Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Autogenous Grinding And Concentration Of A Michigan Native Copper OreBy Constance F. Acton
Based on laboratory structure analyses, a pilot plant investigation was undertaken to evaluate a Michigan conglomerate native copper ore. Comminution or sized feed was accomplished using wet, closed c
Jan 1, 1977
-
RI 8241 Water Infusion of Coalbeds for Methane and Dust Control (ccd5ae0c-ba84-4276-9be6-6138fd502975)By Joseph Cervik
This Bureau of Mines report deals with water infusion of coalbeds, which can control methane emission at face areas during developmental mining and which may sometimes suppress dust. Studies show
Jan 1, 1977
-
Computer-Aided Regional Planning For Mineral ResourcesBy William C. Brice
Minnesota is involved in planning controversies related to taconite and potential copper-nickel mining. Mine facility planning includes the Reserve dining on-land tailings disposal issue and the poten
Jan 1, 1977
-
An Automated Extraction System For Coal MiningBy Donald L. Freed
Design, development, factory test, and in-mine evaluation plans are presented for an Automated Extraction System (AES) that has been designed to fill needs which are present in the Mining Industry. Th
Jan 1, 1977
-
Simulation Ore Reserves Control Model Based On Reliability Characteristics Of Open-Pit EquipmentBy Y. Astafyev
In applying computers at the enterprises it is necessary to develop an open-pit model which completely corresponds in its structure, properties and characteristics to real open-pit mining. This model
Jan 1, 1977
-
Geology of Brunswick No. 12 MineBy William M. Luff
This paper outlines the regional geology and history of the area, and summarizes the stratigraphy, structure and geology of the Brunswick No. 12 mine area. The Brunswick No. 12 deposit is a stratifor
Jan 1, 1977
-
Individual Mineral Behavior In A Closed Grinding CircuitBy J. A. Finch
A closed grinding circuit, typified by a ball mill-cyclone combination, is often required to treat a feed comprised of a variety of minerals of differing properties. Usually, the individual behaviour
Jan 1, 1977
-
An Energy Balance For The Second Underground Coal Gasification Experiment, Hanna, WyomingBy Dennis D. Fischer
The second underground coal gasification experiment conducted by ERDA's Laramie Energy Research Center at a site near Hanna, Wyoming, was completed on July 30, 1976. During the experiment product
Jan 1, 1977
-
Origin of the McDermitt Caldera in Nevada and Oregon and Related Mercury Deposits (708f02e1-867a-4b9b-93bb-0203d5e806ea)By Edwin H. McKee
Eruption of rhyolitic ash-flow tuffs in the area of the McDermitt (Cordero) caldera began about 17.4 million yr (m.y.) ago and continued for about 1.5 m.y. During this period of silicic eruptions, a c
Jan 1, 1977
-
U.S. Bureau Of Mines High-Speed Data Acquisition SystemBy Richard W. Markley
A centralized online data acquisition system has been developed by the U.S. Bureau of Mines Pittsburgh Mining and Safety Research Center for rapidly digitizing, storing, and processing experimental si
Jan 1, 1977
-
Cyanide Destruction at Western Mines, Myra Falls OperationsBy A. G. Eccles
"INTRODUCTIONWestern Mines' copper-lead-zinc operations are located in Strathcona Provincial Park, near the geographic centre of Vancouver Island. This park includes Buttle Lake, which flows into the
Jan 1, 1977
-
RI 8248 Dust Control on a Longwall Face With a Shearer-Mounted Dust CollectorBy Natesa I. Jayaraman
A field study was conducted by the Bureau of Mines to determine the feasibility and effectiveness of a secondary ventilation system retrofitted onto an Eickhoff EDW 340L double-drum shearer as a techn
Jan 1, 1977
-
Appendix B - Program Listing Of Head Loss Calculation Using The Thermodynayic MethodBy R. V. Ramani, R. Stefanko, G. W. Luxbacher
C THRM 1 C CALCULATION OF MINE HEAD LOSSES FROM ALTIMETER SURVEY DATA TURN 2 C PENNSYLVANIA STATE UNIVERSITY - MINERAL ENGINEERING DEPARTMENT THRM 3 C THRM 4 C THRM 5 C THIS PROGRAM CALCULATES PR
Jan 1, 1977
-
A Dynamic Programming Solution Of A Block-Caving Mine LayoutBy James M. Riddle
INTRODUCTION Block-caving mines are generally large operations. Calculating the quantity and value of mineral present and determining the economic limits to mining are complicated processes requiri
Jan 1, 1977
-
Mining Technology For Offshore Hydrocarbon DevelopmentBy William Winsor, Harold L. Snyder
"AbstractShould oil and gas be proven in commercial quantities on the Labrador Shelf, current technology is not adequate for production operations in this severe environment, which includes yearly inv
Jan 1, 1977
-
RI 8231 - Directionally Controlled Drilling To Horizontally Intercept Selected Strata, Upper Freeport Coalbed, Greene County, Pa,By David C. Oyler, Herbert H. Fields, William P. Diamond
A 3-inch pilot hole was directionally drilled to intercept the Freeport coalbed horizon horizontally at Mather, Pa., as part of a Bureau of Mines degasification project. The original concept was to co
Jan 1, 1977
-
Cyclical Trends and the Metal Market OutlookBy A. G. B. Hayes, C. L. Renzoni
"AbstractThis paper provides a rough outline of economic expectations for the near future and then goes on to discuss their effect on the expected demand for metals, using zinc, copper, nickel and alu
Jan 1, 1977
-
Ventilation At Depth At North Broken Hill LimitedAutocompression and virgin rock tempera ture have a marked influence on the ventilation of the lower levels at North Broken Hill Limited N.S.W. To maintain comfortable working temp- eratures without
Jan 1, 1977
-
RI 8246 Infrared Spectral Radiances and Explosion Properties of Inhibited Methane-Air FlamesBy A. L. Johnson
In this Bureau of Mines report, time-resolved infrared emission spectra and corresponding pressure and temperature histories are reported for large-scale propagations of CH4-air, CH4-air-N2, and CH4-a
Jan 1, 1977
-
Crushing, Grinding and ConcentratingBy David Runnels
The Mount Wright iron are mine and upgrading plant were brought on line in the fall of 1975. The mine is located near the Quebec - Labrador border some six hundred miles northeast of Montreal. This pa
Jan 1, 1977