Search Documents

Sort by

  • AUSIMM
    Who does the Marketing in the Race for Space?

    This paper has been developed for æThe Race for SpaceÆ conference. It ranges over various aspects, all of which are within the umbrella of marketing. The question is posed because many engineers, tunn

    Jan 1, 1999

  • TMS
    CO2 Sequestration via a Biomimetic Approach

    By G. M. Bond

    Reduction of the emissions of greenhouse gases, such as CO,, is currently the subject of extensive research. A novel strategy is put forward here, based on a biomimetic approach providing accelerated

    Jan 1, 1999

  • AUSIMM
    Modification of Some Failure Criteria for Rock and Coal

    By V S. Vutukuri, K Shariar

    This paper present a modification of selected strength criteria for coal and rocks containing weakness planes. The three strength criteria, namely, Murrell (1965), Bieniawski (1974a, 1983) and Hoek a

    Jan 1, 1999

  • AUSIMM
    Tunnel Procurement Process ù Management Issues and Risk Mitigation ù æGetting it Right from the Beginning - Policy, Management, Procurement, Risk Evaluation and Decision Methodologies for Optimal ResultsÆ

    By T Isaksson, J Anderson

    The procurement process for underground construction contracts, in particular those contacts involving tunnel boring machines (TBMs), is subject to many complex and inter-related variables, including

    Jan 1, 1999

  • SME
    Dust Control Considerations For Deep Cut Mining Sections

    The Mine Safety and Health Administration (MSHA) has conducted studies to evaluate dust control technologies on deep cut continuous mining sections. These surveys have been conducted in different mine

    Jan 1, 1999

  • TMS
    Dynamic Simulation Of The Flash Furnace At The Chagres Smelter

    By R. Parada

    A real-time dynamic simulation model has been developed to characterise the flash furnace operation at the Chagres smelter. This model permits the operators to plan the process to meet the Peirce Smit

    Jan 1, 1999

  • AUSIMM
    Underground Quarrying - A Challenge for the Next Millennium

    By M A. Ohsberg, A C. Robertson

    Quarrying in Australia accounts for a total annual production of around 200 Mt/a of sand, aggregate and materials used in construction. This material has an annual value of the order of $2 billion and

    Jan 1, 1999

  • CIM
    Mining education in South Africa — Past, present and future

    At the end of a century of mining education in South Africa, it is appropriate to reflect on the past, take stock of the present and ponder the future of mining education. While it is likely that chan

    Jan 1, 1999

  • CIM
    Preserving the historical record of Canadian mining and metallurgy

    By Norman R. Ball

    "Many people in the mining and metallurgical industries were brought up to embrace Henry Ford's pronouncement that ""History is bunk"" but it is not generally known that the same Henry Ford creat

    Jan 1, 1999

  • SME
    Risk And Remediation: The Great Rift

    By L. H. Pye

    For large mining sites in the west, the traditional method for performing an ecological risk assessment (ERA) provides little useful information for risk managers faced with selecting and designing so

    Jan 1, 1999

  • SME
    Plant-Site Evaluations Of The OPSA System For On-Line Particle Size Measurement From Moving Belt Conveyors (a2c80e29-57fc-42d5-930c-7b75b81ed0dc)

    By C. L. Lin

    The image-based On-line Particle Size Analyzer (OPSA) system has been developed at the University of Utah to measure particle size distributions under plant conditions where overlapped and segregated

    Jan 1, 1999

  • TMS
    Metal Ion Separations Using Eclectically Switched Ion Exchange

    By Michael A. Lllga

    Electrically Switched Ion Exchange (ESIX) is an approach for ion separation that combines Ion exchange (IX) and electrochemistry by utilizing electro active IX films to provide a selective, reversible

    Jan 1, 1999

  • AUSIMM
    Northside Storage Tunnel Project

    By R J. Cuttler

    In January 1998 Sydney Water Corporation formed an Alliance with construction contractor Transfield, and engineering consultants Connell Wagner and Montgomery Watson, to design and construct the North

    Jan 1, 1999

  • SME
    The Utilization Of On-Line Analyzers At The Blair Athol Coal Mine, Queensland, Australia (05e771d6-7429-4253-b84f-2b12f734c398)

    By G. France

    The Blair Athol Coal Mine (BAC) is a large open cut operation in the Bowen Basin of Queensland, Australia. Current mine capacity is about 11 million tonnes per annum (Mtpa) of export coal. On-line a

    Jan 1, 1999

  • CIM
    SAG milling design trends, comparative economics, mill sizes and drives

    By M. Pfeifer, M. N. Brodie, D. J. Barratt

    "This paper reviews design trends related to the various SAG mill configuration and drive options available today. The impact of these options on capital and operating costs is assessed, and key techn

    Jan 1, 1999

  • SME
    What Geologists (And Perhaps Others) Should Know About Marketing Industrial Minerals, Rocks, And Materials

    By James M. Barker

    Marketing is the linchpin of the industrial-mineral (IM) industry. Without markets and consumers for IM products, all other associated IM activities are superfluous. The simple existence of an IM depo

    Jan 1, 1999

  • TMS
    Can We Close the "Cyanide Cycle"?

    By Emil B. Milosavljevic, Ljiljana Solujic

    Cyanide is exceptionally reactive, and in typical gold/silver processing liquors, cyanide may be transformed into various species and forms depending on the mineralogy of the ore and chemical make-up

    Jan 1, 1999

  • CIM
    A hundred years of the Bayer Process for alumina production

    By Fathi Habashi

    "On August 3, 1888, German Patent No. 43977 entitled ""A Process for the Production of Aluminum Hydroxide"" was issued*. The discovery which led to the patent was made by the Austrian chemist Karl Jos

    Jan 1, 1999

  • TMS
    Recycling Washer Water in the Kroll Titanium Leaching Process

    By S. A. Davis

    In July of 1996, the Kroll process began production again at TIMET's Henderson, NV, manufacturing facility. This, after being shut down for several years due to low market demand for titanium. Fa

    Jan 1, 1999

  • SME
    The State-Of-The-Art In Coal Pillar Design (6a33d9ed-6bb8-48bc-96fc-7206a236ffd8)

    By 1980, the U.S. mining community had reached a broad consensus regarding coal pillar design. The pillar load could be estimated from tributary area theory, and the pillar strength from empirical for

    Jan 1, 1999