Search Documents

  • CIM
    Variable Frequency Drives as Applied to Ventilation Systems

    By Cheryl L. Allen

    The power required to operate a ventilation system can be 25% to 50% of the total energy requirements of a mine. In an effort to reduce energy consumption, initiatives are being introduced at Vale Inc

    May 1, 2009

  • CIM
    NASA Lunar Mining and Construction Activities and Plans

    By Gerald Sanders

    Presentation Topics ? We?re Going to the Moon Again? ? What is Lunar Mining ? In-Situ Resource Utilization? ? What Are The Challenges to Lunar Mining? ? What is NASA Currently Doing?

    May 1, 2009

  • CIM
    Burr Project Potash Mine Development

    Burr Mineral Resource has: ?Grade / Thickness / Tonnage ?Dry Caprock ?Low Carnallite ?Low Clay / Insolubles ?Flat & Continuous Deposit ?Proper depth

    May 1, 2009

  • CIM
    Use of a Stereo-Topometric Measurement System for the Characterization Of Rock Joint Roughness In-Situ and in the Laboratory

    By B. S. A. Tatone

    The surface roughness of unfilled rock discontinuities has a major influence on the deformational and hydraulic behaviour of discontinuous rock masses. Although it is widely recognized that surface ro

    May 1, 2009

  • CIM
    Earth Moving Equipment Safety Round Table - The EMESRT Story (2006-2008)

    Mining companies around the globe have long struggled with the need to ensure that earth moving equipment is designed to be operated and maintained under all site conditions without causing harm to pe

    May 1, 2009

  • CIM
    Get More Reliable Production from Existing Mobile and Fixed Assets ?Technology Advancements to Optimize Asset Performance

    By Keith Donovan

    Why are we here? Improve equipment performance & health ? Eliminate undesirable downtime and expensive secondary damage ? Maximize equipment life, optimize running costs (reduce costs) ? Improve s

    May 1, 2009

  • CIM
    An Improved Definition of Rock Quality Designation, RQDc

    By L. Li

    The rock quality designation (RQD) was initially introduced by Deere (1963) for civil engineering. But, its application has been largely extended to rock mechanics and has become a fundamental paramet

    May 1, 2009

  • CIM
    Measurement of Surface Roughness of Rock Discontinuities

    By G. V. Poropat

    Roughness of a discontinuity may be an important factor influencing shear strength of the discontinuity. Traditionally, determining the roughness of a discontinuity surface and providing a numerical m

    May 1, 2009

  • CIM
    The use of Engineered Wetland Technology for Long Term Minewater Treatment at Closed Minestreatment Mines

    CONSTRUCTED WETLANDS (CWs) ?Human-Constructed ?Built Specifically to Remove Contaminants ?Can Treat a Wide Variety of Wastewaters Including Stormwater(SW) ?Three Major Kinds ?Pond Wetlands ?Fr

    May 1, 2009

  • CIM
    Rock Mass Classification for Pre-Excavation Support Planning and at-Face Excavation Performance Assessment

    The rock mass classification systems were developed for different functions, including support selection, excavation method selection and the determination of rock mass engineering properties for exca

    May 1, 2009

  • CIM
    Pavoncelli Tunnel Case Study

    This paper describes the back analysis of the Pavoncelli tunnel, an hydraulic tunnel which was excavated between 1904 and 1915 in South of Italy and experienced severe damages during the 1980 Irpino-L

    May 1, 2009

  • CIM
    A New Analytical Model to Simulate SAGD Process Considering Geomechanics

    By A. Azad

    SAGD (Steam Assisted Gravity Drainage) is an in-situ oil recovery technique for heavy oil reservoirs. The technique has been successfully applied to many projects in the past 25 years and the process

    May 1, 2009

  • CIM
    Rock Strength Characterization for Excavations in Brittle Failing Rock

    By B. H. Kim

    It is hypothesized that the standard approach adopted to characterize the ground and to determine the rock strength properties at depth are flawed and generally tend to underestimate the rock strength

    May 1, 2009

  • CIM
    Introduction to the SMART Benchmarking Program

    By Tom Demorest

    SMART is an association of mining companies that meet regularly to coordinate the technology development needed by the mining industry. Since 1995, the member companies and institutions have directed

    May 1, 2009

  • CIM
    Radial Flow Permeability Testing of Indiana Limestone

    By P. Mattar

    The geotechnical importance of studying fluid flow through porous media and soils in particular, becomes evident when dealing with groundwater movement in surficial geomaterials that can be initiated

    May 1, 2009

  • NIOSH
    Escape from Farmington No. 9 An Oral History - Background

    By Michael J. Brnich

    On November 20, 1968, a massive explosion rocked the underground workings of Mountaineer Coal Co.?s Farmington No. 9 Mine in West Virginia. Of the 99 miners who were working in the mine at the time of

    May 1, 2009

  • CIM
    Investigation on the Mechanism of Coal Mine Bumps and Relating Microscopic Experiments

    By Y. X. Zhao

    This paper briefly describes the characteristics and induced factors of coal mining bumps based on the investigation of recent bumps accidents occurred in China. According to the theory of non-equilib

    May 1, 2009

  • CIM
    National Strategy Overcoming HR Challenges in the Canadian Mining Industry

    Session 1 ? Intro to MiHR ? Business Case for Aboriginal Inclusion ? Overview of the Mining HR Guide for Aboriginal Communities ? Two presentations of Programs featured in the Guide ?? The RAP Pr

    May 1, 2009

  • CIM
    Selective Highwall Mining at the Dome Open Pit Mine

    By J. G. Henning

    Following completion of planned mining operations at the Goldcorp Dome Open Pit Mine, a high-grade Shaft Pillar located in the pit highwall was recovered. Mining of this Shaft pillar faced numerous ro

    May 1, 2009

  • CIM
    Global Approach to Managing Deep Mining Hazards

    A series of fault slip seismic events have occurred at Garson mine. The events have occurred during development advancement exposing faults, after the extraction of single stopes due to mining induced

    May 1, 2009