Search Documents

Sort by

  • CIM
    Latest Fire Protection Innovations for Large-Scale Mining Equipment

    By Don A. Toth

    Until recently, the fire protection systems used to protect mining equipment were based on generically designed, off the- shelf concepts. These systems were reliant on single agent approaches and were

    Apr 1, 2005

  • CIM
    Progressive Failure of Norite Rock Under Biaxial Loading Condition

    By Hani S. Mitri

    Strainbursts in brittle rock are common to deep underground mines. The state of stress at the boundary of mine openings is dictated by a biaxial stress/loading condition. This paper reports the result

    Apr 1, 2005

  • CIM
    Safe Rapid Drifting ? Practical Constraints

    By Fidelis T. Suorineni

    Rapid drifting enables quicker access to orebodies, higher productivity rates and a resultant reduction in activity costs. Increased advance rates, by examination of the key components (face preparati

    Apr 1, 2005

  • CIM
    Data Reassessment of Airborne Geophysical Survey of the Matheson Area - Discover Abitibi Initiative

    By Ken Witherly

    Modern airborne EM surveys typically acquire more data than is processed or analyzed at the time of acquisition Suitable additional processing can provide more diagnostic information, thereby allowin

    Apr 1, 2005

  • CIM
    Using Computer Software to Identify Ore and Waste in Alberta Oil Sands Deposits

    By Jr. Wilkinson

    Suncor Energy currently mines approximately nine hundred thousand tonnes of ore and waste per day at its open pit operations in the Athabasca Oilsands near Fort McMurray, Alberta. Modeling these depos

    Apr 1, 2005

  • CIM
    Mine Closure and Exit Strategies. Risk Financing Solutions for Environmental Liabilities and Sustainability

    By Paul T. Fitzgerald

    Risk financing solutions are emerging to fully address environmental liabilities for mining operations. Supported by specialized insurance and alternative risk transfer (ART) products, mine owners can

    Apr 1, 2005

  • CIM
    SMART Mine Benchmarking ? Pilot to the Future

    By Matthew D. Meyer

    SMART, an association of surface mining companies formed in 1995 to develop a coordinated approach to technology development for the mining industry, has recognized the need for the establishment of a

    Apr 1, 2005

  • CIM
    New Dimensions in Seismic Data Interpretation for Burst-Prone Mines

    By P. K. Kaiser

    3-D virtual reality (VR) visualization has opened new opportunities for complex 3D (x, y, z), 4D (x, y, z, t) or even nD data interpretation. The integration of common earth models (3D geologic data),

    Apr 1, 2005

  • CIM
    Sustaining a natural balance: A practical guide to integrating biodiversity into Rio Tinto's operational activities

    In the past decade, the increased engagement of business in debates around sustainable development has prompted recognition of the importance of biological diversity at the local, national and global

    Apr 1, 2005

  • NIOSH
    Technology News - No. 508 - NIOSH Releases New Safety Video: Make It Safer With Roof Screen

    Coal miners, especially roof bolter and continuous miner operators, work in a hazardous underground environment where they are often exposed to poor roof conditions. Nearly 500 rock fall injuries are

    Mar 1, 2005

  • NIOSH
    IC 9480 - Programmable Electronic Mining Systems: Best Practice Recommendations (In Nine Parts) - Part 6: 5.1 System Safety Guidance

    By John J. Sammarco

    This report (System Safety Guidance 5.1) is the sixth in a nine-part series of recommendations and guidance addressing the functional safety of processor-controlled mining equipment. It is part of a

    Jan 8, 2005

  • NIOSH
    IC 9479 - Coaching Skills for On-the-Job Trainers

    By Launa G. Mallett, Kathleen Kowalski-Trakofler, Robert H. Peters, Charles PH. D. Vaught, Peter Keating, William J. Wiehagen

    On-the-job training is a common means of training or retraining workers and the practice may seem simple and straightforward. Doing it effectively however requires more thought and preparation than si

    Jan 7, 2005

  • AUSIMM
    Iron Ore Mine Reconciliation ù A Case Study From Sishen Iron Ore Mine, South Africa

    By R Moller

    Reconciliation at large iron ore operations is a complex and time- consuming process. Often the volume of data and the large range of different stakeholders makes the process almost impossible. Up unt

    Jan 1, 2005

  • AUSIMM
    Management of Change ù The Transformation of UK Coal Project 105

    In the UK during the 1990s the energy companies had developed a policy of æDash for GasÆ, building large natural gas power stations to produce more than 30 per cent of the UKÆs electricity demand. The

    Jan 1, 2005

  • CIM
    Development of manufacturing process of wrought magnesium alloys by semi-solid roll strip casting

    By H. Watari

    In 1998, a voluntary agreement was reached between the European Commission and the European Car Manufacturers Association (ACEA) to reduce average carbon dioxide emissions of new cars to 25% below 199

    Jan 1, 2005

  • DFI
    The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off Walls

    By Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf

    "Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa

    Jan 1, 2005

  • AUSIMM
    Utilising Statistics and Geostatistics to Validate, Characterise and Improve Geological Domaining ù A Case Study From BHP BillitonÆs Yandi Channel Iron Deposit

    BHP BillitonÆs Yandi channel iron deposit has a large resource of approximately 1.3 billion tonnes. This is a bulk mining operation with a high degree of selectivity not being practical. In contrast t

    Jan 1, 2005

  • CIM
    Impressed Current Cathodic Protection of Pipeline

    By H. Houali

    Corrosion is an electrochemical process that causes degradation and deterioration of various steel works (pipelines, drains, cisterns) whether they are buried, immersed, or not. Worldwide, we estimate

    Jan 1, 2005

  • CIM
    Point of zero charge (PZC) and double layer adsorption - An equilibrium calculation approach

    By C. A. Young, H-H. Huang, L. G. Twidwell

    Solid particles, especially oxides/hydroxides, develop an electrical charge on their surface when submerged in aqueous solution. Parks was able to relate PZC (point of zero charge) of an oxide to its

    Jan 1, 2005

  • ISEE
    Blasting Results Compared Using Crusher Powder Consumption and Tonnage of Rock Produced

    By Ron Glowe

    This paper shows the potential of a new computer model, using the Glowe-Tech (GT) Tonnage Analyzer program to compare drilling and blasting results. This model uses the crushers and conveyors as measu

    Jan 1, 2005