheap Maui gas and plentiful hydro-electricity, over the past few decades New Zealand has enjoyed some of the cheapest energy of any OECD country. The situation is changing; at best we

    Jan 1, 2006

  • TMS
    SPCC's 1,200,000 TPA Copper Isasmelt

    By H. Walqui

    Southern Peru Copper Corporation (SPCC) are currently modernizing the Ilo copper smelter. A single ISASMELT furnace will start smelting 1,200,000 tonnes per year of concentrate during the second half

    Jan 1, 2006

  • SME
    Mining Boom is Sustainable Attendees Told at - SME Annual Meeting 2022

    By Steve Kral

    As the mining industry watches commodity prices continue to soar, the question on most everyone’s mind is how long will this upcycle last. The con-census among speakers and attendees at the SME Annua

    Jan 1, 2006

  • CIM
    Quantifying the Effects That Changes in Transmitter-Receiver Geometry Have on the Capability of an Airborne Electromagnetic Survey System to Detect Good Conductors

    By C. Samson, R. S. Smith, S. W. Hefford

    "Abstract - Time-domain electromagnetic systems are most sensitive to highly conductive targets during the transmitter on-time. Data collected during the on-time is highly influenced by the geometric

    Jan 1, 2006

  • CIM
    Lithogeochemistry and Hydrothermal Alteration at the Halfmile Lake South Deep Zone, a Volcanic-Hosted Massive Sulfide Deposit, Bathurst Mining Camp, New Brunswick

    By L. K. Mireku

    "Abstract - The Halfmile Lake South Deep zone, Bathurst Mining Camp, New Brunswick, was discovered by Noranda Inc. (Exploration) as a result of a 3-D seismic survey in 1998 and the subsequent drilling

    Jan 1, 2006