Search Documents

Sort by

  • AUSIMM
    Installation of an Underground Dispatch System and its Use in Business Performance Management Within OsborneÆs Mining Department

    Within the Business Process Improvement Program initiated at Placer Dome during 2003 was the Business Performance Management Project (BPM).BPMÆ s aim has been to extract productivity improvements from

    Jan 1, 2005

  • AUSIMM
    A New Set of Semi-Empirical Equations for Modelling Flotation Deinking of Recovered Papers ù From Laboratory to Pilot Plant

    By P Ottenio, B CarrT

    In the last 40 years, the froth flotation process widely spread in the paper industry becoming the dominant technology for ink removal from recovered paper slurries and cellulose fibres recovery. Most

    Jan 1, 2005

  • AUSIMM
    Off to a Good Start with Lift #2: Drawbell Extraction ù Northparkes

    By M Lovitt, T Hewitt

    The extraction of drawbells in Lift #2 at Northparkes Mines E26 orebody was achieved by single shot blasting, enabled through the use of electronic detonators. This paper discusses the designs conside

    Jan 1, 2005

  • AUSIMM
    Improved Ground Control Using Hydro Scaling and In-Cycle Shotcrete

    By B Upton, J Mitchell

    The use of hydro scaling and in-cycle shotcrete to replace conventional jumbo scaling, mesh and bolting as the primary method of ground control for run of mine development has been investigated throug

    Jan 1, 2005

  • DFI
    Times Square Tower: Urban Squeeze

    By Tony D. Canale, Anthony Mazzo

    "Times Square, arguably one of the best-known destinations in the world, has undergone and continues to undergo a re-development aimed at attracting corporate tenants to the area. Mueser Rutledge Cons

    Jan 1, 2005

  • CIM
    The Metallurgy of High Strength Linepipe Steels

    By A. J. DeArdo

    Linepipe steels have come a long way in the past forty years. In fact, modern, high strength steels for large diameter linepipe applications represent one of the seminal accomplishments in metallurgy

    Jan 1, 2005

  • AUSIMM
    Performance Optimisation of the Imhoflot G-Cell for Fine Coal Cleaning

    By V Gupta, Z Huang, S K. Biswal

    G-Cell is a new design modification of the Imhoflot pneumatic flotation technology, which utilises a self-inducing aerator inside a downcomer, where bubble-particle attachment takes place. The present

    Jan 1, 2005

  • CIM
    Data reconciliation in hydrometallurgy: applications to leaching of clay and copper solvent extraction

    By K. El-Ouassiti, M. Zouadi, C. Bazin, D. Hodouin

    Data reconciliation techniques are used to attenuate the effect of measurement errors and estimate unmeasured variables. This paper illustrates the application of data reconciliation to hydrometallurg

    Jan 1, 2005

  • DFI
    Pile Load Testing in New York City

    By Joel Moskowitz, Jan Cermak

    "New York City has unique geologic conditions which must be considered when designing pile foundations. Where shallow foundations are not feasible, the City's subsurface conditions require a variety o

    Jan 1, 2005

  • SME
    Five To Be Honored By National Mining Hall of Fame

    The National Mining Hall of Fame will induct five mining greats on Saturday, Sept. 17, 2005 at the Museum Convention Center in Leadville, CO. The 18thAnnual National Mining Museum and Hall of Fame In

    Jan 1, 2005

  • AUSIMM
    Real-Time Risk Analysis and Hazard Management

    Safety remains a critical priority for the Australian mineral resource industry and will receive increased focus in the future. This is particularly evident in underground coal mines where reserves ar

    Jan 1, 2005

  • DFI
    Tower Leg Foundation Assessments with Frequency Response and Impedance Profiling Techniques

    By Huw Williams

    "Power companies are always looking to increase the carrying capacity of existing transmission lines, and the preferred method is to string heavier capacity conductor lines. However this results in hi

    Jan 1, 2005

  • SME
    Portland, Oregon’s Alternative Contract Approach—A Work in Progress

    By Paul Gribbon, Greg Colzani, Jim McDonald

    The $300 million West Side Combined Sewer Over?ow Project consists of over5.5 kilometers of soft ground tunnel, an 833-million liter per day (220-MGD) deep shaft pump station, 3 kilometers of micro tu

    Jan 1, 2005

  • SME
    Industrial Minerals 2004 - Cement

    By J. MacFadyen

    The U.S. cement industry experienced its best year ever during 2004 in terms of production and shipments of cement. Clinker, portland and masonry cements production and shipments were up considerably

    Jan 1, 2005

  • AUSIMM
    Early Development of the Theory of Froth Flotation

    By J T. Smit

    The theory of froth flotation developed slowly, in almost all cases lagging behind practical developments in the operation of flotation processes. This was largely the result of a lack of understandin

    Jan 1, 2005

  • DFI
    Analysis of Laterally Loaded Free-Head Pile Groups in Sand

    By Ashraf M. Eid

    Most research dealing with the problem of laterally loaded piles has been the response of individual piles subjected to lateral loads and/or bending moments. However, piles are seldom used individuall

    Jan 1, 2005

  • AUSIMM
    Loading Mechanics of the æCanÆ and Implications for Improved Strength and Stiffness Properties

    Improved roof control in high deformation tailgate environments has been achieved over the last decade through development of stiffer and increased capacity standing support products. æThe CanÆ is one

    Jan 1, 2005

  • SME
    Large Excavator Cuts Operating Costs at Alabama Coal Mine

    By Bill Elverman

    Randy and Kenny Robison have visited every coal mine that would let them in the door, to survey the best mining practices. The brothers have spent nearly their entire lives working in coal operations

    Jan 1, 2005

  • DFI
    Ultimate Bearing Capacity of Small-Diameter Pin-Piles and the Influence of Driving Penetration Resistance

    By Glen Mann, H. G. Vestberg, Robert D. Holtz

    "Underpinning of residential and commercial structures is often accomplished using a number of driven-in-place small diameter steel pipe piles. These piles, at least in the Seattle area, are typically

    Jan 1, 2005

  • AUSIMM
    Bubble Size Effect on the Dynamic Adsorption of Frothers and Collectors in Flotation

    By G M. Evans, C M. Phan

    This paper presents an analysis on the dynamic adsorption of frothers and collectors onto air bubbles in flotation. The analysis was carried out using the theory on the surfactant transfer by diffusio

    Jan 1, 2005