Search Documents

Sort by

  • SME
    Stochastic Approaches To Rock Characterization For The Design Of Underground Structures

    By K. Kim

    A site characterization strategy formulated for the probabilistic design of underground structures is presented, which takes into account the variability of rock properties and the stochastic nature o

    Jan 1, 1995

  • NIOSH
    IC 9432 Mechanical Excavation Systems (In Three Parts) 3. Environmental Applications

    In this U.S. Bureau of Mines report, proposed narrow-vein and longwall mining concepts using drill-split technology (described in part 1 of this series) and in situ liner concepts (described in part 2

    Jan 1, 1995

  • SME
    Laboratory Estimation Of Input Parameters For Simulation Of Long-Term Gas Production Form Coal

    By Satya Harpalani

    The four most important parameters controlling the flow of gas in coal are the gas content, permeability, diffusion coefficient and cleat characteristics. Estimates of these and, more importantly, a k

    Jan 1, 1995

  • SME
    A Computer-Based Decision Support System Approach To Environmental Standards In Quarries

    By C. Woofter

    Quarry operators must continue to change and adapt environmental compliance methods to meet the increasingly demanding regulations. To fulfill industry needs, a computer-based decision support system

    Jan 1, 1995

  • SME
    A Supervisory Expert System For Integrated Plant-Wide Control

    By R. A. Ynchausti

    In January 1993, Pyramid Resources began implementation of a supervisory expert control system at a U.S Cu concentrator. The objective of this control system was to improve plant profitability through

    Jan 1, 1995

  • TMS
    Environmental Auditing Of Dross Toilers What Can The Toiler Expect

    By Daniel S. Gwinner

    The tolling, or processing for a fixed fee, of aluminum drosses to recover the metal units is a common practice in the Aluminum Industry. The Dross Toller is acting for the owner, and since most dross

    Jan 1, 1995

  • SME
    The Crescent Market Project

    By D. A. Meyer

    The long and arduous process of bringing aggregate produced in Mexico to the Gulf Coast of the United States really began in the 1970s when the first exploratory trips were taken by Vulcan's geol

    Jan 1, 1995

  • NIOSH
    IC 9421 A Manganese Consumption And Recycling Flow Model

    By Jr. Gabler

    Because of concern over the availability and reliability of an uninterrupted supply of manganese and other materials, the U.S. Congress requested that the U.S. Bureau of Mines (USBM) study the /low of

    Jan 1, 1995

  • CIM
    Contrasting styles of alkalic porphyry copper-gold deposits in the northern part of the Iron Mask batholith, Kamloops, British Columbia

    "The Crescent, DM, and Pothook zones are copper-gold porphyry deposits which formed in association with alkalic intrusions of the early Jurassic Iron Mask batholith. The characteristics of the Crescen

    Jan 1, 1995

  • TMS
    Removal Of Heavy Metals From Wastewater With Bigadic (Türkiye) Clinoptilolite

    By Hal dun Kurama

    In thus-study, Bigadic upper zone zeolitic tuff, which contains about 87% clinoptilolite was used as an ion exchanger for removal of Pb++, Cu++, Cd++ and Hg++ ions from wastewater. Bench scale experim

    Jan 1, 1995

  • TMS
    Germanium An Aqueous Processing Review

    By Roy J. M. van Lier

    In industrial aqueous solutions, germanium generally occurs in trace amounts amid high concentrations of other metals, such as zinc, copper and iron. Separation of germanium from these metals as well

    Jan 1, 1995

  • TMS
    Producing Commercial Products From Inorganic Wastes

    By C. T. Philipp

    Recycling of waste is much preferred over disposal. This paper discusses the Enviroscience, Inc. (ESI) process, now being commercialized by MetWool, Inc., to recycle hazardous wastes using an extracti

    Jan 1, 1995

  • SME
    Finding The Mining Sequence And Cutoff Grade Schedule That Maximizes Net Present Value (cde8e1ed-4cf8-4a96-8a5a-6d8fe1d35b12)

    By F. Seymour

    A dynamic programming algorithm is presented that takes a series of nested phases, a fixed mining rate schedule, a fixed plant production capacity schedule, and finds the mining and cutoff grade seque

    Jan 1, 1995

  • TMS
    By-Products Of Copper And Nickel Production At Outokumpu Harjavalta Metals Oy

    By J. T. I. Poijärvi

    Outokumpu Harjavalta Metals Oy operates copper and nickel smelters, three sulphuric acid plants and nickel refinery at Harjavalta and copper refinery and precious metal plant at Pori. The by-products

    Jan 1, 1995

  • CIM
    The Lexington-Lone Star copper-gold porphyry: An Early Jurassic cratonic linear system, southern British Columbia

    By B. N. Church, R. H. Seraphim, J. T. Shearer

    "The Lexington-Lone Star CU-Au deposits straddle the Canada U. S.A. border, south of Greenwood, British Columbia. This 3 km long linear porphyry system occurs in a northeast dipping belt of sheared qu

    Jan 1, 1995

  • TMS
    Air Separation Of Heavy Metal Contaminants From Soil

    By Martin E. Nelson

    Several heavy metal separation techniques are currently being developed for soil remediation at various Department of Defense and Department of Energy (DOE) Facilities. The majority of these technique

    Jan 1, 1995

  • SME
    Column Flotation Model Tuning Using A Genetic Algorithm

    By D. Yeager

    Researchers at the U.S. Bureau of Mines have successfully used a genetic algorithm to tune computer models of three column flotation units simulating a separation circuit. The computer models rely on

    Jan 1, 1995

  • AUSIMM
    Solar Salt, Lunar Ambitions

    Solar Salt, Lunar Ambitions I Bauerti The title of this paper is `Solar Salt, Lunar Ambitions'. It is largely the result of a lack of imagination and a tight deadline. I was seeking a catchy ti

    Jan 1, 1995

  • SME
    Closure Review For An Industrial Mineral Property

    By K. L. Kayler

    The Bardon Trimount, Inc. stone quarry in Ashland, Massachusetts was the recent subject of a quarry closure review report. The quarry produces aggregate using standard drilling and blasting techniques

    Jan 1, 1995

  • CIM
    The Mount Polley alkalic porphyry copper-gold deposit, south-central British Columbia

    By D. Gorc, T. M. Fraser, Z. T. Nikic, R. Pesalj

    "Mount Polley is an alkalic porphyry copper-gold deposit of Lower Jurassic age within the Quesnel terrane in south-central British Columbia. The silica-saturated Mount Polley intmsive complex is assum

    Jan 1, 1995