Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Chromite Ore û Characterisation Through to ProcessingBy M I. Pownceby, W J. Bruckard
A South African chromite sample was subjected to characterisation and physical beneficiation testwork in order to assess its suitability to produce an upgraded chromite product with a silica level of
Jan 1, 2008
-
Flotability Of Metallic Iron Fines From Comminution Circuits And Their Effect On Flotation Of A Sulfide OreBy H. K. Lin
The effect of metallic iron fines on froth flotation of a sulfide ore was examined by comparing the flotation results with and without iron fines present in the flotation feed. Mild steel and ceramic
Jan 1, 2008
-
San Vicente to 2nd Aqueduct Pipeline - Tunnel: Drill and Blast in Advance of an Open-Face Digger ShieldBy Brett Campbell
The San Vicente to 2nd Aqueduct Pipeline?Tunnel project is a raw water conveyance tunnel linking the San Vicente Reservoir (SVR) to the 2nd Aqueduct Pipeline via Rancho Penasquitos Pressure Control Fa
Jan 1, 2008
-
Analysis and Management of Loads on Paste Backfill BarricadesBy M Fahey, A B. Fourie
Over the past ten years, the mining industry has witnessed the introduction of a new and innovative mine filling technique known as paste fill, which consists of placing full stream tailings with smal
Jan 1, 2008
-
Improve Dust Capture on Your Surface DrillBy Steven J. Page
Researchers have developed a model to describe airborne respirable dust (ARD) generation on surface coal mine drills. By measuring a few basic parameters and using a graph, a drill operator or engine
Jan 1, 2008
-
Three-Dimensional Modelling of Construction Tolerance in Trapezoidal SegmentsBy R Bertuzzi
This paper presents a three-dimensional analysis of a trapezoidal-shaped segmental tunnel lining for a recent tunnelling project in Sydney. Two- dimensional analyses, hand calculations and equipment s
Jan 1, 2008
-
A Discrete Element Code for Diggability AnalysisBy Stephen Chung
The quality of a blast design can be evaluated in many ways. It may involve fragmentation, muck profile, environmental effects in terms of vibration and the excavation of the blasted material. To assi
Jan 1, 2008
-
Economic and Environmental Evaluation of Aerospace Aluminum End-of-Life Options Using a Chance-constrained Optimization ModelBy Guozhu Ye, Mikael Larsson, Eric Burström, Sten Ångström
"Increased use of scrap in steelmaking including scrap use in BOF has a high economic and environmental potential in terms of increased productivity, energy saving and reduced emission of CO2. Preheat
Jan 1, 2008
-
Large-Scale Stacking System At The Freeport-McMoRan Safford Mine - IntroductionBy Michael Schmalzel
Freeport-McMoRan Copper & Gold, Inc. (FMI) will soon begin copper production from the Dos Pobres and San Juan deposits near Safford, Arizona. Ore reserves total 615 M tons grading 0.36% copper, predom
Jan 1, 2008
-
Cooling Water Intake Shafts for the Oak Creek ExpansionBy Edward Jacobsen, Patrick J. Lydon
"The ongoing expansion of the Oak Creek Power Plant in Oak Creek, Wisc., includes a tunnel bored in rock that connects to four vertical intake shafts approximately 1.5 miles (2.4 km) offshore in Lake
Jan 1, 2008
-
Design and Construction of Tunnel and Shaft PlugsBy James W. Marold
Tunnel and shaft plugs have been designed to assist in construction of new and rehabilitation of existing tunnels and shafts. Tunnel plugs have been used to provide construction access for side by sid
Jan 1, 2008
-
Underground Mining: Comparison of MethodsBy Stephen A. Orr
Underground mining is a dynamic art and science with a diverse set of design, production, and economic criteria that must be considered before selecting an optimal method to extract the ore. While all
Jan 1, 2008
-
Application Heat Pumps for Waste Energy Utilization in Sulfuric Acid ProductionBy Milance Mitovski, Milorad Cirkovic, Vlastimir Trujic, Dragana Živkovic
"In this article, it is analysed the possibilitis and the effects utility waste energy of process sulfuric acid production in the existing technical-technological conditions. The utility second proces
Jan 1, 2008
-
Laboratory investigation of enclosed cab filtration system performance factorsBy J. A. Organiscak
Enclosed cabs are a primary means of reducing the silica dust exposure of equipment operators at surface mines. The National Institute for Occupational Safety and Health (NIOSH) has investigated vario
Jan 1, 2008
-
Reinforcing Coal Mine Roof with Polyurethane Injection: 4 Case StudiesBy Gregory Molinda
NIOSH has recently completed a study of the interaction between polyurethane (PUR) and coal mine roof in order to determine the mechanism of reinforcement, in both highly fractured rock and unfracture
Jan 1, 2008
-
Development of Kumera Steam Dryer and its Application in Non-Ferrous Metal SmeltersBy I. Kylmakorpi
In non-ferrous metal smelting, when the concentrate entering the furnace contains high levels of moisture, energy requirement for heating and drying increases and large volumes of exhaust are produced
Jan 1, 2008
-
CO2 Capture and Sequestration – Implications for the Metals IndustryBy Jim Sarvinis, Mark Berkley, David Clarry, Jason Berzansky
"Technologies developed to sequester CO2 or use CO2 for enhanced fossil fuel recovery are currently being utilized across the globe. Taxation regimes and CO2 credit trading are becoming drivers for a
Jan 1, 2008
-
Studies on Coal in Pressure Leaching of Marmatite ConcentratesBy Zhigeng Xu
Pressure leach of a Yunnan marmatite concentrates with adding coal as the elemental sulfur disperser was investigated. The experimental results show that the coal with carbon content higher than 70% i
Jan 1, 2008
-
Doe Run?s Sustainable Mining Operations Focused On Managing Lifecycle Of LeadBy Jerry Pyatt
Lead has been used by mankind since before the Egyptian pyramids were built. Its durability provides for a continuum of innovation. As the largest integrated lead producer in the Western Hemisphere, T
Jan 1, 2008
-
Underground Longhole Blasting near Large-diameter Booster FansBy Norm Disley, Kingsley Hortin, Gertjan Bekkers
As part of the expansion of the Kidd Creek Mine to 2,682 meters (8800 feet) below surface, two largediameter 3000kW (4000HP) booster fans were installed at the 6000 level. Shortly after commissioning
Jan 1, 2008