Search Documents

  • CIM
    Process for Integrating Surface Drainage Constraints on Mine Planning

    By Les F. Sawatsky

    Surface drainage, particularly mine closure drainage, must be properly considered during all stages of mine planning because it presents constraints that are critical to economic mine operation, minim

    May 1, 2009

  • CIM
    Numerical Modeling Simulations of Spray-On Liners Support Potential in Highly Stressed and Rockburst Prone Rock Conditions

    By A. P. E. Dirige

    Extensive field study has been performed to assess the capabilities of thin sprayon liners (TSLs) and conventional spray-on support systems for preventing rock and support material damage that often r

    May 1, 2009

  • CIM
    A New Design Approach of Roadside Cut Rock Slope Based on Ecological Environment Protection

    By Lian-Jin Tao

    With fast development of China modernization, road construction obtains great achievement. However, in the construction process of highway, especially the high-grade highway in mountainous area, there

    May 1, 2009

  • CIM
    Multiparameter Petrophysical Characterization of an Orebody: An Exploration Case History

    By E. Bongajum

    We present results from petrophysical studies to characterize a Zn-Pb-Ag deposit in Nash Creek, New Brunswick. The measurements are part of an integrated study that includes geological and geophysical

    May 1, 2009

  • CIM
    Instrumentation of a Graphite Zone in the #3 Shaft at Brunswick Mine

    The #3 Shaft at Brunswick Mine, Bathurst, New Brunswick, Canada, intersects a soft graphite zone just below the 3400 Level. Ground movement within this zone causes the concrete liner of the shaft to b

    May 1, 2009

  • CIM
    Rapid Mine Drifting & Tunneling, A Review of the Current Situation at some Selected Mines and Civil Projects from around the World

    By Gunnar Nord

    Introduction ??Atlas Copco has customers both amongst Miners and Contractors ??We believe that the contractor's approach to tunnelling is worthstudying ??For a tunnel contractor the incenti

    May 1, 2009

  • CIM
    Mining In Space; Technology Transfer: Examples and Applications

    Electric Vehicle Controllers Ltd. ?EVC started in 1981 ?Underground electric locomotive drive systems ?Developed tandem load sharing system and radio ELOS controls ?Locomotive autonomy systems

    May 1, 2009

  • CIM
    Preliminary Environmental Modelling of Effluent Nitrogen Species Concentrations for Feasibility Level Open Pit Mine Projects

    By Catherine T. Ziten

    Introduction ?Environmental assessments required for permitting ?Focus on ammonia produced through mine construction & blasting ?Water quality guidelines: federal, provincial, IGO ?Reported values

    May 1, 2009

  • CIM
    Understanding the Relationship: Bitumen Production and the Athabasca River

    Overview ?Oil Sands Background ?Water Use in Surface Mining ?Tailings Disposal ?Water Balance for Surface Mining ?Implications of Emerging Regulations ?Water Management Framework ?Tailings P

    May 1, 2009

  • CIM
    MAC and the AFN: Taking Up the Corporate Challenge

    Taking Up the AFN Corporate Challenge ?? About MAC ?? ?Towards Sustainable Mining? ??Mining and Aboriginal Peoples Framework ?? AFN-MAC Relationship ?? A New MAC Northern Initiative ??Social and

    May 1, 2009

  • CIM
    Compilation of Industry Practices for Control of Hazards Associated with Backfill in Underground Mines - Part II Underground Transport and Stope Placement

    By Jamie Archibald

    The Department of Mining Engineering at Queen?s University conducted a study of backfill practices in underground mines across Canada to assess the current state of backfill usage and to overview pote

    May 1, 2009

  • CIM
    Bonded-particle simulation of Tunnel Sealing Experiment

    By T. S. Wanne

    Tunnel sealing experiment (TSX) was conducted between 1997 and 2004 in the Canadian URL located in Manitoba. In the experiment, a tunnel was excavated parallel to the maximum principal stress directio

    May 1, 2009

  • CIM
    CIM Conference and Exhibition - Toronto 2009 Nickel and Climate Change

    By Sophia Wong

    Nickel is used in a wide variety of applications from consumer goods to industrial uses. In many of these uses, nickel contributes to the environmental attributes of the product. The challenge, howeve

    May 1, 2009

  • CIM
    DEM Study of the Mechanical Behavior of a Leached Interface Upon Shearing

    By C. Lambert

    It has been shown that contacts between host rock and engineered barriers may be critical in the design of deep radioactive waste repositories. Water is expected to reach the interface zone after the

    May 1, 2009

  • CIM
    Influence of Finger Configuration on Degradation of Ore Pass Walls

    By K. Esmaieli

    This paper addresses issues associated with ore pass degradation caused by material impact. A series of numerical experiments, using the particle flow code, were undertaken to investigate the influenc

    May 1, 2009

  • CIM
    Application of 3D X-ray CT Scanning Techniques to Evaluate Fracture Damage Zone in Anisotropic Granitic Rock

    By M. H. B. Nasseri

    Barre granite?s samples have been tested for fracture toughness under mode I along two different directions with respect to microstructural fabrics were investigated. 3D objects counter algorithm tech

    May 1, 2009

  • CIM
    CIM: Using International Construction Project Management Techniques in the Mining Industry

    By Willie van Niekerk

    As mining projects get larger and more complex there is a need to examine the use of project management techniques developed for large construction projects in order to ensure completion of the projec

    May 1, 2009

  • CIM
    Re-entry Protocols for Seismically Active Mines: An Update

    By J. A. Vallejos

    Re-entry protocols are a tactical approach for controlling risk after blasts or large events in seismically active mines. Based on the results of a survey on 18 seismically active mines, mostly in Ont

    May 1, 2009

  • CIM
    Characteristics of Wenchuan Earthquake and its Geological Hazard Effects

    By Yun-Jie Wei

    Seismic areas were in the eastern margin of the Qinghai-Tibet plain, whose structures were complicated, mainly composed of Maowen fault, Yingxiu fault and Pengxian-guanxian fault. The rapid rise of th

    May 1, 2009

  • CIM
    In Situ Fracturing Mechanics Stress Measurements to Improve Underground Quarry Stability Analyses

    By Anna M. Ferrero

    Stability condition of underground excavations have to be assessed to guarantee safe operations within the quarrying working areas. This objective requires a reliable assessment of the rock mass natur

    May 1, 2009