Search Documents

Sort by

  • SAIMM
    Technical English - a 'dead' language

    By H. W. Glen

    The use of a personal style (mainly active voice and first person) makes technical writing more pleasant to read, and helps the writer to express his meaning clearly and to avoid many of the stylistic

    Jan 1, 1979

  • SME
    Marta's Peachtree Center Station

    By Elwyn H. King, Thomas R. Kuesel

    I. CONCEPT MARTA's Peachtree Center Station is being mined out of hard rock, directly beneath Atlanta's central business district, with minimal surface disruption during construction. Its

    Jan 1, 1979

  • NIOSH
    OFR-116-80 Mine Electrical Power Systems - Enhancement Of Mine Power System Safety And Reliability

    By E. K. Stanek

    This report contains the results of several related research efforts, all of which were aimed at enhancement of mine power system safety and reliability. The largest single effort was on optimum spare

    Jan 1, 1979

  • SME
    A New Geostatistical Model For The Estimation Of Coal Deposits And Other Sedimentary Deposits - Introduction

    By Jean-Michel Rendu

    In most circumstances, the traditional methods of. ore reserve estimation for large undulating sedimentary deposits, such as coal and iron formations, do not allow the accurate prediction of grade for

    Jan 1, 1979

  • AUSIMM
    Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.

    By W. M. LONIE

    Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc

    Jan 1, 1979

  • SME
    Development Of Sherritt's Commercial Nickel Refining Process For Low And High Iron Laterites

    By D. Robert Weir, Verner B. Sefton

    The reduction roast-ammonium carbonate leach-hydrogen reduction process for laterites has been under development by Sherritt Gordon for the past 20 years. The process can treat high iron or low iron l

    Jan 1, 1979

  • SME
    Development Of Inco's Selective Reduction Smelting Process For Nickel Laterite Ores

    By T. T. Toomver

    The evolution of Inco's Selective Reduction Smelting Process as practised today is described, beginning with the initial laboratory experiments on small samples to the processing of large bulk sa

    Jan 1, 1979

  • CIM
    Blasthole Stoping at Inco's Birchtree Mine

    By R. H. Brooks

    Blasthole stoping methods were introduced at Birchtree Mine as an alternative to the original cut-and-fill and shrinkage stoping methods. The object was to take advantage of the ore structure and cond

    Jan 1, 1979

  • SME
    Expansion Of Rosario Dominicana's Gold/Silver Cyanide Plant ? Introduction

    By Stanley M. Moos

    The Pueblo Viejo gold/silver mine, located in the Dominican Republic, started production in early 1974 processing ores averaging 4 g/tonne gold and 20 g/tonne silver at a rate of 7,250 tonnes/day. The

    Jan 1, 1979

  • AIME
    Optimization of Mining Engineering Design in Mineral Valuation

    By Howard M. Wells

    The investment worth of a mineral deposit can only be realistically evaluated in relation to specified engineering design criteria which fully detail the proposed method of exploitation. The operation

    Jan 12, 1978

  • AIME
    Preconcentration Of Native Copper And Porphyry Copper Ores By Electronic Sorting

    By R. W. Nash, A. E. Schwaneke, V. R. Miller

    The Bureau of Mines developed a detector for controlling sorting devices to separate the copper-bearing fragments from the barren portion of Michigan native copper and western prophyry copper ores. A

    Jan 8, 1978

  • AIME
    Blasthole Drilling Doesn't Have to Be Bad

    By Betty J. Laswell, Gerald W. Laswell

    Rotary drilling in modern open-pit mining is usually considered the lead phase which not only establishes the production rates but frequently limits them. From this viewpoint alone, the drilling phase

    Jan 8, 1978

  • AIME
    Iron Ore Co. of Canada's Computerized Analysis Method Speeds Mine Planning and Pit Design

    By Mara Kosovac, Sujan K. Kundu

    The Iron Ore Co. of Canada (IOC) has developed a computerized plan analysis method for its open-pit iron mining operations which will eliminate much of the tedious manual drafting of pit design plans

    Jan 7, 1978

  • AIME
    Who's Who in Mineral Engineering - The 1978 Membership Directory of the Society of Mining Engineers of AIME

    Who's Who in Mineral Engineering - The 1978 Membership Directory of the Society of Mining Engineers of AIME

    Jan 7, 1978

  • AIME
    The Pro's and Con's of Rotary Blasthole Drill Design

    By Betty J. Laswell, Gerald W. Laswell

    The stepped-up pace of US open-pit and surface mining during the 1970's is a direct response by mining firms and equipment manufacturers to rising costs and declining ore grades. In the race for

    Jan 6, 1978

  • AIME
    Mining Engineering's 1977 Annual Review

    It is probably safe to say that, as the economic well-being of the mining industry goes, so goes the fortunes of mineral explorationists. And in 1977 the industry was not well at all. The year-long de

    Jan 5, 1978

  • AIME
    The Professional Development Degree: Continuing Education for the 1980's?

    By Lawrence A. Soltis

    Senior engineering or executive management positions are filled by engineers who are evaluated on their performance, knowledge, skill, and maturity. Not only is technical expertise required but a know

    Jan 4, 1978

  • CIM
    The Tramline

    By Peter C. Jones

    Owing to the inadequacy of the ore transport system at Cassiar in the late 1960's, a new facility was required. This paper traces the various alternatives considered and gives a description of th

    Jan 1, 1978

  • NIOSH
    OFR-103(4)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Executive Report

    By John F. Wiss

    A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond

    Jan 1, 1978

  • CIM
    A Supply System for Western Canadian Thermal Coal

    By E. G. Bazeley

    The paper reviews the scope, timing and financial impact of this significant project, which involves the supply and transportation of nearly 4 million tons per year of bituminous coal and lignite from

    Jan 1, 1978