Decisions, Decisions – Uncertainty, Variability, Modelling and PsychologyBy S H. Begg
There is strong evidence that many major oil and gas (O&G) projects are plagued by large cost and schedule overruns, or significant underperformance in productivity. Similar evidence exists for la
May 9, 2016
-
Automated Train Ore TransportBy J Fisher, M Castro, A Hariyadi
The train haulage system being designed for PT Freeport Indonesia’s Grasberg Block Cave (GBC) will be located within the mine at an elevation of almost 3000 m above sea level on the west side of the i
May 9, 2016
-
The Social Psychology of Risk, Safety and Leadership MaturityBy R Long
The founder of social psychology is sometimes identified as Kurt Lewin. In a 1947 article, Kurt Lewin coined the term ‘group dynamics’. He described this notion as the way that groups and individuals
May 9, 2016
-
The Evolution of Block Caving TechnologyBy A J. Weston
Block or panel caving technology is far removed from that of the top slicing and block caving of the late nineteenth or early twentieth centuries. The rapid mechanisation and expansion of these method
May 9, 2016
-
The Application of Rock Engineering Systems to Block Caving to Identify the Effective ParametersBy M Mohammad Khani
An economic block cave is dependent to the characteristics of the rock mass at stages of caving. These are cave initiation, propagation and ore flow. In this research, the rock engineering system (RES
May 9, 2016
-
Development of an Integrated Platform for the Analysis, Modelling and Design in Panel Caving MinesBy G Pizarro, O Miranda, D Rosales
In panel/block caving mines, large amounts of information are collected at the operations. This information includes grades and extracted tonnage, fragmentation, lithology, design of stopes and main i
May 9, 2016
-
Simplifying the Ore Handling System through the Use of Current Technology at Chuquicamata Underground Mine ProjectBy P Paredes, T Leaño, D Gajardo, C Tramón, S Peñaloza
The definition of an ore handling system and its consequent layout design is of crucial importance in cave mining projects. It not only represents the main driver in the production capacity and reliab
May 9, 2016
-
Northparkes Mines’ Current Air Blast Risk Assessment Practices for Block Caving OperationsBy C Vejrazka
Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig
May 9, 2016
-
Modelling of Real-time Marker Data to Improve Operational Recovery in Sublevel Caving MinesBy A D. Campbell, G R. Power
The increasing availability of marker data in sublevel caving operations is changing the way draw can be managed to achieve positive recovery outcomes in these mines. This paper describes how marker d
May 9, 2016
-
Understanding Rock Mass Behaviour through the Development of an Integrated Sensing PlatformBy E Widzyk-Capehart, C Hölck Teuber, S Steffen, V Rivero, O Fredes, E Sanchez, I Pedemonte, N Gonzalez
This paper summarises the research, development and initial application of a sensing platform that has the potential to monitor subsurface deformations, pore pressure and other variables simultaneousl
May 9, 2016
-
An Investigation of Factors Affecting the Long-term Reliability of Extraction Level Pillars in Deep Block and Panel CavesBy P Duplancic and C R Lilley, R Hudson, D Beck
For deep block and panel caving mines, undercut or extraction level instability can have as much impact on overall recovery as underbreak or the premature ingress of waste. If the area of the mine aff
May 9, 2016
-
Discrete Fracture Network Modelling – Importance of Accounting for Data Uncertainty and VariabilityBy S Rogers, D Stead, E Eberhardt
The last decade has seen a major increase in use of the discrete fracture network (DFN) approach applied to cave mining problems, often integrated within more complex geomechanical simulations. Becaus
May 9, 2016
-
Life-of-mine Development and Production Scheduling Optimisation for Sublevel Cave OperationsBy G Chitombo, A Perryman, A D. Campbell, J White, B Hollis
This paper describes the development and implementation of an optimisation tool developed as part of the Mass Mining Technology (MMT) Project. The tool, known as the SLC Schedule Optimiser, is capable
May 9, 2016
-
SME Annual Conference features more than 120 sessions, 6,300 attendeesBy Georgene Renner, Chee Theng, William Gleason
"More than 6,300 people attended SME’s 2016 Annual Conference & Expo in Phoenix, AZ and many of them made the trip to the conference to take part in the excellent technical sessions that are presented
May 1, 2016
-
Construction — You need risk-based cost estimatingBy A. Moergeli, Philip Sander, John J. Reilly
"Estimating and managing the costs of complex infrastructure projects – in the planning/design and construction phases, for both owners and contractors – has been a challenge for decades. The more com
Apr 1, 2016
-
Evolution of a mega project: Update on the Bay Delta TunnelsBy Howard Lum, Sergio Valles, John Bednarski, Gordon Enas, Jay Arabshahi
"Water drawn from the Sacramento-San Joaquin Delta provides water supply to 66 percent of California’s population and supports the state’s agriculture industry. The existing through-Delta water system
Apr 1, 2016
-
Making Studies Work – Organisation, Communication and ManagementBy P McCarthy
"This paper is based on 30 years of involvement in feasibility studies as a participant, study manager and the leader of a firm that provides study components and overall study management. The followi
Mar 8, 2016
-
Leadership in Projects – A Recipe for SuccessBy A A. Roberts, R F. Dewhirst
"Extensive literature surveys, research in the project environment and personal experiences both within and consulting to project teams have revealed some consistent ‘people factors’ that contribute m
Mar 8, 2016
-
Strategic Decision-making in Mining – Business Optimisation Using Flexible Evaluation ModelsBy B E. Hall, D B. Kahler
"'Optimisation' has become a catchcry among many mining companies looking to tell the market how mining businesses will be improved and shareholder value increased. Consequently, the term 'optimisatio
Mar 8, 2016
-
Are Your Megaproject Schedules and Costs Under – or Out of – Control?By P Mitchell, S Pushpan, G Ferres, K Bobbermien, L Hudson
"Falling commodity prices and a rising supply surplus have ushered in a period of restraint in capital project investment across the global mining and metals sector. Competition for capital project fu
Mar 8, 2016