Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Fast Track Construction Project -A Case StudyBy D. C. Moore
The decision to proceed on a "fast track" construction project is not" without risks as well as rewards. An understanding of some of the risks prior to start of the project will maximize the rewards.
Jan 1, 1988
-
Brazil - Gold - 2000By Subrahmanyam T. V, Rao V. D
GOLD, the most important and highly coveted valuable metal, is being sought and exploited in almost all the geological environ- ments by the developed, developing and underdeveloped coun- tries of th
Jan 1, 1988
-
Advanced Soil Mailing Design - Improved Reliability And Predictability Of Wall PerformanceBy Reinhard Gnilsen
Soil Nail walls, like any other structure, must meet high standards of design to be acceptable to the public and owners. On the other hand, the concept of soil nailing trails behind other structures i
Jan 1, 1988
-
Overview of Cobalt Supply and ProductionBy L. R. Verney
About 75% of the market economy countries's supply of cobalt is produced in Central Africa by Zafre and Zambia. Zafre alone accounts for more than 55% and has the resources and capacity to increa
Jan 1, 1988
-
Evaluation of copper dump and heap leaching situationsBy J. M. Keane, C. K. Chase
Critical to successful dump and heap leaching of copper is an adequate evaluation of applicable parameters. This paper deals with methods to establish optimum conditions for dump and heap leaching cop
Jan 1, 1988
-
Mineral Resources Of The Spring Basin Wilderness Study Area, Wheeler County, Oregon ? SummaryBy Richard A. Winters
In 1987, at the request of the U.S. Bureau of Land Management, the U.S. Bureau of Mines studied the 6,022-acre Spring Basin Wilderness Study Area (OR-005-009) in order to evaluate its mineral resource
Jan 1, 1988
-
WEMCO/LEEDS Flotation Column DevelopmentBy John B. Sabey, Vernon R. Degner
The industrial coal processing trend toward greater fines production, due to mining techniques and customer requirements for reduced ash and sulphur content in the fine coal product, is the basis for
Jan 1, 1988
-
The Properties Of Hydraulically Placed BackfillBy I. H. Clark
A variety of backfills is presently being placed in different gold mines. The backfills are pumped as slurries to stopes where they are discharged into some form of retaining paddock. The effectivenes
Jan 1, 1988
-
Delay Variability-The Measurement, Analysis and Implication on Rockj BlastingBy Mckenzie CK
Delay scatter, although widely recognised, has rarely been studied with the aim of critically reviewing blast designs. With current trends towards increased deck charging, and the effect on the numb
Jan 1, 1988
-
Minimising Coal Edge Losses in Dragline Blasting OperationsBy Yang RL, Bailey ML
During overburden blasting operations in dragline pits, coal edge losses along the lowwall edge of the new pit are often experienced. In tonnage terms, losses can be significant. With the thick seams
Jan 1, 1988
-
RI 9166 - Determining Corrosion Rates in Industrial Ore Grinding EnvironmentsBy A. E. Isaacson
Bureau of Mines researchers developed and tested equipment to measure corrosion rates on a commercial scale mill. Bench-scale experiments were designed for duplicating ore grinding conditions closely
Jan 1, 1988
-
Mineralogy-Related Processing Problems of Epithermal Gold-Silver OresBy Wolfgang Baum
Case studies from epithermal gold-silver deposits in the western United States and in Latin America show that the routine use of process-related mineralogical studies has become an important tool for
Jan 1, 1988
-
RI 9137 - Electrokinetic Densification of Solids in a Coal Mine Sediment Pond-A Feasibility Study - (In Two Parts) 2. Design of an Operational SystemBy R. H. Sprute
The Bureau of Mines conducted a feasibility study and designed an operational system for consolidating waste coal sludge in a 110-acre pond by applying direct current between buried and floating elect
Jan 1, 1988
-
RI 9150 - Leaching of Domestic Manganese Ores With Dissolved S02By John E. Pahlman
The Bureau of Mines conducted column-leaching tests on 25 domestic Mn ores to determine the feasibility of extracting Mn by in situ or heap leaching with dissolved sulfur dioxide (S02) solutions. The
Jan 1, 1988
-
Primary Cobalt Production-1987 and 1988By W. S. Kirk
World cobalt production in 1987 was estimated to be about 26,600 metric tons (MT) of which Market Economy Country (MEC) production was estimated to be about 22,000 MT. Zaire and Zambia produce about 8
Jan 1, 1988
-
Requirement of Airflow Reversal with Respect to the Proposed Nuclear Waste Repository in BasaltBy Daniel J. Brunner
The U. S. Department of Energy (D.O.E.) requires that the prospective nuclear waste repository in Basalt at Hanford, Washington, comply with State of California mine and tunnel safety orders. These re
Jan 1, 1988
-
Environmental Investigations and Procedures to Support Mining Consent ApplicationsBy M Foster
The new environmental legislation of 1986 was left incomplete and to date remains so. The 'missing' process by which environmental consideration should be applied was never embodied in law a
Jan 1, 1988
-
Environmental Permitting Considerations For True In Situ Copper Mining In The State Of ArizonaBy Ralph E. Weeks
Utilization of true in situ technologies for mining copper in Arizona will involve a complex environmental permitting process. This process is a key factor in determining the feasibility, costs, and i
Jan 1, 1988
-
Environmental Liability In Project Construction And ManagementBy M. S. Bickers
Prior to 1970, the environmental liabilities associated with mine construction and management were few. Mostly, they were aimed at health and safety matters. At that time less than two dozen codes wer
Jan 1, 1988
-
MLA 44-88 - Mineral Resources Of The Eldorado Study Area, Clark County, Nevada ? SummaryBy J. Douglas Causey
In 1987, at the request of the Bureau of Land Management, the U.S. Bureau of Mines studied 11,069-acres of the 12,290-acre Eldorado Wilderness Study Area (NV-050-423) in order to evaluate its identifi
Jan 1, 1988