Search Documents

Sort by

  • SME
    InSAR Monitoring of Tunneling Surface Displacement - RETC2021

    By Brian Young, Ben Pantony

    Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O

    Jun 13, 2021

  • SME
    Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry - RETC2021

    By Pafos Busch, Martin Fischer, Johannes Jaeger

    The Spitzenberg Tunnel is a 600 m (1,970 ft) long twin tube motorway tunnel on Germany’s Autobahn A44 between Kassel and Eisenach. Since flexibility was considered to be very important in the continuo

    Jun 13, 2021

  • SME
    Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021

    By Ross Goodman, Jesse Salai

    The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the

    Jun 13, 2021

  • SME
    Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021

    By Taner Aydogmus

    The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co

    Jun 13, 2021

  • SME
    Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021

    By Todd Kilduff, Paul Wilkinson

    Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project

    Jun 13, 2021

  • SME
    The Role of Small Diameter Tunneling for Pipeline Installations - RETC2021

    By P. Schmäh

    Nowadays, small diameter tunnels are increasingly considered in pipeline projects as an alternative for sensitive crossings or when soil conditions limit the use of conventional pipeline installation

    Jun 13, 2021

  • SME
    Influence of Large Deep Excavations on Closely Underlying Subway Tunnels and Design of Mitigation Measures - RETC 2021

    By Giuseppe Gaspari, Xiangrong Wang

    The pandemic emergency is forcing transit agencies to define strategies allowing social distancing, which are more challenging in underground interchange stations in crowded downtown cores. Toronto Tr

    Jun 13, 2021

  • SME
    Use of a GBR to Deliver Risk Management and Value— City Rail Link, Auckland - RETC2021

    By Tom Ireland, Sumi Eratne

    The approach to Risk Management during the procurement of major projects often has a significant outcome on the ultimate successful delivery of a project. The $NZ4.4B Auckland City Rail Link project i

    Jun 13, 2021

  • SME
    Final Lining Construction of a SEM Cavern–Regional Connector Transit Project - RETC2021

    By Christophe Bragard, Rebecca Reeve

    The Regional Connector Transit Corridor (RCTC) Project is a 1.9-mile-long metro light-rail extension project that traverses the historical core of downtown Los Angeles, California. This project aims t

    Jun 13, 2021

  • SME
    Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021

    By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz

    Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met

    Jun 13, 2021

  • SME
    Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021

    By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi

    The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op

    Jun 13, 2021

  • SME
    Segment Production 4.0—Automated Segment Production Using Robots

    By Stefan Mede

    Robot Supported Moulding—this is the name of Herrenknecht Formwork’s entry to the world of automated segment production. What had been considered impossible for a long time, has been achieved by Herre

    Jun 13, 2021

  • SME
    Accelerated Rehabilitation of the White Rock Tunnel - RECT2021

    By Nathan Bowersox, Zuzana Skovajsova, David M. Jurich, Brian Harris

    When unwatered after more than 50 years of operation, the White Rock Tunnel of the Upper American River Project in the foothills of the Sierra Mountains exhibited failing rockbolts and ground falls. R

    Jun 13, 2021

  • SME
    Segment Design for Exceptional Circumstances: Post Tensioning and Squeezing Ground - RETC2021

    By Eduardo Velasco, Paz Navarro, Alfonso Navarro, Claudio Cimiotti, Alejandro Sanz, Nick Karlin

    The LA Effluent Outfall tunnel is a 7-mile long, 18' internal diameter, secondary treated effluent discharge tunnel currently under construction by Dragados USA for the Los Angeles County Sanitation D

    Jun 13, 2021

  • SME
    The Use of Structural Codes in Tunneling - RETC2021

    By Harry Asche

    Tunnels are frequently specified by owners to be designed to a structural code, often a bridge code. In the USA, AASHTO have created a tunnel code, based on structural principles, the AASHTO LRFD Tunn

    Jun 13, 2021

  • SME
    Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021

    By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g

    Jun 13, 2021

  • SME
    Application of Surrogate Modeling for SEM Tunneling Simulation

    By Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney

    This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri

    Jun 13, 2021

  • SME
    Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021

    By Jamal Rostami, Wei Hu

    Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us

    Jun 13, 2021

  • SME
    A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021

    By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer

    Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast

    Jun 13, 2021

  • SME
    Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021

    By David Mast, Irwan Halim, Seung Han Kim

    Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,

    Jun 13, 2021