Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Underground Mines of TomorrowBy P Hatherly, H Gurgenci
With the depletion of the mineral reserves that can be mined by surface mining, demand for highly productive and safe underground mines will increase. Underground drill and blast techniques continue t
Jan 1, 1998
-
Computer assisted economic analysis to select a stoping methodBy R. R. Tatiya
"The ultimate aim of a mine design is to determine the development work involved and resources required by adopting one or more specific alternatives. A part of the process is the production of mining
Jan 1, 1998
-
The Preparation of Pastefill and Its Use at Some Canadian MinesTwo key elements in the design of a pastefill or high density backfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owing
Jan 1, 1998
-
Kennecott-Outokumpu Flash-Converting Process Copper By Clean TechnologyBy Pekka Hanniala
The Outokumpu Flash Smelting process today is the most feasible method for copper matte smelting. The economic feasibility of the process has always been one of the main decision making criteria in sm
Jan 1, 1998
-
Process Improvements At The Phelps Dodge Chino SmelterBy M. J. King
The Chino Smelter embarked on a program to reduce smelter emissions. Fugitive sulfur dioxide and particulate emissions were reduced by (i) removing the flash furnace settling chamber and (ii) installi
Jan 1, 1998
-
Evaluation Of The Face Ventilation Systems For Extended Cuts With Remotely Operated Mining Machines Using Three-Dimensional Numerical SimulationsThe purpose of this paper is to demonstrate how the Computational Fluid Dynamics (CFD) technique can be an attractive approach to evaluate the performance of face ventilation systems. To present the c
Jan 1, 1998
-
Hydrogen Microprint Technique Applied to Observe Impurity Hydrogen in Aluminum during DeformationBy Akihide Nagao
The behavior of impurity hydrogen that is contained in starting material or picked up during processing has been little investigated up to now. The hydrogen microprint technique is applied to determin
Jan 1, 1998
-
Cyanide Leaching, InterruptedBy Dan A. Mackie
Cyanide leaching operations have taken a beating from the press and the public at large for its seemingly haphazard approach to control of cyanide solutions and containment of tailings. Major spills i
Jan 1, 1998
-
Methodology for developing a stakeholder-based external affairs strategyBy K. L. Azinger
Successful relationships between mining companies and local stakeholders are now an essential part of the social contract of “doing business” (Prescott, 1995). The methodology presented in this paper
Jan 1, 1998
-
Medium voltage switchgear and circuit breaker life extensionBy K. J. Boser
"Medium Voltage (MV) metal clad switchgear is referred to as the voltage class from 2.4 kV to 38 kV. Technological advances in circuit breaker designs over the last 20 years have given rise to retrofi
Jan 1, 1998
-
Psychophysical Strength - Theory And Description Of The Psychophysical MethodologyAccording to contemporary psychophysical theory, the relationship between the strength of a perceived sensation (S) and the intensity of a physical stimulus (1) is best expressed by a power relationsh
Jan 1, 1998
-
Remediation of AMD. The Green Precipitate ProcessBy R. M. Taylor
Lime addition to acid mine drainage (AMD) leads to precipitation, predominantly of metal hydroxides and calcium sulfate, and is the benchmark for remediation by precipitation. Geo2 Limited of Melbourn
Jan 1, 1998
-
Use Of Probability Distributions To Define Baseline Ground Water Quality At A Uranium Mill SiteBy K. J. Bruxvoort
Background ground water quality is often used to drive remediation programs at sites with waters affected by mining activities. In the past these levels were sometimes chosen without rigorous statisti
Jan 1, 1998
-
Recent Developments and Trends in Backfill Practices in CanadaPlanning of modern mines entails considerable challenges in the areas of ground control, materials handling, safety, environment, equipment and personnel. Many orebodies are not economical unless effi
Jan 1, 1998
-
Integration of a Microseismic Monitoring System in Mining the Pasminco Broken Hill Southern Cross AreaBy K P. Tully
In August 1996 a Microseismic Monitoring System developed by ISS International Limited was installed at the Pasminco Broken Hill Mine -Southern Cross area. The project aims were to:Assist in daily saf
Jan 1, 1998
-
The Investigation of High Density and Paste Fills for the Enterprise Mine Expansion Project at Mount Isa (ee90997b-915a-4723-962c-df13e11cf8b6)By Kuganathan K, Potvin Y
Enterprise Mine at Mount Isa is to expand ore production from the current 1.4 to 3.5 mtpa by mining the 3500 Orebody, from which production is scheduled to start in February 1998 making this the dee
Jan 1, 1998
-
Remote Mining in the Canadian Arctic - The Falconbridge Limited Raglan ExperienceIn February 1995, Falconbridge Limited approved the construction of a nickel mining and milling facility on its Raglan property situated in the Nunavik region of northern Quebec, Canada. The construct
Jan 1, 1998
-
Further Studies On Relating The Breakage Properties Of Coal Bore Cores To Preparation Plant Feed (782c3ebc-fc62-4978-be90-da405354173d)By T. E. Wilson
An exploration bore core sample of coal ought to be reduced from its original cylindrical form to a particle size distribution and particle composition that reflects, insofar as possible, a process st
Jan 1, 1998
-
Computational Simulations and Experimental Validation of a Furnace Brazing ProcessBy F. Michael Hosking
Modeling of a furnace brazing process is described. The computational tools predict the thermal response of loaded hardware in a hydrogen brazing furnace to programmed furnace profiles. Experiments we
Jan 1, 1998
-
IOCC Using Expert System to Meet Production and Quality Control GoalsBy Paul Delottinville, Maynard Hall, Henry Hillier
"An expert system application for supervisory control and optimization of the indurating process at the Iron Ore Company of Canada (IOCC) has been developed and installed in closed-loop. Prior to the
Jan 1, 1998