Search Documents

  • AUSIMM
    Realising the Potential of the Boolgeeda Iron Formation – Stratigraphy and Iron Mineralisation at McCamey’s North, Hamersley Province, Western Australia

    By P J. Howard

    Atlas Iron Limited’s McCamey’s North project lies at the eastern end of the Hamersley Basin, approximately 50 km east of Newman, Western Australia, and 3 km northeast of BHP Billiton’s Jimblebar Mine.

    Jul 11, 2011

  • AUSIMM
    Real-Time Image Analysis of Iron Ore Cores and Drill Chips to Complement Spectral Measures

    By T Belligoi

    Diamond cores and drill chips provide the only direct physical evidence for ore containing rocks. Early characterisation of cores and drill chips is important as it provides critical information for d

    Jul 11, 2011

  • AUSIMM
    Removal of Phosphorous from Australian Iron Ores

    By C I. Edwards

    Phosphorous is typically present in iron ore either in the mineral apatite, Ca5(PO4)3OH, or associated with the goethitic fraction of the ore. In this paper, we present results that show that phosphor

    Jul 11, 2011

  • AUSIMM
    The Integrative Technology of Slon Magnetic Separator and Centrifugal Separator for Processing Oxidised Iron Ores

    By X Dahe

    SLon vertical ring and pulsating high gradient magnetic separators possess excellent mineral processing ability and have been widely applied to process oxidised iron ores. SLon centrifugal separators

    Jul 11, 2011

  • AUSIMM
    The Tonkolili Iron Ore Deposits, Sierra Leone

    By M S. Reston

    The Tonkolili banded iron formations (BIF), Sierra Leone, host extensive iron ore deposits which are of economic signifi cance to the seaborne iron ore trade. The deposits are dominated by a strategic

    Jul 11, 2011

  • AUSIMM
    The SNIM Guelb II Project in Mauritania – Process Design Challenges

    By G Cooper

    The Société Nationale Industriel et Minière (SNIM) is expanding its ore and concentrate production capacity in Mauritania, West Africa. This government-controlled mining company has bee

    Jul 11, 2011

  • AUSIMM
    The Use of Integrated Web-Based Solutions in Productivity Improvement

    By P Cooper

    Continuous improvement using six sigma methodologies commonly follows the DMAIC methodology of define, measure, analyse, improve and control. A key requirement in the use of this approach is to ensure

    Jul 11, 2011

  • AUSIMM
    Process Control Integration into a Brownfields Iron Ore Plant as Applied to the Khumani Iron Ore Mine

    By D Matthews

    With a brownfield project comes control integration challenges. The Khumani Iron Ore Mine’s second phase expansion posed a number of challenges as there was substantial brownfields work conducted. The

    Jul 11, 2011

  • AUSIMM
    Occurrence and Mineralogical Association of Phosphorus in Australian Bedded Iron Ore Deposits

    By M A. Wells

    The various mechanisms by which phosphorus (P) occurs and is distributed within banded iron formations (BIF)-derived iron ore are examined. In unenriched, precursor BIF P occurs predominantly as discr

    Jul 11, 2011

  • CIM
    Optimization of the Grinding Circuit of the Tata Steel Ijmuiden Pelletizing Plant

    By Willemijn Husslage

    Tata Steel Group At a glance ? Part of the Tata Group ?Tata Steel Group: ?Fortune 500 company ?Top 10 global steel producer ?Annual crude steel capacity of 28 million tonnes ?More than 80,000

    May 1, 2011

  • CIM
    Mine Water Management Challenges, Technologies, Solutions

    By Graham Sim

    Agenda ?The Water Challenge ?Examples from Three Case Studies ?Mine Drainage, 99% recovery ?Mine Drainage, 80% recovery ?Road Dust Control ?Technology Development ? Conclusion Global water ch

    May 1, 2011

  • CIM
    Overburden Mining Improvements at Suncor Energy?s Millennium Mine

    By Timothy D. Dreger

    In the spring of 2009, Suncor Energy Inc. technical personnel saw an opportunity to improve planning 0and mining of overburden material in order to address aggressive construction goals and increased

    May 1, 2011

  • CIM
    Embedding Sustainability into Environmental and Social Impact Assessments

    By Louise Pearce

    ?Environmental and social impact assessments (ESIAs) are: ??process-driven and scientific processes ??The process entails a number of steps and procedures which result in obtaining a licenceto ope

    May 1, 2011

  • CIM
    Drum Hoists ? Case Study

    By Gordon F. Scott

    This paper considers a recently completed hoist project for IAMGOLD. Called the Westwood project, this mine utilises some of the largest drum hoists supplied to the North American Market in recent tim

    May 1, 2011

  • CIM
    Social Performance - The hard science behind the ?soft? stuff

    By Jo Render

    Expectations of your management approach ??Life of mine applicability ??Tailor scale of activity to scale of project ??Assess impacts, risks, and opportunities ??Use global good practice, backed

    May 1, 2011

  • CIM
    Atmospheric Fines Drying (AFD)

    By Nav Dhadli

    Tailings from Oil Sands MiningWhat are they? Challenges Solutions Regulatory Environment Definition of the AFD Tailings Treatment Process 2010 AFD Pilot/Demonstration ProgramTechnical challenges

    May 1, 2011

  • CIM
    Luis Felipe Medina Aguirre

    This document presents estimates of future "total cash cost per ounce" and "minesite cost per tonne" that are not recognized measures under United States generally accepted accounting principles ("US

    May 1, 2011

  • CIM
    Stope Stability Monitoring at the Goldex Mine

    By Patrick Frenette

    The Goldex Mine is an underground gold mine using a unique mining method where a single very large stope is being created. In order to maintain stability of the walls and roof of the stope which is 45

    May 1, 2011

  • CIM
    Financing From the Perspective of Mining Companies

    By Eric Low

    Raising capital by issuing debt or equity is necessary in almost every corporation. In the field of corporate finance, the raising of capital is a heavily-studied topic. However, some of what is studi

    May 1, 2011

  • CIM
    Improving Raisebore Stability Assessments and Risk

    By B. M. Coombes

    The McCracken and Stacey (1989) method of assessing geotechnical risk for largediameter raisebored shafts has been the basis for most Australian pre-construction raisebore investigations for the past

    May 1, 2011