Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Crusher Vision Automation System: Closed Side Setting Measurement and Mainshaft InstallationBy T. Shumka, M. J. Druckenmiller
"INTRODUCTION As we push further into the 21st century and closer to a more efficient mine, safety and operational enhancements are the two major keys towards attaining success. The Crusher Vision Aut
Jan 1, 2015
-
Probabilistic Analysis for Mine Design, Using Coal Pillar Design to Illustrate its Potential UsefulnessBy T. R. Kostecki, J. Hirschi
"Analytical engineering design is based upon a trial-and-error iterative and deterministic process. Within this process, the engineer obtains some estimated values, plugs them into de facto closed-for
Jan 1, 2015
-
Scientifically Difficult and Challenging Issues in Chinese Rock EngineeringBy P. Lin, S. G. She
"In June 1985, Chinese Society for Rock Mechanics and Engineering (CSRME) was established. During the past 30 years, various major achievements are made in the discipline of rock mechanics and rock en
Jan 1, 2015
-
Results of Discrete Event Simulation in a Large Open Pit Mine (01b83ee3-82e5-44b3-a9e0-f828c81066c7)By S. R. Dindarloo
"Truck-shovel systems are the dominant material loading and haulage machinery in open pit mining operations. Optimal selection, sizing, and allocation of this capital intensive equipment is highly des
Jan 1, 2015
-
Observations of Swelling and Associated Phenomena in Markusberg Tunnel, Schengen, LuxembourgBy Robert Maquil, Gilles Didier, Walter Steiner
"The 1580 m long dual-tube motorway tunnel Markusberg near Schengen, Luxembourg experiences strong swelling phenomena in each tube related to a 35 m wide diagonally crossing rock layer, some150 to 200
Jan 1, 2015
-
A Procedure for the Rapid Assessment of Coal Mine Roof Stability against Large Roof FallsBy Ted Klemetti, Gabriel Esterhuizen, John L. Ellenberger
"Advanced numerical models can be used to evaluate entry support systems in coal mines. However, these methods require specialized software and specialized skills to create the models and evaluate the
Jan 1, 2015
-
Numerical Simulation of the Stress Field in Wushaoling TunnelBy Yang Shuxin, Guo Qiliang, He Ping, Lu Lizhi, Yao Rui
"We combined stepwise regression and constrained regression statistical method to obtain the best boundary conditions for the calculation of in-situ stress field in Wushaoling tunnel using finite elem
Jan 1, 2015
-
On The Use of Cement Content Determination Tests for Deep Mixing ProjectsBy Emilie Lapointe, Fernando Famania
"A reliable determination of the in-placed cement factor, as defined by mass of cement over volume of final element of treated soil, allows the optimization of cement usage to achieve treated soil req
Jan 1, 2015
-
Development of Power Stabilization Systems for Electric Arc FurnacesBy D. Shen, J. Cheung
Variable reactance arc control by the SPLC (Smart Predictive Line Controller) has been installed at many different mining sites and steel processing plants around the world. Since its first installati
Jan 1, 2015
-
Geotechnical Risk Management to Prevent Coal Outburst in Room and Pillar MiningBy Peter Zhang, Dan Neilans, Scott Peterson, Scott Wade, Joe Pugh, Ryan Mcgrady
"A coal outburst is a severe safety hazard in room-and-pillar mining under deep cover. It is more likely to occur during pillar retreating. Multi-seam mining dramatically increases the risk of coal ou
Jan 1, 2015
-
Geomet: Modelling Metallurgical Parameters from Exploration and Resource DataBy Pim van Geffen, Dave Lawie, James Cleverley
A growing problem facing geoscientists, metallurgists and process engineers is the lack of knowledge transfer between the exploration and production teams. This siloing is generally unintentional, as
Jan 1, 2015
-
Hydraulic Rock Fracture Damage Quantification using Acoustic Emission Source ParametersBy D. Hu, L. Matzar, J. Hampton, M. Gutierrez
Nanodarcy permeability is common in many oil- and gas-bearing formations requiring unconventional stimulation technologies, such as hydraulic fracturing (HF), which can connect the isolated hydrocarbo
Jan 1, 2015
-
Damage and Unstable Failure of Rock under Coupled THM Conditions during Deep-Level MiningBy W. C. Zhu, C. H. Wei, L. L. Niu
With an increase of mining depth, a series of mining-induced hazards such as rockburst, coal and gas outburst, roof collapse, and water burst are getting more serious and more frequent. The intrinsic
Jan 1, 2015
-
Effects of Fabrication Process Parameters on the Microstructure of Ferritic/Martensitic Oxide Idspersion Strengthened (ODS) Steel Components for Future Nuclear Reactor System ApplicationsBy S. Noh, T. K. Kim, B. O. Lee
Future nuclear reactor systems such as a sodium-cooled fast reactor are being designed under severe conditions in terms of operating temperature and irradiation fluence compared to current commercial
Jan 1, 2015
-
Integrating Technology: Learning from Mine Worker Perceptions of Proximity Detection SystemsBy E. J. Haas, K. A. Rost
"This study sought to identify changes in continuous mining machine (CMM) operators’ risk perception and risk behaviors as a result of adding a proximity detection system (PDS) into their environment.
Jan 1, 2015
-
Interpretation of UCS Test Results for Engineering DesignBy P. K. Kaiser, C. D. Martin, F. Amann
"This article focuses on the uniaxial compressive strength (UCS) of homogeneous and heterogeneous rocks. Critical factors impacting the UCS of rocks are reviewed and then separate assessments of UCS d
Jan 1, 2015
-
Characterization of Damage in a Cast Aluminum Alloy during Cyclic Loading Test at High Temperature by X-Ray TomographyBy A. Koster, V. Maurel, S. Dezecot, Szmytka. F.
The aim of this work is to clarify the role of microstructure heterogeneity in the initiation and growth of cracks in a lost foam cast A319 for low cycle fatigue (LCF) loading condition. Because 2D an
Jan 1, 2015
-
In-Situ Stress Measurement at Shallow Depth in the Vicinity of the Epicenter Before and after the 2011 Tohoku-Oki EarthquakeBy K. Sakaguchi, T. Yokoyama
"In-situ rock stress measurement was carried out in the Kamaishi mine of Iwate Prefecture to quantify the variation of the shallow crustal stress field associated with the 2011 Tohoku-oki earthquake.
Jan 1, 2015
-
In Situ Stress Measurements in a Drilling Hole Penetrated to the Tohoku-Oki Earthquake Fault: Indication of Coseismic Stress ChangeBy Weiren Lin
The Mw 9.0 Tohoku-Oki, Japan earthquake occurred on 11 March 2011 produced a maximum coseismic slip of >50 m near the Japan Trench. To investigate why the plate boundary fault between the subducting P
Jan 1, 2015
-
Experimental Study on the Bending Failure Properties of Cement-Treated SoilBy Takeru Fukaya, Tsutomu Namikawa
"The bending tensile stress occurs in the ground improvements when external forces are applied to the column and wall shaped ground improvements. Therefore, in the design of the column and wall shaped
Jan 1, 2015