Search Documents

  • ISEE
    Computer and Centrifuge Modeling of Decoupled Explosions in Civilian Tunnels

    By Neil T. Davie, Thomas K. Blanchat, Thomas C. Togami, Joe R. Weatherby, Dale S. Preece, Robert A. Benham, James J. Calderone

    "Geotechnical structures ,such as underground bunkers, tunnels, and building foundations aresubjected to stress fields produced by..the gravity load on the structure and/or any overlyingstrata. These

    Jan 1, 1998

  • ISEE
    The Challenge of Precise Measurement of Precision

    By John Watson, Jay Rodgers

    The world of blasting and explosive use continues to evolve into one which relies heavily on measurement, quantification, process control, and information feedback as a means of contributing to operat

    Jan 1, 1998

  • CIM
    Gold Deposits: Establishing Sampling Protocols and Monitoring Quality Control

    By Dale A. Sketchley

    "Abstract - Large differences in gold content between rock fragments or small volumes of unbroken rock, commonly referred to as the nugget effect, are related to sample and subsample weights, crushing

    Jan 1, 1998

  • TMS
    Simultaneous and Selective Extraction of Zinc and Copper Ions by Two Parallel Modules of Supported Liquid Membranes

    By Jae-Chun Lee

    One of the main advantages of the supported liquid membrane(SLM) would be that different kinds of ions can be extracted selectively or simultaneously from multi-component solutions by parallel treatme

    Jan 1, 1998

  • SME
    A Yielding Support System For Controlling Rock Dynamic Loading

    By E. De Souza

    Rockbursts and rockfalls cause very large safety and productivity losses in underground mines. One of the major unsolved problems of safe, economical rock support in underground mining has been that o

    Jan 1, 1998

  • SME
    Improving Spiral Performance Using Circuit Analysis (15a4124d-6c5d-4df8-8934-ce6fc588242b)

    Spirals have become one of the most popular methods for treating fine coal. Unfortunately, spirals tend to produce an undesirably high specific gravity cut-point and often misplace significant amounts

    Jan 1, 1998

  • TMS
    Acid Based Separation Process for Remediation of Lead Contaminated Firing Range Soils

    By M. Misra

    The removal of lead and other heavy metals present in an active US Army small arms firing range soil was evaluated in a pilot scale test program at Ft. Polk, Louisiana. Two different acid based extrac

    Jan 1, 1998

  • SME
    ITEC Begins Remining At Gold Hill

    ITEC Environmental Colorado has begun reprocessing the tailings from old mining sites near Boulder, CO. And if the technology behind ITEC's pilot project at Gold Hill proves successful and profit

    Jan 1, 1998

  • SME
    AFM Force Measurement For Activated Sphalerite-Xanthate Interactions

    Direct force measurements were conducted using an atomic force microscope (AFM) to study the mechanism of copper-activation of sphalerite. The force measurements were conducted between a sphalerite pl

    Jan 1, 1998

  • AUSIMM
    Economic Optimisation of the Blasting-Crushing-Grinding Comminution Process in a Low-Grade iron Ore (Taconite) Operation

    The paper presents the results of laboratory blasting and grinding experiments on a low-grade iron ore, investigating how blasting will influence the subsequent crushing and grinding operations. Inc

    Jan 1, 1998

  • SME
    Reduction Of Roast Movat Chromite Ore With Carbon (2060f1ae-dad6-4029-850c-5f4b4224af19)

    By R. G. Reddy

    Solid state reduction of roast movat chromite ore with carbon was carried out as a function of C/FeO ratio and temperature in the range 800°C to 900°C by thermogravimetry analysis (TGA). A two stage m

    Jan 1, 1998

  • AUSIMM
    Evaluation of the Ernest Henry Cu-Au Deposit Mineral Resources

    By A J. Ryan

    The Ernest Henry copper-gold Mineral Resource is the major asset heldby Ernest Henry Mining Pty Ltd, comprising A$6.4 billion of containedmetal. The case history presented below describing the evoluti

    Jan 1, 1998

  • ISEE
    Borehole Inspection with the HRS-1 Video System

    By Tom Palangio, Ralph M. Olmstead

    Video inspection of boreholes with cameras developed specifically for the mining industry is now possible. These designs are reliable, cost effective, and have the flexibility to be used in other appl

    Jan 1, 1998

  • DFI
    Pile Installation Recorder Tests For ACIP/CFA Piles - Introduction

    By Garland Likins

    The Texas Department of Transportation, now considering using Augered Cast-In-Place (ACIP) Piles (also known as Continuous-Flight-Auger or CFA Piles) in their foundations, awarded a research project t

    Jan 1, 1998

  • CIM
    Inclusion measurement by ASTM E 1245

    By G. F. Vander Voort

    Over the past twenty years, steelmakers have introduced improved practices for reducing the inclusion content of steels. The success of these practice changes can be monitored in a variety of ways. Ch

    Jan 1, 1998

  • IMMS
    Shallow-Marine Gold Mineralization In The Lihir Island Area, Papua New Guinea

    By Peter M. Herzig

    In 1994 and 1998 the German research vessel R/V Sonne undertook detailed mapping and sampling of the largely uncharted offshore areas of the Tabar-Lihir-Tanga-Feni island chain in the New Ireland Basi

    Jan 1, 1998

  • AUSIMM
    Hydrothermal and Host Rock Controls on Environmental Geochemistry: Comparison Between Coromandel and Otago

    By D Chappell

    Coromandel Peninsula gold mineralisation has an epithermal style which involves extensive alteration of host rocks and addition of pyrite over large volumes of rock. These altered rocks therefore have

    Jan 1, 1998

  • AUSIMM
    The Potential for Backfill in Highwall Mining (7bcc6ff0-6f9e-4f39-8e8f-1dbb9d479afe)

    By Boyd GL

    Backfill applied to highwall mining is foreseen as a means to increase recovery of mineable coal to levels comparable with underground longwall mining. This paper describes the progress of research

    Jan 1, 1998

  • CIM
    The changing role of the Construction Group of the Project Development Division of Placer Dome Inc.

    By M. A. Creaney

    "The Construction Group is responsible for the construction of all of Placer Dome’s major projects and contributes to the development of most major feasibility studies. This group includes an internat

    Jan 1, 1998

  • SME
    Overview Of The Sulfate-Reducing Bacteria Demonstration Project Under The Mine Waste Technology Program (a6814f1f-31db-4be3-8bd2-782e0dfa9a56)

    By M. Canty

    Results are presented that were gathered during pilot-and field-scale testing of an innovative technology, sulfate-reducing bacteria (SRB), designed to treat and control acid mine drainage (AMD). The

    Jan 1, 1998