Search Documents

Sort by

  • CIM
    Mine Closure and Exit Strategies. Risk Financing Solutions for Environmental Liabilities and Sustainability

    By Paul T. Fitzgerald

    Risk financing solutions are emerging to fully address environmental liabilities for mining operations. Supported by specialized insurance and alternative risk transfer (ART) products, mine owners can

    Apr 1, 2005

  • CIM
    Assessment of Material Diggability for Shovel Excavation in Oil Sands

    By Sibabrata Patnayak

    A major problem during shovel excavation in oil sand mining is the variability of material diggability resulting in varying mechanical energy input, cycle time, energy consumption, wear, and stress lo

    Apr 1, 2005

  • CIM
    New Dimensions in Seismic Data Interpretation for Burst-Prone Mines

    By P. K. Kaiser

    3-D virtual reality (VR) visualization has opened new opportunities for complex 3D (x, y, z), 4D (x, y, z, t) or even nD data interpretation. The integration of common earth models (3D geologic data),

    Apr 1, 2005

  • CIM
    Sustaining a natural balance: A practical guide to integrating biodiversity into Rio Tinto's operational activities

    In the past decade, the increased engagement of business in debates around sustainable development has prompted recognition of the importance of biological diversity at the local, national and global

    Apr 1, 2005

  • CIM
    Electrochemical Behavior of An X-80 Pipeline Steel During Stress-Corrosion Cracking in Near-Neutral-pH Environment

    By B. Fang

    Electrochemical behavior of an X-80 pipeline steel, including frequency-sweep electrochemical-impedance spectroscopy (EIS), time-sweep EIS at a constant frequency and open-circuit potential (OCP) moni

    Jan 1, 2005

  • CIM
    Point of zero charge (PZC) and double layer adsorption - An equilibrium calculation approach

    By C. A. Young, H-H. Huang, L. G. Twidwell

    Solid particles, especially oxides/hydroxides, develop an electrical charge on their surface when submerged in aqueous solution. Parks was able to relate PZC (point of zero charge) of an oxide to its

    Jan 1, 2005

  • AUSIMM
    Differential Cut-Off Grades

    Detailed underground mine design and optimisation studies undertaken by the author over the past few years have clearly demonstrated that additional value can be created by varying the cut-off grade (

    Jan 1, 2005

  • DFI
    Thirty Years of Experience with the Wave Equation Solution Based on the Method of Characteristics

    By Peter Middendorp, Gerald E. H. Verbeek

    "This paper will describe a brief history of the method of characteristics as an accurate solution of the wave equation, and the author's experiences with the method of characteristics over a period o

    Jan 1, 2005

  • CIM
    Selecting of Appropriate Electrode in Fully Salt-Water by Fuzzy Logic

    By S-E. Vandat

    The goal of this work was to select an appropriate electrode for dummy load of diesel engine in fully salt-water in the DESA factory. The electrochemical corrosion rate of general structural steel, co

    Jan 1, 2005

  • AUSIMM
    Guidelines for the Design of Rope Guides

    Rope guides, consisting of ropes spanning between anchor points at the top and bottom of shafts, have frequently been considered as a viable alternative to fixed guides, comprising buntons and guides.

    Jan 1, 2005

  • CIM
    Morphology of Environmentally Assisted Cracks in Pipeline Steel

    The morphology of environmentally assisted cracks in stressed pipeline steel has been investigated, For a dilute and neutral solution (NS4) simulating ground water in contact with the steel, semi-elli

    Jan 1, 2005

  • AUSIMM
    Mining Open Stopes at Cannington Mine Using a Vertical Retreat Open Stoping (VROS) Method

    Vertical retreat open stoping (VROS) is a variation of sublevel open stoping (SLOS) that has been introduced at Cannington to minimise the influence of subvertical geological structures during stope e

    Jan 1, 2005

  • CIM
    Chemical modelling in hydrometallurgy using OLI

    By J. F. Adams, V. G. Papangelakis

    Chemical modelling is becoming increasingly useful in the development, analysis, design, and control of hydrometallurgical processes. The paper presents the development of reliable databases for chemi

    Jan 1, 2005

  • SME
    Numerical Simulation Of Cutter Roof Failure Under Weak Roof Conditions

    By Murali M. Gadde, Syd S. Peng, C. T. Holland

    Cutter roof failure is one of the most common ground control problems affecting the safety and economy of an underground coal mine operation. Several attempts were made in the past to understand the p

    Jan 1, 2005

  • CIM
    A Personal View of the Nickel Industry in Australia - Where Have We Been and Where are we Going?

    By J. H. Canterford

    The nickel industry in Australia has followed the general pattern apparent in many other regions - lots of ups and downs, successes and failures, but always plenty of challenges. Some of these can be

    Jan 1, 2005

  • AUSIMM
    Control System Improvement Through Alarm Reduction

    By R West

    The Olympic Dam smelter facility processes copper concentrate feed using direct-to-blister smelting technology to support the current site production rate of 225 000 t/a copper. The metallurgical cont

    Jan 1, 2005

  • CIM
    Current distribution in modem copper refining

    By D. Stone, N. J. Aslin, W. Webb

    In today's modem copper electro-refineries, increasingly higher average current densities are being employed. With these increases many refineries are approaching their limiting current density.

    Jan 1, 2005

  • CIM
    Petrosleeve Repair Technology

    By R. J. Smyth

    A Steel Compression Reinforcement Repair Technique (PetroSleevel) system has been developed that has the ability to repair pipeline defects such as stress corrosion cracking (SCC) without requiring we

    Jan 1, 2005

  • AUSIMM
    Influence of Section Intake Dust Levels as an Exposure Assessment Parameter in Dust Exposure Level Index (DELI) Model

    By H R. Phillips

    Fresh air intake in an underground coal mine is of critical importance to the occupational health and safety of workers due to the dynamic, confined and dangerous nature of the mining environment. In

    Jan 1, 2005

  • CIM
    Using Simul8 to model underground hard rock mining operations

    By N. Vayenas, G. Yuriy

    "The combination of a predictive reliability assessment model and discrete-event simulation can be an effective methodology to study the impact of equipment failures on the capacity of production syst

    Jan 1, 2005