    Numerical Investigation of Factors Involved in a Floor Heave Mechanism in a Bump-Prone Coal Mine

    By Bo-Hyun Kim, Mark K. Larson

    "Bumps remain a critical safety concern in underground coal mining, despite significant advancements in engineering controls. These events occur when relatively high stresses in a coal pillar in conju

    Jan 1, 2019

  • CIM
    Copper Production Increase at the Horne Smelter

    By Yves Prévost, Guy St-Amant, Guillaume Dion

    In 2010, the foreseen increase of copper grade in feed concentrate at the Horne Smelter was a significant challenge to maintain a steady copper flow throughout the process. The Horne Smelter process i

    Jan 1, 2019

  • SME
    The Risks in Fundamentals of Recoverable Resource Models

    By M. E. Rossi, J. A. Bassan, J. B. Novillo

    Sampling and geological models are the basis of recoverable resources models. They are pillars of mineral resources and reserves estimation, and what geostatistical methods for grade estimation should

    Jan 1, 2019

  • CIM
    The Design of High Pressure Piping in Vertical Shafts

    By W. Kempson

    "As has been noted on numerous occasions, the vertical shafts being sunk around the world are all tending to get deeper as we seek to take advantage of higher grades of minerals which can sometimes be

    Jan 1, 2019

  • CIM
    Improvements to Production Planning in Oil Sands Mining Through Analysis and Simulation of Truck Cycle Times

    By E. Goris Cervantes

    "A theoretical framework based on a detailed analysis of mine operations data from an oil sands mine in northern Alberta and the static simulation of truck cycle times are developed, verified, and val

    Jan 1, 2019

  • CIM
    Improving the Performance of the Hardy Cross Algorithm for Large Ventilation Models

    "The Hardy Cross algorithm offers a reliable method of solving network systems of fluid flow and has become widely used for solving water and ventilation flow networks. A limitation is that computatio

    Jan 1, 2019

  • CIM
    The Assessment of Aging Shaft Linings for Potash and Salt Mines

    By S. Hopkins, J. Nolan, S. Gillis

    "Cast in place concrete shaft linings have been used in many salt and potash shafts sunk in North America over the last 100 years. A large number of these shafts have exceeded their initial design liv

    Jan 1, 2019

  • CIM
    Digital Twin in Mineral Processing

    By C. Cristonffanini, S. Nazari

    "In the past, simulation was considered to be an offline tool disconnected from plant operation. Advancements in the computation power combined with utilizing physics and chemistry sciences have allow

    Jan 1, 2019

  • CIM
    Performance Assessment of a Fiber Optic Methane Sensor Exposed to Coal Smoke

    By M. Li, T. H. Dubaniewicz, H. N. Dougherty

    "INTRODUCTION Underground mines have the risk of accumulation of gases if not ventilated properly or during and after emergency situations when ventilation controls become damaged or stop working. Com

    Jan 1, 2019

  • SME
    Developing a Virtual Reality Environment for Mining Research

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • DFI
    Terminology and Evaluation Criteria of Crosshole Sonic Logging (CSL) as applied to Deep Foundations

    By Greg Canivan, Bernie Hertlein, Les Chernauskas, Joram Amir, Garland Likins, E. Anna Sellountou, Tim Kovacs, Peter Kandaris

    Nondestructive testing of drilled shaft foundations via Crosshole Sonic Logging (CSL) is often performed as part of the quality assurance process to assess the soundness of concrete. The intent of CSL

    Jan 1, 2019

  • DFI
    Adaptive Design and Contractual Approaches to Address Geotechnical Uncertainties in a Design-Build Ground Improvement Project

    By Kalyani Devabhaktuni, Mike Minton, Mark T. Howe, Yan Zhang

    During the procurement phase of a Design-Build (DB) project, design-build contractors must often commit to a fixed price based on limited or incomplete geotechnical information. This lack of informati

    Jan 1, 2019

  • DFI
    Case Study: Stability Analysis for an Existing Bridge Experiencing Riverbank Erosion

    By Brandon Smith, William Bohlen

    Riverbank erosion along the Brazos River has modified the structural support conditions for an existing bridge structure in Southeast Texas. The 8-span, 1,200-foot long bridge was completed in 1992 al

    Jan 1, 2019

  • DFI
    Cased CFA Pile – An Alternative Piling Method – A Chance for Technical and Economical Solutions

    By John R. Grillo, Gordian Ulrich, Franz-Werner Gerressen

    Most geotechnical construction professionals are aware of piling using hydraulic drill rigs and the so-called Kelly drill mode. Kelly drilling has many advantages as it can work with a wide range of t

    Jan 1, 2019

  • CIM
    Economic Evaluation of Activated Carbon for Gold Milling Circuits ( CIM Journal | Vol. 10, No. 2, 2019)

    By M. Drozd, M. Somppi, Z. F. Yamak

    "Activated carbon is used to recover gold in solution from various gold circuit designs including carbon-in-pulp (CIP), carbon-in-column (CIC), and carbon-in-leach (CIL) processes; however, the charac

    Jan 1, 2019

  • SME
    An Improved Load Measuring Device for Underground Mining Standing Supports

    By B. Mirabile, B. Stables

    Standing support is often used in conjunction with underground retreat mining. Knowledge of the load-displacement behavior of a standing support, and loading induced by the mine opening is critical to

    Jan 1, 2019

  • DFI
    Top-Down Methods Utilizing Secant Walls at 110 N. Carpenter: Design And Construction

    By David R. Sutfin, Joseph Lodde

    110 N. Carpenter is new commercial building located in the West Loop neighborhood of Chicago, Illinois. The new home to the McDonalds Corporation work headquarters, accelerated project delivery method

    Jan 1, 2019

  • SME
    Actual Challenges and Benefits of Monitored Rollers

    By J. Perlacia

    Introduction The Bulk Handling Technology has already started its transformation to the Industry 4.0. Having some of the harshest working and environmental conditions of the industry, the possibility

    Jan 1, 2019

  • DFI
    Accuracy of Low-Strain Pile Integrity Test Results

    By Mahesh Hingorani

    Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv

    Jan 1, 2019

  • DFI
    A Fully Connected Jobsite is a Must for the Future

    By Christian Hoyme, Jochen Maurer

    Most of the current foundation projects are suffering from disconnected information silos. In the first silo there is the planning of the project with corresponding data, presented by paper or digital

    Jan 1, 2019