Search Documents

  • AUSIMM
    Coal Ash Disposal at Rotowaro Minesite: 1 Mt Non-Notified Consent

    By R J. Mills, B S. Sinclair, D A. Fergusson, A G. Goldstone

    In 2005, Solid Energy New Zealand Limited obtained non-notified consent for the disposal of 1Mt of coal ash at the Rotowaro minesite, forming part of a coal supply agreement with the Huntly Power Stat

    Jan 1, 2006

  • ISEE
    Journal: A Case Study of Full-Face Blasting in a Highway Tunnel in Korea

    By Hae-Moon Choi, Sang-Don Lee, Chang-Ha Ryu

    The purpose of the study presented in this article is to establish a standard blast pattern to yield optimum blasting performance along with an attempt to reduce a difference between design and constr

    Jan 1, 2006

  • CIM
    Microwave Sintering Technology and Sintering of YSZ

    By P. Patnaik, F. Cuneo, D. M. Wang

    Microwave (MW) energy has been used widely for several decades for communications, food processing, wood drying, vulcanization of rubber and medical therapy. Recently, this technology was found to be

    Jan 1, 2006

  • TMS
    Comparative Study Of The Effects Of Solidification Rate On The Cast Microstructures Of Aluminum Alloys 6016 And 6009

    By P. N. Anyalebechi

    The effects of solidification rate on the cast microstructures of aluminum alloys 6009 and 6016 have been investigated with directionally cooled laboratory-size ingots, at 0.2-10.1 K/s and 0.4- 23.1 K

    Jan 1, 2006

  • AUSIMM
    Geochemical Mass Balance and Characterisation of Pollutants Draining from a Nickel Mine Site

    By N Dube, K L. Sandvik, C Mutevhe

    Trojan Nickel Mine is the largest producer of Ni, Cu and Co in Zimbabwe. The mine has operated a nickel flotation concentrator and base metal refinery continuously since 1969, creating 28 million tonn

    Jan 1, 2006

  • DFI
    Continuous Grouting In Embedding Of Sheet Piles

    By Jouko L. Lehtonen

    Sheet pile walls can be sealed watertightly using various methods. The objective of this paper is to introduce a new innovation comprising the use of continuous cement grouting during embedding. The m

    Jan 1, 2006

  • TMS
    Freeze Linings In Zinc Fuming Processes

    By Karel Verscheure

    Hydrometallurgical zinc leach residue, EAF dust and other Zn-bearing by-products pose potentially serious environmental problems that threaten the sustainability of the operations. A pyrometallurgical

    Jan 1, 2006

  • AUSIMM
    Time-Lapse Ground Penetrating Radar Survey for Grout Injection Trial at Baal Bone Colliery

    By D Wallace, H Guo, B Shen

    Appropriate management of the ground subsidence induced by coal mining activities is essential. To assess the effectiveness of grout injection for mining subsidence control, time-lapse ground penetrat

    Jan 1, 2006

  • CIM
    Some Aspects of Corrosion Resistance of Magnesium Alloys

    By E. Ghali

    For engineering applications, magnesium is usually alloyed with one or more elements which include aluminium, manganese, rare earth metals, lithium, zinc, and zirconium. Under normal environmental con

    Jan 1, 2006

  • SAIMM
    Composite Failure Mechanisms In Coal Measures Rock Masses - Myths And Reality - 1. Introduction

    By John V. Simmons, Peter J. Simpson

    Excavated slopes in open pit coal mines are designed to be as steep as possible consistent with stability and safety requirements. Slope failures occur for many reasons, including oversteepening. Th

    Jan 1, 2006

  • CIM
    Pilot Plant Demonstration of the Mintek Thermal Magnesium Process

    By M. Abdellatif

    Successful demonstration of The Mintek Thermal Magnesium Process (MTMP) was achieved in November 2004 at the pilot-scale, About 30 tons of magnesium producing recipe was smelted in the DC arc furnace

    Jan 1, 2006

  • NIOSH
    Assessment And Evaluation Of Noise Controls On Roof Bolting Equipment And A Method For Predicting Sound Pressure Levels In Underground Coal Mining

    By Rudy J. Matetic

    Over-exposure to noise remains a widespread and serious health hazard in the U.S. mining industries despite 25 years of regulation. Every day, 80% of the nation’s miners go to work in an environment

    Jan 1, 2006

  • TMS
    A New Advanced CFD Model For Flash Smelting And Converting Processes

    By Tapio Ahokainen

    Commercial modeling software and increasingly efficient computers enable today computational fluid dynamics (CFD) to be used as a tool for a more comprehensive understanding of the flash smelting and

    Jan 1, 2006

  • AUSIMM
    Rehabilitating a Historical Coal Mine in Wangaloa, New Zealand

    By C M. Evans, D Thomas

    Solid EnergyÆs Wangaloa open cast coal mine was operated between 1945 - 1989, and remained closed and disused until 2001 when SENZ initiated a mine rehabilitation programme. It is nearing the final st

    Jan 1, 2006

  • SAIMM
    A Review Of The Design Criteria And Practical Aspects Of Developing A Successful Pre-Split.

    By Simon St J Tose

    The objective of this paper and presentation is to review the different criteria and methodology used by AEL and other organisations to create a pre-split design which delivers a stable highwall for t

    Jan 1, 2006

  • SME
    Industry Technologies Featured at MPES Meeting

    The development of technologies to improve mining and mineral processing is an ongoing process. These new technologies are the result of the industry’s drive to lower costs and improve productivity.

    Jan 1, 2006

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • TMS
    Processing Of Al Alloy-AlN Metal Matrix Composites

    By Vinod K. Namilakonda

    In situ synthesis of discontinuously reinforced aluminum alloy metal matrix composites was investigated. Aluminum alloy (A356: Al-7 wt% Si) was reinforced with dispersed AlN particles. Thermodynamic c

    Jan 1, 2006

  • AUSIMM
    Paragenesis of Hydrothermal Minerals in the Rise and Shine Shear Zone, Otago Schist

    By D Craw

    The Rise and Shine Shear Zone is a mineralised low angle deformation zone traceable for at least 7 km through biotite zone schist of the Dunstan Range, central Otago. Rocks from the shear zone obtaine

    Jan 1, 2006

  • SME
    Determination Of The Optimum Sampling Density For A Multi-Seam Lignite Deposit

    By M. Modis

    According to previously established theoretical analysis and under certain conditions, a critical sampling grid can be determined for an earth-related space-distributed natural variable. Sampling abov

    Jan 1, 2006