Search Documents

  • SME
    Practical aspects of corrosion in the wear of grinding media

    By D. M. Smith, M. J. Meulendyke, P. J. Moroz

    An extensive program of marked ball wear testing (MBWT), laboratory corrosion studies, and worn ball surface analyses has been used to gain insight about the role of corrosion in the overall wear proc

    Jan 1, 1988

  • AUSIMM
    Rational Longwall Layout Design Based on Numerical Stress Analysis

    By Klenowski

    Rational design of layouts for longwall operations is greatly facilitated by use of an accurate and economical method for predicting stresses and displacements. The displacement discontinuity meth

    Jan 1, 1988

  • CIM
    Use of fly ash in backfill at Kidd Creek Mines

    By T. R. Yu, D. B. Counter

    "In an effort to increase productivity, the use of fly ash as a binder for consolidated backfill was studied. From laboratory and underground tests f or its cementitious properties and environmental e

    Jan 1, 1988

  • ISEE
    Implementation of Blast Vibration Frequency Control Technology at R & F Coal Company

    By Doug Johnson

    This paper reviews the field implementation of R & F Coal's blasting optimization work concerning analysis, prediction, and control of overburden blasting vibrations using site specific measurements a

    Jan 1, 1988

  • CIM
    The recovery and utilization of fine coal

    By W. L. Thayer, K. A. Jonasson, R. D. Coleman, J. D. Hazlett, C. E. Capes

    "Loss of coal fines in reject slurries limits the yield of coal cleaning operations. Difficulties in handling fines also limit the extent of physical cleaning in treating coals with finely-disseminate

    Jan 1, 1988

  • AUSIMM
    Water Management to Protect Wetland to the North of the Rhenish Lignite District

    By Trumpff H

    Opencast Lignite Mining requires topwall strata of seams to be fully depleted and footwall aquifers sufficiently depressurized. To prevent a spread of the cone of depression into protected wetlands

    Jan 1, 1988

  • SME
    Coal Recovery. From Refuse Ponds Employing Flotation Techniques

    By G. E. Wasson

    Coal in most refuse ponds including those owned by Consolidation Coal Company can be recovered by froth flotation techniques. Laboratory studies show that the flotation conditions required for coal re

    Jan 1, 1988

  • CIM
    Laboratory and pilot-plant beneficiation of chromite ore from Bird River, Manitoba (1247a540-347d-460b-96be-84ffa86f2377)

    By P. R. A. Andrews, I. Jackman

    "A mineral processing investigation to recover chromite was performed at Lakefield Research, under the guidance of CANMET personnel, on a 70 tonne ore sample from the Bird River deposit in Manitoba. I

    Jan 1, 1988

  • AUSIMM
    Parameters Affecting the Shield Support Efficiency in Longwall Mining

    By Hsiung SM, Jiang YM

    The orientation and location of the hydraulic legs are two very important parameters for the design of shield supports in longwall mining. Studies have shown that leg orientations and locations of

    Jan 1, 1988

  • CIM
    Maintenance Engineering - Failure and repair of a mine hoist drumshaft

    By James E. Rider

    "Fractures in mine hoist drumshafts are rare. We know of no previously reported attempts to repair a fractured drumshaft; any feasible method would involve welding and the associated problems of disto

    Jan 1, 1988

  • SME
    Title to U.S. Gold Mines: An Introduction for Canadian Junior Mining Companies

    By Richard Keith Corbin

    Canadian junior mining companies whose gold exploration and exploitation programs take them across the border into the western United States should be prepared to deal with the myriad of title issues

    Jan 1, 1988

  • SAIMM
    Engineering Research And Development With Respect To J C I Backfill Operations

    By A. C. Wingrove

    The paper outlines the selection of a dewatered tailings backfill system for the Johannesburg Consolidated Investment Gold Division, and covers the following aspects: (i) 16 Shaft pilot testwork;

    Jan 1, 1988

  • AUSIMM
    Aeromagnetometry and Aeroradiometry of Gabal El Kahfa Ring Complex, Eastern Desert, Egypt

    By Rabie A. S, Fouad K. M, Ammar A. A

    The existence of Gabal El Kahfa ring complex, located in the Eastern Desert of Egypt, has been ascertained from aeromagnetic and aeroradiometric survey data as well as by aerial photography. Two m

    Jan 1, 1988

  • SME
    Domestic utilization of high sulfur coals : Trends and prospects

    By S. Bhagwat

    Coals capable of emitting 2 lbs SO2/106 Btu heat input must be defined as high sulfur coals. This is because electric utility plants built after 1971 may not emit more than 1.2 lbs SO2, and those buil

    Jan 1, 1988

  • CIM
    Hibernia-its impact on aggregates from Atlantic Canada

    By R. Flood

    "Oil has been discovered off Newfoundland in a number of locations on the Grand Banks, the most notable and exciting being in 1979 when Hibernia was discovered. This discovery has brought new challeng

    Jan 1, 1988

  • AUSIMM
    Design Selection and Application of a Pressure Filtration System to the Dewatering of Copper and Lead Sulphide Slurries

    By Hawes GW

    Until 1980 copper, lead and zinc sulphide slurries have been success- fully dewatered for rail and sea transport for many years at the Rose- bery site of North Broken Hill Holdings Ltd. utilizing conv

    Jan 1, 1988

  • CIM
    Owl Creek Processing Summary

    By O. Matwijenko

    "1. IntroductionThe Falconbridge Owl Creek open pit gold mine is located 17 km northeast of Timmins and 2.5 km west of the Kidd Creek metallurgical site. Diamond drilling first commenced in 1964 with

    Jan 1, 1988

  • SME
    Performance evaluation of indicator kriging in a gold deposit

    By Y. C. Kim, I. S. Roditis, P. K. Medhi

    The strongly skewed grade distributions and the need to estimate the local recoverable reserves in a selective mining environment are the two problems that ordinary kriging (OK) cannot easily handle.

    Jan 1, 1988

  • AUSIMM
    Four Metre Diameter Raise Drilling at Olympic Dam Project S.A.

    In the first half of 1987 two four metre diameter raise bore holes were drilled at the Olympic Dam Project for ventilation purposes. The first hole, 476 m x 4.0 m diameter was completed in 96 days

    Jan 1, 1988

  • SME
    Factors Influencing The Structure of a 3-Phase Coal Flotation Froth

    By J. B. Stockton, D. J. Robbins, E. T. Woodburn

    Batch flotation data in an equilibrium cell show that beneficiation improves with froth drainage. The limiting lamella thickness in a well- drained 3-phase coal froth appears to be determined for

    Jan 1, 1988