Search Documents

Sort by

  • AUSIMM
    Measured Resources and Proven Reserves – Are they still Relevant?

    By S Juras

    The terms measured resources and proven reserves denote the highest level of estimation confidence in all of the major classification schemes. But what do they really bring to today’s project or mine

    Aug 22, 2011

  • AUSIMM
    Design of Grade Control Sampling Programs for Underground Gold Mines

    By S C. Dominy

    Grade control programs aim to deliver economic tonnes to the mill via accurate definition of ore and waste. The foundation of a successful program is high quality sampling supported by geology and a s

    Aug 22, 2011

  • AUSIMM
    Improved Grade Control using Reverse Circulation Drilling at Mogalakwena Platinum Mine, South Africa

    By G Kirk

    Definition and delineation of in-pit ore and waste material are the most significant tasks for an open pit production geologist; adding or destroying value in the mining value chain. Anglo American’s

    Aug 22, 2011

  • AUSIMM
    Quantifying Uncertainty in a Narrow Vein Deposit – An Example from the Augusta Au-Sb Mine in Central Victoria, Australia

    By A Fowler

    The unpredictability of the location, grade and width of narrow-vein deposits presents difficulties for mine geologists and engineers attempting to estimate, schedule, forecast and mine their deposit

    Aug 22, 2011

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Mineral Resource Modelling and Reconciliation in Ultra Deep Underground Gold Mines

    By R C. A Minnitt

    The Witwatersrand Supergroup is host to the world’s largest gold deposits. The location, quantity, grade, continuity and other geological characteristics of a Mineral Resource are either known, estima

    Aug 22, 2011

  • AUSIMM
    Quantifying Plant Flow Availability for an Alumina Refinery Expansion using Dynamic Simulation

    By B Reynolds

    The process design for green- or brown-fields metallurgical plants typically starts with two fundamental elements: the detailed mass and energy balance and the plant flow availability. The detailed m

    Aug 8, 2011

  • AUSIMM
    Sensible Cost Cutting for Resource Projects

    By D Connelly

    As the resources sector becomes tougher with rising costs and cyclical metal prices, mining companies need to continue to reduce their costs and do more with less. Many new resource projects fail to c

    Aug 8, 2011

  • AUSIMM
    Keeping Projects on the Rails

    By J Canterford

    Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be

    Aug 8, 2011

  • AUSIMM
    Crushers – An Essential Part of Energy Efficient Comminution Circuits

    By R Bearman

    The importance of crushers in the mining industry declined with the introduction and resultant dominance of AG and SAG based circuits, but the recent move to consider more energy efficient circuits ha

    Aug 8, 2011

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Recent Improvements to the Gravity Gold Circuit at Marvel Loch

    By A Bird

    Gravity gold circuits have an important part in reducing operating costs and maximising recovery in modern gold plants where coarse gold is present in the ore body. The design and selection of equipme

    Aug 8, 2011

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Increasing Capacity and Efficiency of Grinding Circuits with High Frequency Screens

    By J Wheeler

    The objective of this paper is to examine the operation of high frequency screens in closed circuit grinding, where the outcomes achieved indicate favourable economic gains at the comminution stage an

    Aug 8, 2011

  • AUSIMM
    Predicting Variations in Mill Feed

    By P McCarthy

    The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction

    Aug 8, 2011

  • AUSIMM
    The Influence of Liner Wear on Milling Efficiency

    By P Toor

    Due to the high energy consumption of milling, it is desirable to improve the efficiency of this process. One alternative to reduce energy and material consumption while optimising production yield in

    Aug 8, 2011

  • AUSIMM
    Solvent Extraction of Uranium – Towards Good Practice in Design, Operation and Management

    By P Bartsch

    Uranium solvent extraction, USX has been applied commercially for recovery and concentration for over 50 years. Uranium in acidic liquor, which is prepared following ore leaching, solid/liquid separat

    Aug 8, 2011

  • AUSIMM
    Comparative Study of Iron Ore Characterisation by Optical Image Analysis and QEMSCANTM

    By E Donskoi

    In order to develop downstream processing routines for iron ore and to understand the behaviour of the ore during such processing, extensive mineralogical characterisation is required. To determine mi

    Jul 11, 2011

  • AUSIMM
    The Scratch Test – An Attractive Method to Measure the Strength of Iron Ore Material

    By L Mariano

    Three selected iron ore samples from the major bedded and channel iron deposits of Western Australia were analysed using a scratch test commonly used in the oil and gas industry. The portable commerci

    Jul 11, 2011

  • AUSIMM
    Quantitative X-Ray Mineralogy of Iron Ore and Scales

    By K Knorr

    Desktop X-ray powder diffraction using a D2 PHASER equipped with fast linear detector was performed on several iron ore and mill scale samples. Data were analysed using cluster analysis and Rietveld q

    Jul 11, 2011