Principal Components Analysis of ToF-SIMS Data: Application to Mineral Recognition, Surface Reaction and Separation by FlotationBy Brian Hart, Roger St. C. Smart, James Francis, Mark Biesinger
"There are a number of challenges involved with the surface analyses of different mineral phases from process streams in a flotation facility. The first of course is to collect samples that are repres
Jan 1, 2007
-
Cave management at Finsch Mine - SynopsisBy C. A. Preece
Finsch Diamond Mine, part of De Beers Consolidated Mines (DBCM), is situated between Kimberley and Postmasburg in the Northern Cape, South Africa. The kimberlite pipe was discovered in 1960 and De Bee
Jan 1, 2007
-
Mettop Process Control and Regulation SystemBy I. Filzwieser, A. Filzwieser
The Peirce Smith converter is the key metallurgical vessel in the majority of copper smelters. During the two step process, oxygen enriched air is injected through a row of tuyeres into the matte rece
Jan 1, 2007
-
Cadia East Open Pit Project Mining StudyThe Cadia Valley Operations currently hosts a large operational open pit, a large operational sublevel caving underground mine and two other underground projects at the study stage. This scenario crea
Jan 1, 2007
-
The Finch-McIvor Functional Performance Based Grinding Circuit Modeling SystemBy James A. Finch, Robert E. McIvor
"This paper presents the development of a new grinding circuit steady-state modeling system. It is fundamentally based on the “functional performance equation”, which has now been used to improve the
Jan 1, 2007
-
Surprises And Solutions When Driving Piles In Mountain Valleys Of VermontBy John E. Lens
Driving bridge foundation piles into glacio-fluvial sands and gravels and glacial tills brought surprisingly longer than predicted driving lengths on several recent projects in Vermont. In some insta
Jan 1, 2007
-
Energy Calculations for SAG Grinding of a Sulfide Copper OreThe most expensive unit operation in the beneficiation of ores is grinding. The correct design of the grinding circuit is crucial to prevent unnecessary use of energy. Proper design and evaluation of
Jan 1, 2007
-
Estimating the Remaining Fatigue Life of Stockyard MachinesBy S Rice, A Midlin
Many of the stacking and reclaiming machines employed in the mining industry today are operating in ways that were never envisaged in the days before they were commissioned, with greater throughput, i
Jan 1, 2007
-
Mechanical properties and fatigue resistance of rails welded with the aluminothermic methodBy J. P. Sancho, J. M. Duart, J. I. Verdeja, J. O. García
Following a short review of the history of rails used in the transport of passengers and goods, this paper describes the process for rail fabrication, rail structure, and properties, and summarizes th
Jan 1, 2007
-
Can Mine to Mill Optimisation Succeed Under Complex Constraints?By D Thornton, B Smith, S Demey
Mine to Mill (MTM) optimisation, a total systems approach to the reduction of energy and cost in mining and mineral processing operations, is well-established technology. However, successful applicati
Jan 1, 2007
-
Optimisation of Slope Angles at Rosario Mine, CollahuasiBy A R. Bonani, M P. Pe±a
The optimisation of slope angles, that is to say, increasing them, compared to the original design is always the subject of analysis of stability for geotechnical engineers and economic analysis for p
Jan 1, 2007
-
Computer Simulation of Vibrating Screen in a Dry Classification Circuit Case Study - Gol-e-Gohar Iron Ore Processing PlantBy A Mehrani, F Zamani, A Dehghani
Vibrating screens play an important role in the dry classification circuit of Gol-e-Gohar iron ore processing plant. This circuit was designed to classify the autogenous mill discharge and produce a s
Jan 1, 2007
-
Quality Assurance and Quality Control of the Interpretation of the Geological Economic Commodity Concentrations is Important in Getting a Mineral Resource Estimate RightThe mining industry, both here and internationally, is continually developing increasingly sophisticated software to compute mineral resource estimates, but these processes cannot compensate for a fla
Jan 1, 2007
-
The Noranda continuous converter at Xstrata Copper, Rouyn-Noranda— optimization of slag chemistryBy M. Zamalloa, P. J. Mackey, P. Coursol, Y. Prévost
"Over the last decade or so, the availability of commercial thermodynamic modelling packages, such as FactSageTM, have been utilized to help the plant optimize slag chemistry and to minimize slag hand
Jan 1, 2007
-
Data mining, mining data: Energy consumption modellingBy S. Dessureault
The relatively recent explosion of available data in all business sectors has induced a common expression of “drowning in data, starving for information.” The mining sector is affected by the informat
Jan 1, 2007
-
BHP Billiton Iron Ore Car Dumper 4 - Temporary WorksBy D Ford
BHP BillitonÆs new rotary iron ore car dumper installation at Finucane Island (Port Hedland) was constructed to increase the total capacity of the port facility from 110 Mtpa to 120 Mtpa and to allow
Jan 1, 2007
-
The Kensico-City Tunnel Will Add Reliability to New York City’s Water Supply SystemBy Verya Nasri, Heather M. Ivory, Kevin Clarke, Eric Cole
Development of the New York City Water Supply System The New York City water supply system serves a population of almost nine million, including residents in neighboring counties. Peak day demands
Jan 1, 2007
-
Case Study - Total Life Cycle Planning for a Greenfield SiteCentral to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl
Jan 1, 2007
-
New Test Methodology For Estimating The Abrasiveness Of Soils For TBM TunnelingBy F. Dahl, P. Raleigh, J. Holzhauser, B. Nilsen
Tunnel excavation using tunnel boring machines (TBMs), has become increasingly common in recent years, despite the fact that precise evaluation of certain risks have not kept pace with the use of thes
Jan 1, 2007
-
Numerical Information System Supporting Safe Management Of Copper Post-Flotation Tailings Pond "Elazny Most", PolandBy W. Swidzinski
"Zelazny Most" post-flotation copper mine tailings pond is the only place to of storeing wastes for KGHM POLSKA MI EDZ S.A. The flotation tailings is are the main waste stream in copper mining in Pola