    Optimization Initiatives at Altonorte on the Path to Becoming a World Class Smelter

    By Beatrice Pierre, Juan Carrasco

    Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001

    Jan 1, 2019

  • CIM
    Maximising Hoisting Capacity Whilst Minimising Capital Investment

    By A. A. Wessels, D. P. Allison

    "Mine hoists are built to handle a certain nameplate capacity; they are specified and designed according to the required duty. However, as production capacity increases in other parts of an operation,

    Jan 1, 2019

  • CIM
    Innovative Technologies for Copper Smelting and Electric Slag Cleaning and Matte Settling Furnaces

    By A. Esterhuizen, S. Essack, H. Joubert, N. Fowler

    Tenova Pyromet has developed innovative technologies for copper smelting and electric slag cleaning furnaces. Based on client feedback and requirements, innovative designs have been developed to addre

    Jan 1, 2019

  • CIM
    Analysis on Sag Mill Liner Failure

    By E. Vesely, A. Saxena

    "SAG mill liners are designed for protecting the mill shell and providing lifting power for ore charge and grinding media. Due to the impacts from the charge and the grinding media, the liner experien

    Jan 1, 2019

  • SME
    Opportunities and Challenges for Autonomous Shuttle Car Operation in Underground Coal Mines

    By J. Sottile, V. Androulakis

    Operators of underground coal mine shuttle cars are exposed to numerous hazards including noise, dust and musculoskeletal trauma. The repetitive nature of shuttle car operation leads to fatigue-relate

    Jan 1, 2019

  • CIM
    Tire-Rim Interactions and Predictions at High G Loading

    By T. G. Joseph, M. Bolster, M. Curley

    "High tirerim loading on haul trucks operating on rough ground frequently manifests as mechanical separations and rim base cracking caused by cyclic fatigue. This paper provides an understanding of th

    Jan 1, 2019

  • CIM
    Case Study - Ventilation Duct Criteria Pros and Cons How to Effectively Lower Operating Costs during the Tender Process

    By J. Holtzhausen

    "An analysis of operating costs for underground mining operations in the current global economic climate considers the financial burden for a ventilation system to be in vicinity of 30–50%. These oper

    Jan 1, 2019

  • SME
    Secondary Support Instrumentation in Longwall Ventilation Entries

    By Erik Westman, Benjamin Mirabile

    "Ongoing research is being conducted to evaluate secondary support performance in longwall ventilation entries. In a three-entry longwall gateroad, secondary supports are applied in the #2 entry to ma

    Jan 1, 2019

  • CIM
    Accurate Live Measurments for Shaft Aligment during Sinking or Shaft Remediation

    By G. Bonin, A. Jamal, G. Preciado, S. Gillis

    "Accurate, easy to obtain, and reliable methods of measurement are the cornerstone of shaft and tunnel developments - during their sinking, operation and maintenance, or in some cases, remediation. Th

    Jan 1, 2019

  • SME
    An Improved Load Measuring Device for Underground Mining Standing Supports

    By Erik Westman, Brandon Stables, Benjamin Mirabile

    "Standing support is often used in conjunction with underground retreat mining. Knowledge of the load-displacement behavior of standing support and loading induced by the mine opening is critical to p

    Jan 1, 2019

  • SME
    Improved Drilling Accuracy Results In Reduced Ore Dilution at Evolution, Cracow (a2d917f6-13bc-4cac-8758-bced53c996a6)

    During a period of six months in FY2018, a series of trials were conducted to compare drilling accuracy using two different methodologies and the subsequent impact this had on ore dilution. Testing wa

    Jan 1, 2019

  • CIM
    Stainless Steel “Permanent” Cathode Plates - Fixed Assets or Consumables?

    By G. J. Heferen, A. Pranowo, N. J. Aslin, P. O. Eriksson

    Glencore Technology (GT) has over four decades experience supplying stainless steel cathode plates (“cathode plates”) to the electro-refining and electro-winning industry. Cathode plates are typically

    Jan 1, 2019

  • CIM
    The Utilization of Copper Continuous Smelting, Converting and Fire-Refining Processes in China

    By Ling Wu

    The development of pyrometallurgical technologies has been focused on new smelting reactors, but the proposal for new converting reactors has been substantially lower. Up to today about 80% of copper

    Jan 1, 2019

  • CIM
    Deep Shaft Sinking Mechanisation Developments

    By F. A. Auld

    "Traditionally deep shaft sinking from the ground surface was carried out using drill and blast methods. Although large diameter blind shaft drilling has been carried out successfully on numerous occa

    Jan 1, 2019

  • CIM
    Disturbances of Air Parameters Caused by the Operation of the Shearer in the Longwall

    By W. Dziurzynski, St. Wasilewski, T. Palka, A. Krach

    "Air parameter monitoring systems, regardless of gasometrical protections, provide a significant number of measurement data. The obtained data broadens the knowledge on processes taking place in under

    Jan 1, 2019

  • CIM
    Evaluation of Level Control System of Cleaner Flotation Columns at Miduk Copper Concentrator

    By M. Massinaei, S. Abasi, M. Oliazadeh

    Reliable measurement and control of the pulp-froth interface (froth depth) in the flotation columns is critical to achieve the desired metallurgical performance. Shallow froths result in a reduction o

    Jan 1, 2019

  • CIM
    Comparison of Mine Ventilation Software Tools for Underground Coal Mines in Harsh Conditions

    By T. Imgrund, A. Bischoff, S. Spürk

    "Specific conditions of underground coal mines at great depth, such as high temperatures, high rates of methane inflow and natural ventilation pressure provide considerable challenges for the reliable

    Jan 1, 2019

  • SME
    Eminent Domain Mineral Property Valuations: When Self-Proclaimed “Latitude” Falls Somewhere South of Competence and Ethical Obligations

    By J. M. Beck

    Mineral property appraisers engaged in eminent domain actions on properties for which mining is the highest and best use must be fully competent in all phases of mineral resource estimation, mine proj

    Jan 1, 2019

  • CIM
    Asarco LLC Hayden Converter Retrofit Project – An Update

    By K. Parameswaran, A. Veek, A. Fernandez, P. Safe

    ASARCO LLC (Asarco) Hayden Copper smelter, in Hayden, Arizona, has operated continuously (except for minor labor and economic curtailments) since 1912. The current plant configuration comprises INCO f

    Jan 1, 2019

  • SME
    Characteristics of Drawing Body Shape in LTCC: Theoretical Model and Experimental Validation

    By Weijie Wei, Jinwang Zhang, Jiachen Wang, Yang Li

    "Longwall top-coal caving (LTCC) mining technique is one of the important methods for underground thick seam extraction in China. The coal seam in LTCC panel is divided into two parts: bottom-coal and

    Jan 1, 2019