Search Documents

  • SME
    Initial Operation Of The 30MWe Rivesville Multicell Fluidized Bed Steam Generation System

    By Robert L. Gamble

    The world's largest fluidized bed steam generator located at Rivesville, West Virginia is currently undergoing initial operation. This unit is designed to generate 3708 kg/s (300,000 Ib/hr) equiv

    Jan 1, 1977

  • AIME
    A Statistical Model For Exploration Of The Ramsbeck Pb/Zn Mine (F. R. G.)

    By Friedrich Wellmer

    INTRODUCTION The Ramsbeck Pb/Zn Mine is located in the northern Sauerland area of West Germany, 150 km N of Frankfurt and 120 km E of Cologne. This is a vein deposit which has been worked from the

    Jan 1, 1977

  • SME
    Industrial Minerals In South Carolina Past, Present And Future

    By Norman K. Olson

    A geologic investigation of mineral resources in South Carolina first began in 1825 when the General Assembly authorized Lardner Vanuxen to conduct a "Geological and Mineralogical Survey of South Caro

    Jan 1, 1977

  • NIOSH
    RI 8212 - Methane Emissions From Four Working Places In The Beckley Mine, Raleigh County, W. Va.

    By P. W. Jeran, M. C. Irani, D. H. Lawhead

    The Beckley mine is one of five new mines in a heretofore unmined portion of the Beckley coalbed. The remoteness of these new mines from prior mining and their greater overburden preclude applying met

    Jan 1, 1977

  • AIME
    Simulation Of Dragline Operations

    By P. K. Chatterjee

    The overall success of many strip coal mining operations depends primarily upon the efficient use of draglines to remove overburden. These machines require enormous capital investment and unless used

    Jan 1, 1977

  • SME
    A Study Of Coal Mine Roof Behavior During Mining

    By R. T. Langland

    The U.S. Bureau of Mines has conducted underground tests and computer analyses to study coal mine roof behavior. Southern Ohio Coal Company provided test sites it) their Heigs mines located near Athen

    Jan 1, 1977

  • AUSIMM
    Determination of the Optimal Direction of Mining Works Expansion in Open-Cut by the Volume Simulation Method

    By Bukeikhanov D. G, Syedin V. F, Sagyngaliyev K. S

    The present paper describes a method of simulating deposits of com- posite structure by means of computers. The method employs mathematical tech- niques to study the openworks zone formation dynamic

    Jan 1, 1977

  • SME
    "Low Cost" Energy Conservation Measures For Rotary Kiln Systems

    By Jr. Goller

    You and I can visit cement plants, inspect the various rotary kiln systems and find some equipment or some burning techniques that waste energy--fuel and power. After we have made such a visit and s

    Jan 1, 1977

  • AIME
    Recent Work On Preheating At The British Carbonization Research Association

    By James P. Graham

    In this paper the authors present the background information to preheating and its development and describe the facilities available at the British Carbonization Research Association. The results obta

    Jan 1, 1977

  • NIOSH
    OFR-49(1)-79 Construction, Inspection And Maintenance Of Mine Haulage Track, Volume I

    By Edward G. Cunney

    [Track in underground bituminous coal mines was investigated and technology has taken from other industries in order to Main information on conditions that impair the safety and efficiency of the trac

    Jan 1, 1977

  • NIOSH
    OFR-77-78 A Census Of Mobile Machines Used In U. S. Surface Coal Mines

    By Eric E. Unger

    Results are presented of a census of the machines used in surface coal mines in the United States. The numbers of each machine type and model reported to be in use are tabulated for large and small mi

    Jan 1, 1977

  • NIOSH
    OFR-60-78 Analysis Of Coal Preparation Plants For Applicability Of The National Electrical Code - Part I: Analysis And Review - Part II: Recommended Guidelines

    By S. Atallah

    A survey was conducted relating to the current practices for the classification of hazardous locations in coal preparation plants. Several plants processing bituminous, anthracite and lignite coal in

    Jan 1, 1977

  • NIOSH
    OFR-117(1)-77 Limits And Cost Sensitivity Of Alternate Parting Handling Methods - Volume 1

    By Thomas E. Finch

    This report is a continuation and expansion of a previous USBM grant (No. G0254004) which examined alternative methods of handling the parting between two coal seams in a surface mining operation. The

    Jan 1, 1977

  • NIOSH
    OFR-133A(2)-77 Longwall-Caving Mining Method For Thick Coal - Design And Feasibility Study - Final Report, Volume II

    By M. G. Wallis

    This report presents the results of a study to develop a detailed mining method design based on longwall mining with sublevel caving. The method is applicable to low-dipping coal seams 20 or more feet

    Jan 1, 1977

  • NIOSH
    OFR-123(5)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume V Application Of PSU/MVS To The Ventilation Planning Of A New Mine

    By R. Stefanko

    In this report, the use of Penn State Ventilation Simulator (PSU/MVS) for planning and evaluating new coal mine ventilation systems is demonstrated. The simulator's application to evaluate the ve

    Jan 1, 1977

  • NIOSH
    Mining And Mineral Operations In The North-Central States - A Visitor Guide - Introduction

    Minerals are vital to any industrialized civilization. Annually, the United States uses more than 4 billion tons of new mineral materials, or about 40,000 pounds per person-about half being mineral fu

    Jan 1, 1977

  • NIOSH
    OFR-106-77 Time Domain Reflectometry Microcomputer

    By Roger A. Dworak

    This report describes in detail the work done on the development of the Time Domain Reflectometry Microcomputer (TDRM). Modifications to the FMC-Model 302A Cable Fault Locator is described in Appendix

    Jan 1, 1977

  • NIOSH
    OFR-14-78 Development Of Optimized Diffuser And Spray Fan Systems For Coal Mine Face Ventilation

    By Robert E. Wallhagen

    This report describes the results of a four year investigation into improved face ventilation systems for underground coal mines. The objective was to experimentally determine configurations for a dif

    Jan 1, 1977

  • NIOSH
    OFR-29-78 Mine Wide Test Of The WVU Monitoring Concept - Phase I Final Report: System Design, Installation And Test Results

    By M. D. Aldridge

    The results of designing, constructing, installing and operating a ventilation monitoring system throughout an entire commercial coal mine is presented. Measured parameters were airflow, methane, carb

    Jan 1, 1977

  • NIOSH
    OFR-117(2)-77 Limits And Cost Sensitivity Of Alternate Parting Handling Methods - Volume II - Appendix A - Operating Instructions For The Production Profile Program

    The Production Profile Program is written for use on a Digital Model PDP 11/70 computer using a Fortran IV level G language. It may be run on any system which uses G level or an upward compatible vers

    Jan 1, 1977