Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Water production as an option for utilizing closed underground minesBy P. Malíková, I. Osičková, R. Sousedíková, P. Rys, J. Dvořáček, S. Heviánková
Each mining project goes through the same life-cycle, from prospecting and exploration to closure and post-closure periods. This prompts the question whether the closure of a mine constitutes the end
Oct 1, 2022
-
A discrete event simulation approach for mine development planning at Codelco’s New Mine LevelBy I. Soto, E. Córdova, A. Anani
The new caving megaprojects that are planned to go into production in the next decade have scheduled horizontal developments at very high rates, which are difficult to achieve. Research has been condu
Oct 1, 2022
-
Application of MR and ANN in the prediction of the shovel cycle time, thereby improving the performance of the shoveldumper operation – A case studyBy S. Dey, C. Bhar, S. K. Mandal
Loading and hauling of ore and waste are the key operations of an opencast coal mine and entail a high operational cost. The productivity of a mine can be increased by reducing the cycle time of loadi
Oct 1, 2022
-
Solving Variable Bedrock Challenges With Ductile Iron PilesBy Kevin R. Johnson, Matt Caskey, Bryan Plaskett
Working in urban environments presents unique logistical challenges beyond those typically associated with traditional geotechnical design and construction. These challenges can include constrained si
Oct 1, 2022
-
Performance Requirements For Vibrocompaction On Crushable Calcareous Sands Of The Uae And Their Verification In Comparison To Silica/Quartz SandsBy Vijaya Bhushan Rao, Jason Redgers
The typical Vibrocompaction projects undertaken in the UAE are on reclaimed Sands. These Sands which are predominantly the crushable, calcareous, carbonate sands found locally as opposed to the more c
Oct 1, 2022
-
Foundation Challenges And Innovative Solutions: The Wharf Phase 2, Washington, DcBy Aaron L. Sacks, David R. Good, Srinivas Yennamanda, Joseph K. Carey
Construction of Parcels 6 and 7, the second phase of The Wharf, began in 2019 and geotechnical construction was completed by December 2020. The overall project consisted of horizontal site, parks, and
Oct 1, 2022
-
Design Of Ground Improvement By Inclined Dsm Columns For Railway Embankment (Türkiye)By Emre Turk, Suat Gullu, Candan Gokceoglu, Ahmet Sirri, Asli Can
In this study, the ground improvement application applied under the live railway bridge's approach embankments in Sivas, Türkiye was investigated as a case study. The soil profile is mainly composed o
Oct 1, 2022
-
A Discussion Of Inconsistencies Between Lrfd And Asd Methods For Geostructural Design Applications Of The Aashto Bridge Design SpecificationsBy Dimitrios Polantzas P. E., Collin E. Sweeney E. I. T., Franklin M. Grynkiewicz P. E., Leili Javidanian P. E.
In the latest AASHTO design specifications, the Load and Resistance Factor Design (LRFD) method is prescribed for the design of retaining walls. However, inconsistencies arise when LRFD is used for re
Oct 1, 2022
-
A Study Of Aspects Of The Historical Development Of Geotechnical EngineeringBy Thomas J. Kennedy, Michael D. Bennett
The study of geotechnical history is well-established. Most geotechnical practitioners, teachers, and graduate students have some grasp of the origins of the field. However, this understanding often c
Oct 1, 2022
-
The Advantage Of Measurement While Drilling (Mwd) For Geotechnical Site CharacterizationBy Anahita Modiriasari, Benjamin S. Rivers
Measurement while drilling (MWD) is a subsurface exploration technique associated with real-time and continuous monitoring and recording of drilling data during the drilling process. This technique ca
Oct 1, 2022
-
Developments In Thermal Integrity Testing Practice And InterpretationBy A. Fisher
The use of thermal integrity testing to verify the quality of deep foundations has increased significantly in the UK and other world markets over the last 5 years. The introduction of distributed fibr
Oct 1, 2022
-
Using Pile Reinforcement To Mitigate Multimodal Slope Failures: A 3D Lem Case StudyBy Javankhoshdel Yacoub
Piles are often used to reinforce slopes as they increase the available restoring force when calculating the factor of safety against sliding. In this paper, a 3D model of a slope containing multiple
Oct 1, 2022
-
Interdisciplinary And Inventive Approaches To Drilled Shaft RemediationBy William D. Oder, Seth H. Hamblin, Les R. Chernatskas, Jonathan L. Ernst
Large diameter drilled deep foundations are a widely utilized solution throughout North America and the world. Numerous design and construction techniques developed over the past 100 years have made t
Oct 1, 2022
-
Assessment, Remediation And Acceptance Of Drilled Shafts Through The Use Of Csl TestsBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan PhD
The experience gained during more than 900 Crosshole Sonic Logging (CSL) tests on drilled shafts shows the importance of establishing proper project acceptance and repair protocols. Drilled shaft eval
Oct 1, 2022
-
Seismic Analysis Of Drilled Shafts As Earth Retaining Structure Based On Site CharacterizationBy Bernardo J. Jiménez Vega, Edy L. T. Montalvan
During the last phase of the Circunvalacion Norte project in San Jose, Costa Rica, preliminary designs for an underpass structure of over 16 km (10 miles) considered drilled shafts as an earth retaini
Oct 1, 2022
-
Design And Field Comparison Of Ground Improvement And Bored Piles For Large Diameter Steel Water TanksBy Vijaya Bhushan Rao, Ali Semercioglu, Jason Redgers
Large diameter steel water tanks with high storage capacities impart heavy loads deep into the ground, generally requiring deep foundations to adequately support them. The use of ground improvement as
Oct 1, 2022
-
High Capacity Drilled Displacement Piles As An Alternative To Conventional Driven MethodsBy Pete Howell, Patrick Granitzki, Alicia Plinio, Janitha Batagoda
The New York City Housing Authority (NYCHA) Red Hook Houses was subjected to damage during Superstorm Sandy. As a result, the NYCHA has an ongoing project known as Restoration Associated with Sandy Re
Oct 1, 2022
-
Maximum height estimation for mine waste dumpsBy S. Chai
Waste dumps are widely used to discharge stripped mine wastes in open pit mining methods. As mining progresses, the height of the waste dumps will increase gradually, which may induce sliding failure
Oct 1, 2022
-
Analytically Modelling Dst Arrival Time Databases With High Order Polynomials For Optimal High Resolution ImagingBy Gerald Verbeek, Erick Baziw
Downhole Seismic Testing (DST) is an extensively utilized geotechnical tool for site characterization. DST provides low strain (<10-5) in-situ interval shear and compression wave velocity estimates. T
Oct 1, 2022
-
Ultrafine Grinding and Atmospheric Oxidation for Refractory Gold OresBy Abrahan Barriga
The present study demonstrates the feasibility of the ultrafine grinding and atmospheric leaching process applied to refractory gold concentrates from Salave Project located in northern Spain. At benc
Sep 30, 2022