Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Compressor Ar De Alimentação- Fabrica De Oxigênio Nº 1 Da Arcelormittal Aços Planos América Do Sul - Engenharia Reversa Nos Rotores Do 3º E 4º Estágios De CompressãoBy Eduardo Luiz Sales Marinho
A Fábrica de oxigênio da AMT produz gases O2 e N2, utilizados no processo de produção de aço. Neste processo de fracionamento de ar, existe um compressor de ar que é responsável pela captação do ar at
Sep 25, 2017
-
Controle Dos Ruídos Elétricos Na Instrumentação IndustrialBy Otaviano Donizeti Valadão de Freitas
Ruídos elétricos afetam os circuitos lógicos e conseqüentemente podem comprometer a confiabilidade nos controles de processos, e para minimizar as influências desses ruídos, algumas medidas básicas fo
Sep 25, 2017
-
Optimización Energética Y Confiabilidad Operativa En La Producción De Gases Del AireBy Daniel Eduardo Parodi
Para acompañar el plan de aumento de producción de slabs de Siderar, fue necesario proyectar una nueva unidad separadora de aire para incrementar la generación de oxígeno, nitrógeno y argón. La premis
Sep 25, 2017
-
Modernização Dos Analisadores Contínuos De Hidrogênio Da UpgBy Mauro Martins Machado
As misturadoras da UPG têm como finalidade produzir uma mistura de gases denominada HN, combinando proporcionalmente o Hidrogênio e Nitrogênio (75/25 e 5/95) para gerar a atmosfera de proteção para os
Sep 25, 2017
-
Setting new standards at Kanmantoo – effective grade control proceduresBy M Reid, H Arbon
Hillgrove Resources (HGO) commenced open pit mining in 2011 and from 2011 to 2016 the geology team experienced a consistent negative reconciliation between grade control estimated copper (Cu) grade an
Sep 20, 2017
-
Using existing data to improve the delineation of ore at the Olympic Dam Fe-oxide Cu-U-Au-Ag depositBy K Ehrig, J Griffith
An extensive suite of elements are routinely assayed on all resource drill core samples to assist in deposit scale resource definition, local mine scale delineation of ore zones, and ore characterisat
Sep 20, 2017
-
Sampling strategy by statistical analyses of LIBS data in the context of a portable gold analyserBy M Castello, P Bouchard, M Sabsabi, A Blouin, B Nguegang Kamwa, M Constantin, K Fytas, M Laflamme, K Rifai, F Vidal
Canada’s Quebec province operates 26 metal mines, 19 of which are producing gold and generating over C$1.8 billion (US$1.3 billion) annually. In all those mines, numerous samples of rock are collected
Sep 20, 2017
-
Measuring ore quality using real-time on-belt elemental analysis – more than grade controlBy H Kurth
Mining geologists utilise many technologies to map, sample, measure, model and plan before and during the mining process. Predicted ore quality rarely corresponds with feed quality determined by proce
Sep 20, 2017
-
Testing new estimation techniques – rank and replace: a stockwork case studyBy D Finn, D Kentwell
Experience has shown that the E-Type multiple indicator kriging (MIK) estimation technique often works well for resource estimation in stockwork mineralisation that contains a mixture of high and low-
Sep 20, 2017
-
Blast movement monitors or polypipe? A study into cost-effective blast movement monitoring at White Foil gold mine, Western AustraliaBy M E. Watson
Minimising dilution and ore loss is an important part of ensuring profitability of a gold mining operation. White Foil open pit gold deposit is a low-grade deposit and therefore managing ore quality i
Sep 20, 2017
-
Empirical mill throughput modelling and linear programming for blend optimisation at the Phu Kham copper-gold operation, LaosBy B Saunders, J Carpenter
PanAust’s Phu Kham copper-gold operation (Phu Kham) in Laos is currently limited by throughput in the Semi Autogenous Grinding (SAG) mill. The ability to accurately predict SAG mill throughput (throug
Sep 20, 2017
-
Local uncertainty benchmarking – a coal case studyBy R Saha, D Barry, C Mawdesley, O Bertoli
Kriged estimates are not typically calculated on blocks substantially smaller than the sample spacing (eg the Standard Mining Unit or SMU). Moreover, the sample spacing for quality variables is often
Sep 20, 2017
-
Go with the flow – managing hydrogeological staff turnover at Ernest Henry mineBy C Hawtin, B Miller, D Ashton
Ernest Henry mine (EHM) is an Iron oxide copper-gold sublevel cave mine located 30 minutes north of Cloncurry in North-West Queensland. The underground mine lies beneath open pit excavations, which we
Sep 20, 2017
-
Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditingBy M A. Noppé
Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine
Sep 20, 2017
-
Charles Dickens on the (potentially) changing role of globalisation and sustainability in the long-term future of mining and explorationBy J P. Sykes, T C. McCuaig, M Jessell, A Trench
The election of Donald Trump and the Brexit referendum herald a shift towards a tighter definition of economic value, at the expense of the broader value concept of sustainable development; as well as
Sep 20, 2017
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mineBy M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Improving coal quality estimations using geostatistics and auxiliary variablesBy P Dowd, R Jeuken, C Xu
In Australian coalmines there are a number of coal quality parameters that are measured by analysing samples from boreholes. The data points are used to generate spatial models of these parameters, ty
Sep 20, 2017
-
Steve and Fred would have been mates – a comminution design evolution storyBy D David
Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i
Sep 11, 2017
-
Critical process design considerations from test work to operationsBy A Dennis, T Hunter, R Coleman
For metallurgical plant design, it is necessary to progress through successive phases of test work, piloting and process development before involving all the other engineering disciplines and “freezin
Sep 11, 2017
-
Economic recovery and upgrade of metals from middling and tailing streamsBy M Hourn, G Anderson, V Lawson, P Voigt, D Mallah
As mine head grades decline and orebodies become more complex, traditional mineral processing techniques and flow sheets to achieve saleable concentrate become more difficult to design and construct.
Sep 11, 2017