Search Documents

  • SME-ICGCM
    Use Of Database In Ground Control To Identify Weightings And Water Inflows

    By G. C. Xiao

    A database, incorporating historical data from British mines, to study the factors affecting inflows from proximate aquifers into longwall workings, showed that a main casual factor was the immediate

    Jan 1, 1990

  • CIM
    The Donalda gold deposit, Rouyn-Noranda, Quebec

    By Gérald Riverin, Bernard Boily, Daniel Bernard

    "The Donalda gold deposit is located in the southern part of the Noranda camp, approximately 2 /em east of the Horne deposit. Combined past production and current reserves total over 1.5 Mt grading 6.

    Jan 1, 1990

  • SME
    Ok Tedi - On Why Ok Tedi Was Found In 1968

    By Colin C. Brooks

    The Ok Tedi gold/copper deposit of almost 800 million tonnes was found in I968 because at that time technology had just developed sufficiently to enable exploration of such an area, world markets and

    Jan 1, 1990

  • CIM
    Disseminated flake graphite and amorphous graphite deposit types: An analysis using grade and tonnage models

    By James D. Bliss, David M. Sutphin

    "On the basis of differences derived from genetic, descriptive, and grade-tonnage data, graphite deposits are classified here into three deposit types: disseminated flake, amorphous (microcrystalline)

    Jan 1, 1990

  • AUSIMM
    Processing Options for Phosphate Oreswith High Fe and Al Contents

    The prospect of utilization of phosphate ores which contain high P205 values associated with Al and Fe has produced a great deal of interest over many years. Processing options have generally been bas

    Jan 1, 1990

  • SME-ICGCM
    Practical Consideration In Longwall Support Selection

    By Thomas M. Barczak

    This report examines practical considerations in longwall support selection that have evolved from Bureau of Mines ground control research. The scope of discussion includes trends in support selection

    Jan 1, 1990

  • AUSIMM
    Shamrock Gold Mine Gets into Production

    The Shamrock Gold Mine has been brought from exploration to production within three years. Mining of the openpit is scheduled for June 1990 with commissioning in April of the 180 000 TPA carbon-in-pul

    Jan 1, 1990

  • SME
    Mine monitoring - Improving protection and productivity

    By P. Worley

    Installation of UP& Is monitoring system was planned to be completed in three stages: Environmental Monitoring, ConveyorBelt Interface, and Power Distribution Interface. With Phases 1 and 2 completed

    Jan 1, 1990

  • SME
    Influence Of Circulating Load And Classification Efficiency On Mill Throughput

    By D. D. Schlepp

    There is a continuing debate about the influence of circulating load and classifier efficiency on the capacity of the circuit. Specifically, the effects of preferential classification, bypassed fines,

    Jan 1, 1990

  • SME
    Colloidal and Kinetic Principles Of Sol-Cel Processing

    By K. V. S. Sastry, A. J. Hunt, K. D. Lofftus

    Sol-gel processing is rapidly becoming an important process for producing such advanced materials as high activity catalysts, fiber optics and ceramic precursors. These materials can be tailor made wi

    Jan 1, 1990

  • NIOSH
    Effect of Particle Size and Modulation Frequency on the Photoacoustic Spectra of Silica Powders

    By M. S. Seehra, R. S. Pandurangi

    "Investigations of the infrared spectra of crystalline and amorphous silica particles of different sizes (0.05, 5, 10, 15, 30, 45, and 260 um) in the range of 400-4000 cm-1 using Fourier transform inf

    Jan 1, 1990

  • AUSIMM
    Small-Charge Cone-Fracture Technique for Rapid Excavation

    By Fourney W. L, Dick R. D

    A small-charge rapid excavation system employing a novel penetrating cone fracture initiation and propagation technique has been demonstrated to be capable of excavating the hardest of rocks at effi

    Jan 1, 1990

  • SME
    Metal Recovery From Metallurgical Wastes

    By K. S. Gritton

    The U.S. Bureau of Mines has investigated methods for extracting metals from a variety of arsenic-containing smelter flue dusts. One proposed flowsheet includes a sulfuric acid leach, a cooling step t

    Jan 1, 1990

  • ISEE
    New Photo-Optic System for Adaptation to Measure VOD

    By William H. Snyer

    A relatively inexpensive, very fast response photo-optic/fiberoptic system has been conceived, constructed and employed by Denver Research Institute (DRI) to measure charge breakout uniformity on the

    Jan 1, 1990

  • SME
    Investigation Of The Feasibility Of Natural Gamma Radiation Coal Interface Detection Method In U.S. Coal Seams

    By G. L. Mowrey

    One critical element of the U.S. Bureau of Mines (Bureau) autonomous mining research program is the development of a reliable coal interface detection (CID) system. Several candidate CID concepts curr

    Jan 1, 1990

  • CIM
    The use of rock drains in surface mine waste dumps

    By B. M. Das, F. Claridge, V. K. Garga

    Coal, as well as a large part of other minerals in Canada, is produced by surface mining methods. This has resulted in short and long-term accumulation of waste rock in dumps. Two main problems arise

    Jan 1, 1990

  • SME
    Development And Calibration Of An Integrated Hydrologic Model

    By R. M. Powers

    The Florida Institute of Phosphate Research (FIPR) has funded a four-year research project to develop a computer model 'which will predict the hydrologic impacts of phosphate mining on surface an

    Jan 1, 1990

  • TMS
    Industrial Applications of Large Lead-Acid Batteries for Emergency and Peak Power Demand

    By William C. Spindler

    Five industrial installations of large lead-acid battery energy storage systems in operation in the United States, West Germany and the 'Republic of South Africa will be described. One example i

    Jan 1, 1990

  • CIM
    Precious metals losses in pyrometallurglcal processing

    By J. G. Whellock, J. W. Matousek

    "In spite of their importance to the economics of many metallurgical projects, the values and technical aspects of precious metals losses in smelting operations are relatively undeveloped subjects. Th

    Jan 1, 1990

  • SME-ICGCM
    Three-Dimensional Analysis Of Mine Dump Point Stability

    By Radoslaw L. Michalowski

    The operation of mobile mining equipment near the crest of stockpiles and wastedumps often results in localized slope failures. The Bureau of Mines has developed a computer code based on a rigorous li

    Jan 1, 1990