Search Documents

Sort by

  • AUSIMM
    Setting new standards at Kanmantoo – effective grade control procedures

    By M Reid, H Arbon

    Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an

    Sep 20, 2017

  • AUSIMM
    Using existing data to improve the delineation of ore at the Olympic Dam Fe-oxide Cu-U-Au-Ag deposit

    By K Ehrig, J Griffith

    An extensive suite of elements are routinely assayed on all resource drill core samples to assist in deposit scale resource definition, local mine scale delineation of ore zones, and ore characterisat

    Sep 20, 2017

  • AUSIMM
    Sampling strategy by statistical analyses of LIBS data in the context of a portable gold analyser

    By M Castello, P Bouchard, M Sabsabi, A Blouin, B Nguegang Kamwa, M Constantin, K Fytas, M Laflamme, K Rifai, F Vidal

    Canada’s Quebec province operates 26 metal mines, 19 of which are producing gold and generating over C$1.8 billion (US$1.3 billion) annually. In all those mines, numerous samples of rock are collected

    Sep 20, 2017

  • AUSIMM
    Measuring ore quality using real-time on-belt elemental analysis – more than grade control

    By H Kurth

    Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce

    Sep 20, 2017

  • AUSIMM
    Testing new estimation techniques – rank and replace: a stockwork case study

    By D Finn, D Kentwell

    Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-

    Sep 20, 2017

  • AUSIMM
    Blast movement monitors or polypipe? A study into cost-effective blast movement monitoring at White Foil gold mine, Western Australia

    By M E. Watson

    Minimising dilution and ore loss is an important part of ensuring profitability of a gold mining operation. White Foil open pit gold deposit is a low-grade deposit and therefore managing ore quality i

    Sep 20, 2017

  • AUSIMM
    Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, Laos

    By B Saunders, J Carpenter

    PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug

    Sep 20, 2017

  • AUSIMM
    Local uncertainty benchmarking – a coal case study

    By R Saha, D Barry, C Mawdesley, O Bertoli

    Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often

    Sep 20, 2017

  • AUSIMM
    Go with the flow – managing hydrogeological staff turnover at Ernest Henry mine

    By C Hawtin, B Miller, D Ashton

    Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we

    Sep 20, 2017

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    Charles Dickens on the (potentially) changing role of globalisation and sustainability in the long-term future of mining and exploration

    By J P. Sykes, T C. McCuaig, M Jessell, A Trench

    The election of Donald Trump and the Brexit referendum herald a shift towards a tighter definition of economic value, at the expense of the broader value concept of sustainable development; as well as

    Sep 20, 2017

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Improving coal quality estimations using geostatistics and auxiliary variables

    By P Dowd, R Jeuken, C Xu

    In Australian coalmines there are a number of coal quality parameters that are measured by analysing samples from boreholes. The data points are used to generate spatial models of these parameters, ty

    Sep 20, 2017

  • AUSIMM
    Steve and Fred would have been mates – a comminution design evolution story

    By D David

    Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i

    Sep 11, 2017

  • AUSIMM
    Critical process design considerations from test work to operations

    By A Dennis, T Hunter, R Coleman

    For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin

    Sep 11, 2017

  • AUSIMM
    Economic recovery and upgrade of metals from middling and tailing streams

    By M Hourn, G Anderson, V Lawson, P Voigt, D Mallah

    As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flow sheets to achieve saleable concentrate become more difficult to design and construct.

    Sep 11, 2017

  • AUSIMM
    Implementation of the BIOX® process at the Runruno Gold project

    By J A. van Niekerk, J G. Jardine, J W. Olivier

    The Runruno Gold Project is located on the island of Luzon, approximately 200 miles north of Manilla in the Philippines. The mine is an open cut operation and uses the proven BIOX® and carbon-in-

    Sep 11, 2017

  • AUSIMM
    Assessing bulk sorting suitability at the New Afton mine

    By H Kurth, L Balzan

    On-belt analysers have been used since the early 1980s in the coal sector to measure ash content in real time for diverting material on conveyors to remove waste, bypass beneficiation and allow suitab

    Sep 11, 2017

  • AUSIMM
    Nui Phao mine – flotation circuit upgrade

    By S Morgan, A Jakowetz, S Taylor, B Weekes, S Litson, P Bourke, T L. Do

    In the current tough mining environment with lower commodity prices, operators need to improve operational profitability. Optimised equipment asset management is a sustainable way to achieve this obje

    Sep 11, 2017

  • AUSIMM
    Mt Isa copper concentrator cleaner circuit redesign

    By P Radulovic, V Lawson, M Muller, J Wallace

    The Mount Isa Copper Concentrator was commissioned in 1973. Since commissioning some significant upgrades have been undertaken such as: • the replacement of the rod mill/ball mill circuit with AG mill

    Sep 11, 2017