Search Documents

  • SME
    Fast Track Construction Project -A Case Study

    By D. C. Moore

    The decision to proceed on a "fast track" construction project is not" without risks as well as rewards. An understanding of some of the risks prior to start of the project will maximize the rewards.

    Jan 1, 1988

  • AUSIMM
    Brazil - Gold - 2000

    By Subrahmanyam T. V, Rao V. D

    GOLD, the most important and highly coveted valuable metal, is being sought and exploited in almost all the geological environ- ments by the developed, developing and underdeveloped coun- tries of th

    Jan 1, 1988

  • DFI
    Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall Performance

    By Reinhard Gnilsen

    Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i

    Jan 1, 1988

  • TMS
    Overview of Cobalt Supply and Production

    By L. R. Verney

    About 75% of the market economy countries's supply of cobalt is produced in Central Africa by Zafre and Zambia. Zafre alone accounts for more than 55% and has the resources and capacity to increa

    Jan 1, 1988

  • SME
    Evaluation of copper dump and heap leaching situations

    By J. M. Keane, C. K. Chase

    Critical to successful dump and heap leaching of copper is an adequate evaluation of applicable parameters. This paper deals with methods to establish optimum conditions for dump and heap leaching cop

    Jan 1, 1988

  • NIOSH
    Mineral Resources Of The Spring Basin Wilderness Study Area, Wheeler County, Oregon ? Summary

    By Richard A. Winters

    In 1987, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied the 6,022-acre Spring Basin Wilderness Study Area (OR-005-009) in order to evaluate its mineral resource

    Jan 1, 1988

  • SME
    WEMCO/LEEDS Flotation Column Development

    By John B. Sabey, Vernon R. Degner

    The industrial coal processing trend toward greater fines production, due to mining techniques and customer requirements for reduced ash and sulphur content in the fine coal product, is the basis for

    Jan 1, 1988

  • SAIMM
    The Properties Of Hydraulically Placed Backfill

    By I. H. Clark

    A variety of backfills is presently being placed in different gold mines. The backfills are pumped as slurries to stopes where they are discharged into some form of retaining paddock. The effectivenes

    Jan 1, 1988

  • AUSIMM
    Delay Variability-The Measurement, Analysis and Implication on Rockj Blasting

    By Mckenzie CK

    Delay scatter, although widely recognised, has rarely been studied with the aim of critically reviewing blast designs. With current trends towards increased deck charging, and the effect on the numb

    Jan 1, 1988

  • AUSIMM
    Minimising Coal Edge Losses in Dragline Blasting Operations

    By Yang RL, Bailey ML

    During overburden blasting operations in dragline pits, coal edge losses along the lowwall edge of the new pit are often experienced. In tonnage terms, losses can be significant. With the thick seams

    Jan 1, 1988

  • NIOSH
    RI 9166 - Determining Corrosion Rates in Industrial Ore Grinding Environments

    By A. E. Isaacson

    Bureau of Mines researchers developed and tested equipment to measure corrosion rates on a commercial scale mill. Bench-scale experiments were designed for duplicating ore grinding conditions closely

    Jan 1, 1988

  • TMS
    Mineralogy-Related Processing Problems of Epithermal Gold-Silver Ores

    By Wolfgang Baum

    Case studies from epithermal gold-silver deposits in the western United States and in Latin America show that the routine use of process-related mineralogical studies has become an important tool for

    Jan 1, 1988

  • NIOSH
    RI 9137 - Electrokinetic Densification of Solids in a Coal Mine Sediment Pond-A Feasibility Study - (In Two Parts) 2. Design of an Operational System

    By R. H. Sprute

    The Bureau of Mines conducted a feasibility study and designed an operational system for consolidating waste coal sludge in a 110-acre pond by applying direct current between buried and floating elect

    Jan 1, 1988

  • NIOSH
    RI 9150 - Leaching of Domestic Manganese Ores With Dissolved S02

    By John E. Pahlman

    The Bureau of Mines conducted column-leaching tests on 25 domestic Mn ores to determine the feasibility of extracting Mn by in situ or heap leaching with dissolved sulfur dioxide (S02) solutions. The

    Jan 1, 1988

  • TMS
    Primary Cobalt Production-1987 and 1988

    By W. S. Kirk

    World cobalt production in 1987 was estimated to be about 26,600 metric tons (MT) of which Market Economy Country (MEC) production was estimated to be about 22,000 MT. Zaire and Zambia produce about 8

    Jan 1, 1988

  • SME
    Requirement of Airflow Reversal with Respect to the Proposed Nuclear Waste Repository in Basalt

    By Daniel J. Brunner

    The U. S. Department of Energy (D.O.E.) requires that the prospective nuclear waste repository in Basalt at Hanford, Washington, comply with State of California mine and tunnel safety orders. These re

    Jan 1, 1988

  • AUSIMM
    Environmental Investigations and Procedures to Support Mining Consent Applications

    By M Foster

    The new environmental legislation of 1986 was left incomplete and to date remains so. The 'missing' process by which environmental consideration should be applied was never embodied in law a

    Jan 1, 1988

  • SME
    Environmental Permitting Considerations For True In Situ Copper Mining In The State Of Arizona

    By Ralph E. Weeks

    Utilization of true in situ technologies for mining copper in Arizona will involve a complex environmental permitting process. This process is a key factor in determining the feasibility, costs, and i

    Jan 1, 1988

  • SME
    Environmental Liability In Project Construction And Management

    By M. S. Bickers

    Prior to 1970, the environmental liabilities associated with mine construction and management were few. Mostly, they were aimed at health and safety matters. At that time less than two dozen codes wer

    Jan 1, 1988

  • NIOSH
    MLA 44-88 - Mineral Resources Of The Eldorado Study Area, Clark County, Nevada ? Summary

    By J. Douglas Causey

    In 1987, at the request of the Bureau of Land Management, the U.S. Bureau of Mines studied 11,069-acres of the 12,290-acre Eldorado Wilderness Study Area (NV-050-423) in order to evaluate its identifi

    Jan 1, 1988