Search Documents

  • ISEE
    Journal: You Be the Judge - A Study on Ethics

    The following situation was submitted as an ethics case study for inclusion in the Journal. To the best of our knowledge, they are based on actual circumstances encountered in the field. Blowing the W

    Jan 1, 2007

  • AUSIMM
    Classification Improvements Using Air Core Booster (ACB) Assisted Cavex Cyclones in the Mt Charlotte Circuit at KCGM

    By K Paki, K Parker, J F. Dupont

    The Mount Charlotte grinding circuit at KCGMÆs Fimiston mill was recently equipped with three 650 mm CAVEX cyclones in order to improve the overflow P80, reduce the fines bypass to the underflow and i

    Jan 1, 2007

  • SAIMM
    Key Results Of The Initial Environmental Risk Assessment For Chromium III Compounds And Chromium Metal

    By E. Pezennec

    A voluntary comprehensive environmental Risk Assessment was launched at the end of 2004 by the International Chromium Development Association. The completion is scheduled for mid 2006.EURAS, a leading

    Jan 1, 2007

  • SAIMM
    Melting Phenomena In Ferromanganese Production

    By Dechun Lou, Benjamin Ravary, Merete Tangstad, Stein Wasbø, Sean Gaal

    The melting phenomena of manganese ore, slag and alloys were studied in an experimental sessile drop furnace. Particles of approximately 20-60mg were placed on graphite substrates and then heated at a

    Jan 1, 2007

  • CIM
    Measurement of Wide Bubble Size Distributions in Flotation Columns Operated with Jet-Type Spargers

    By W. A. Kracht

    The McGill Bubble Size Analyzer, with the original image-capturing device (digital video camera), has a proven record for measuring bubble size distributions that are relatively narrow, such as in mec

    Jan 1, 2007

  • SME
    Ergonomic Interventions At Unimin (a8427aad-fa40-4708-ba18-5e74f8b6935f)

    By A. Mayton, W. Porter, A. O’Brien

    In 2004, management at Unimin’s Gleason, TN operation began implementing ergonomic interventions specifically targeted to reduce risk of musculoskeletal injuries (MSIs). Together with corporate and s

    Jan 1, 2007

  • CIM
    Friction Stir Processing of Sand-Cast Aerospace Magnesium Alloy ZE41A-T5

    By X. Cao

    Friction stir processing (FSP) is used to produce wrought microstructures at the surface of sand-cast aerospace grade magnesium alloy ZE41A-T5. It is found that the microstructure is significantly ref

    Jan 1, 2007

  • SAIMM
    The Role Of Geotechnical Block Models In Mineral Resource Management - 1 Introduction

    By Alan Bye, Megan Little

    Geology, and the detailed understanding of its properties, are fundamental to the optimal design and successful operation of any mine. To that end extensive fieldwork has been conducted at Anglo Plati

    Jan 1, 2007

  • SME
    Semi-Autogenous Grinding (SAG) Mill Liner Design And Development

    By D. Royston

    SAG mill liner development draws primarily on practical experience from SAG milling operations supported by computer-based modeling of charge motion in SAG mills and on established good design practic

    Jan 1, 2007

  • AUSIMM
    GekkoÆs Gravity, Flotation and Intensive Leaching (GFIL) Process for Gold Recovery Improves Environmental and Cost Outcomes

    By T Hughes

    Upward pressure on all mining operations is coming from the triple bottom line. To some extent this is being offset by the rise in mineral prices, but this may or may not continue. The other serious i

    Jan 1, 2007

  • SME
    Alternative Contracting Methods

    By John Reilly

    Traditional methods of project procurement of have remained virtually unchanged in the U.S. infrastructure construction industry for more than 50 years. The traditional method, Design-Bid-Build (DBB),

    Jan 1, 2007

  • SAIMM
    Zircon Surface Characterization

    By J. G. Bruwer

    Paper written on project work carried out in partial fulfilment of B Eng Met Surface coatings persisting on zircon particles, after being leached in an acidic solution, are believed to be the cause

    Jan 1, 2007

  • CIM
    The Acid Plant Expansion and Energy Saving at Toyo Copper Smelter

    By N. Kubo

    Sumitomo Toyo Copper Smelter and Refinery was commenced in 1971, and its production capacity of sulfuric acid was 550tpd at the beginning. In 2001 Toyo Copper Smelter and Refinery projected to expand

    Jan 1, 2007

  • ISEE
    Underwater Explosions Part 5. Minimum Weight of an Explosive Charge for the Reliable Energy Measurements

    By M. Hagfors

    When establishing an underwater testing site for the energy measurements of the explosives, the dimensions of the measuring pool have to be measured to find out what is the maximum weight for the test

    Jan 1, 2007

  • AUSIMM
    The Benefits of Bulk Emulsion Explosives in Underground Development Mining

    By N Bennett

    This paper examines the practical and economic benefits of using bulk emulsion explosives in underground development mining; compared to ANFO, ANFO derivatives and packaged explosives. The key economi

    Jan 1, 2007

  • SAIMM
    Use A Cansolve SO2 Scrubbing System To Better Link Your Batch-Operated Furnace With Its By-Product Sulphuric Acid Plant

    By P. Roy

    Smelting or converting of sulphide concentrates and mattes in a batch operation presents a challenge when directing the off- gas to a conventional acid plant. The Hindustan Zinc Ltd. (a division of th

    Jan 1, 2007

  • SME
    Geologic Setting And Gold Grade Patterns Of The El Sauzal High-Sulfidation Gold-Silver Deposit, Chihuahua, Mexico

    By S. Weiss, E. Espinoza

    The El Sauzal gold-silver deposit is a high-sulfidation, epithermal precious-metals deposit hosted by an east-dipping sequence of dacitic and rhyolitic pyroclastic and debris-flow units of probable Ol

    Jan 1, 2007

  • SME
    Thermoanalytical Study On The Oxidation Of Sulfide Minerals At High Temperatures

    By S. E. Pérez-Fontes

    An experimental study on the oxidation of chalcopyrite (CuFeS2), pyrite (FeS2), covellite (CuS) and chalcocite (Cu2S) particles was conducted by means of differential scanning calorimetry (DSC) and th

    Jan 1, 2007

  • SME
    Construction of the Powerhouse Cavern for the Pumped Storage Scheme Kops II in Austria

    By Helmut Westermayr, Michael Tergl

    DESCRIPTION OF PROJECT Geographic Setting The Kops II plant is a pumped storage scheme of the hydroelectric power producer ‘Vorarlberger Illwerke AG’ which is currently under construction in t

    Jan 1, 2007

  • ISEE
    Study of Blasting Produced Air Overpressure in Urban Area

    By Zou Dingxiang

    Rock blasting in the project of “Site Formation and Associated Infrastructure Works at Choi Wan Road and Jordan Valley” is the largest urban blasting project in the history of Hong Kong and also is ra

    Jan 1, 2007