Search Documents

Sort by

  • ISEE
    Detonator Safety Relation to Measurement Errors

    By James G. Stuart, Tassilo N. Baur

    We will discuss the kind of procedure that we use to predict the no-fire (for safety) and all-fire (for reliability) current levels for any given type electric detonator. The basic idea is to expose s

    Jan 1, 2019

  • CIM
    TPH/Cubic Metre - An Alternative View on High Density Thickener Design & Geometry

    By David Minson

    On many occasions, operators have seen that high density and paste thickener performance does not meet the initial design expectations, and the installed equipment produces lower than expected thicken

    Jan 1, 2019

  • CIM
    A Simplified Approach for Evaluating Concrete Deterioration in Vertical Shaft Lining

    By G. Q. Zhou, H. C. Liang, X. D. Zhao

    "This study describes the strain behavior in vertical shaft lining (VSL) embedded in thick soil deposits and its application in assessment of concrete deterioration. The observed strain in VSL continu

    Jan 1, 2019

  • CIM
    Copper Electrowinning: 2018 Global Survey of Tankhouse Operating Practice and Performance

    By K. C. Sole, G. Robinson, M. S. Moats, W. G. Davenport, S. Sandoval

    Global practice in hydrometallurgical production of copper cathode by electrowinning is reviewed, based on individual plant operating data for 2018. Data from 29 plants were collected, representing 38

    Jan 1, 2019

  • SME
    Foundations for a Mine Fire Classification System

    By E. Watkins, M. B. Daza

    Although there have been great advances regarding the understanding of mine fires in underground mines in the last century, fires remain high risk incidents. During fire scenarios, many crucial decisi

    Jan 1, 2019

  • SME
    Real-World Improvement through Virtual Instrumentation at Oceanagold Haile (b3d97d8e-a1b0-4f54-9b98-1f700f983ef8)

    By C. Anderson, B. Schug, C. Cristoffanini, S. Nazari

    The Haile Gold Mine in South Carolina is increasing the automation level of their processing plant in order to improve operational stability. One step towards this goal is the application of a Digital

    Jan 1, 2019

  • SME
    Investigating Seismicity Surrounding an Excavation Boundary in a Highly Stressed Dipping Underground Limestone Mine

    By D. Collins, J. Winfield, V. Gangrade, B. Slaker, S. Braganza

    "Researchers at the National Institute for Occupational Safety and Health (NIOSH) are investigating the unique pillar stability issues associated with room-and-pillar mining in dipping underground sto

    Jan 1, 2019

  • CIM
    An Investigation of In-Situ Ground Conditions through the Application of Advanced Shaft Wall Monitoring Tools

    By D. Sancho, M. Weber

    "At the start of a new shaft project, a specific number of ground investigations are performed. However, it is not uncommon that the ground conditions during shaft sinking may differ from the designed

    Jan 1, 2019

  • CIM
    Sinking Methods and Present Situation of Vertical Shafts in China

    By Zhiyang Long, Ruiling Xiao

    "A mine shaft is one main development method of establishing access in an underground mine. The construction technology of the mine shaft sinking is complicated and large equipment setup on surface an

    Jan 1, 2019

  • CIM
    Maximizing Performance of FRP Equipment in Copper Extraction

    By Jeffrey D. Eisenman

    FRP is a proven material for the solvent extraction processes of copper production. There is a history of successful applications of FRP piping and equipment in hydrometallurgical processing. The perf

    Jan 1, 2019

  • SME
    New Approaches and Technology for Tailings Pipeline Design and Operation (d21c4ddb-5631-4ebe-bb61-60aa538ebe0a)

    By J. Stowe

    While there has been continual improvement in the models for predicating deposition velocity and pipeline friction losses, the fundamental design philosophy for tailings pipelines has remained the sam

    Jan 1, 2019

  • CIM
    A Lining Design Method Consistent With NATM for Deep Shafts

    By Xiao min Zhou, Yan Xu, Hongzhen Liang, Xiaonan He

    "With the increase of shaft excavation depth, the thickness of the shaft lining increases sharply. It is difficult to reduce thickness of lining effectively by improving high-strength concrete perform

    Jan 1, 2019

  • CIM
    ISO TC 82 – Mining and the Importance of International Standards

    By W. Kempson

    "Mining Companies have producing assets in increasingly diverse portions of the world. It is not uncommon that the owner, the design team, the mine contractors and the operators are all based in diffe

    Jan 1, 2019

  • CIM
    Monitoring of Stability of Closed Shafts

    By T. Schepp, T. Friedrich

    "The natural stage of deep mines operation is a closure of unnecessary shafts. It is extremely important to ensure a proper shaft closure to avoid stability loss and the associated damage to surface f

    Jan 1, 2019

  • ISEE
    Methane-air Mixture Air-blast Approximated Using Detonating Cord in Rock Dust Dispersibility Studies

    By BruneJurgen F., Richard C. Gilmore, Matthew Schreiner, Ray Johnson

    Explosive pockets of methane-air mixtures accumulate in underground coal mines and, when ignited, produce an air-blast wave that can disturb combustible coal dust on the floor, roof, and ribs. To prev

    Jan 1, 2019

  • CIM
    Implementation of Rapid Elemental Analysis for Flotation Control at Eagle Mine

    By H. Staton, V. Suontaka, E. Sharifi

    "Flotation circuits are typically controlled using on-line elemental assays obtained from the slurry lines. In base metal applications, X-ray fluorescence (XRF) analyzers are the most common instrumen

    Jan 1, 2019

  • CIM
    An Innovative Approach to Shaft Sinking Stage (Galloway) Design

    By J. Holder

    "A key barrier to vertical mineshaft construction is the construction access required for workers. A suspended work stage is used to provide this access for the mechanical, electrical and structural a

    Jan 1, 2019

  • SME
    When Traditional Ground Support Techniques Aren’t Enough—Chemical Injections Can Solve Complex Problems

    By Stephen C. Tadolini, Colton Cook, Cody Hildreth, Frederick Cybulski

    "Broken and jointed ground is extremely hazardous and requires unique stabilization techniques to protect worker and critical entries. Bolting techniques, even the most advanced with pre-load to creat

    Jan 1, 2019

  • CIM
    Design and Application of New Series of Large Shaft Sinking Headframe

    By Z. Q. Liu, J. M. Du

    "On the basis of analyzing current design and applications, the structure form, working loads and design principles of shaft sinking headframe are summarized in this paper. To overcome the insufficien

    Jan 1, 2019

  • CIM
    Novel Technology Provides for on-Line Measurement of Particle Size in Individual Cyclones

    By J. Poplawski

    In mineral processing plants, cyclones typically perform the classification duty prior to the downstream recovery process. Particle size distribution of the cyclone overflow is an important parameter

    Jan 1, 2019