Search Documents

  • AUSIMM
    Blast design and execution drives mine site profits

    By J Loeb, J Dampney, P Cameron

    Optimisation of Blast Design and Execution must be done right the first time. It is too late after the ore is broken. Consequences of poor design and execution negatively affect productivity from load

    Jun 22, 2022

  • AUSIMM
    The use of collaboration and management to turn-around the performance of a failing copper mine

    By M Jacobs

    This abstract discusses a heap leach copper mine that was failing to perform and as a result was not meeting targeted production. The mine had numerous technical challenges including: high water inflo

    Jun 22, 2022

  • AUSIMM
    The role of fleet management in reducing carbon emissions from haul trucks

    By D Prior

    The Australian mining industry is a significant contributor to the nation’s greenhouse gas (GHG) emissions, and like any industry, it must make efforts to reduce these. Medium- and long-term strategie

    Jun 22, 2022

  • AUSIMM
    Transition from owner mining to contract mining – a structured tender process using a holistic approach

    By Y G. Anoman

    This paper discusses the operating model within Endeavour Mining Corporation regarding the options of owner mining against contract mining. It’s based on the concept of ‘are we carrying out the most e

    Jun 22, 2022

  • AUSIMM
    The application of digital twin machine learning models for Mine to Mill and Pit to Plant optimisation

    By X Hu, Z Pokrajcic, R Embry, P C. Stewart, J Carpenter, E Jones

    Whilst the value of Pit to Plant and Mine to Mill optimisation has been proven since the 1990s, sustaining the productivity and efficiency gains typically requires ongoing test work, blast trials, pla

    Jun 22, 2022

  • AUSIMM
    Managing remediation, and risk of failure, to complete extraction of a short life open pit

    By C E. Woolley, A Hosseini, J Foster

    Northern Star’s Thunderbox Open Pit C-Zone cutback was designed to maximise extraction in a short life excavation; In fresh rock on the western wall this included 20 m to 30 m bench heights with 6.5 m

    Jun 22, 2022

  • AUSIMM
    Social licence to operate – circular economy

    By L Schürmann, R Kendall

    Social licence to operate is becoming part of a mining company’s DNA in the same way as health and safety. Consequently, mining companies are receiving increasing pressure from their shareholders to e

    Jun 22, 2022

  • AUSIMM
    Slope stability is a critical issue for the open pit mining community

    By M Edgar, G Pattemore, M Auad, K Job, A Job, S Gale

    In recent decades, significant advances have improved the modelling techniques for predicting slope failure. Predicting failures is vital in open pit mining due to the significant risk posed to person

    Jun 22, 2022

  • AUSIMM
    Dredger drop impact on slope stability – Hazelwood Mine

    By J Stipcevich, N Patel, J Faithful5, S Narendranathan, L Tatnell4

    ENGIE, the current owner and operator of the Hazelwood Open Cut coalmine, are in the process of rehabilitating the mine site in preparation for mine closure. Bucket wheel excavators (dredgers) used du

    Jun 21, 2022

  • SME
    Near‑Technical Limit Gold Recovery from a Double Refractory Carlin‑Type Ore After Pre‑treatment by High‑Temperature Pressure Oxidation

    By DEVY DYSON, Brian Hart, JOHN LANGHANS, Stamen Dimov, STEVE YOPPS

    A recent Nevada Gold Mines research program focused on pressure oxidation pre-treatment of a Carlin-type double refractory ore from the Turquoise Ridge Mine. The research team found that both arsenian

    Jun 21, 2022

  • SME
    A Rapid Review of Collision Avoidance and Warning Technologies for Mining Haul Trucks (Mining, Metallurgy & Exploration)

    By JOHN HOMER, Jacob L. Carr, Jonathan K. Hrica, Kathleen M. Stabryla, Iman Benbourenane, Jennica L. Bellanca

    Given the recent focus on powered haulage incidents within the US mining sector, an appraisal of collision avoidance/warning systems (CXSs) through the lens of the available research literature is tim

    Jun 17, 2022

  • SME
    Characterizing Coal Pillar Deformation and Air Leakage Pattern During Longwall Face Mining

    By Yuchen Wu, Jing Mei, GUOZHONG LIU, KE GAO, Songjie Tian, Jianwei Cheng, Yu Wang, Yuhang Wu, Hui Wang

    The stability and integrity of protective coal pillars between the longwall working face and development roadways are greatly affected by the mining activities such as the development face advancing o

    Jun 16, 2022

  • SME
    Evaluation of Whole‑Body Vibration Exposure of Dozer Operators, a Task‑Based Approach

    By Bülent Erdem, Zekeriya Duran, Tuğba Doğan

    The objective of this study was to evaluate the potential health risk associated with exposure of dozer operators to whole-body vibration. Measurements were made on 31 dozers used in different surface

    Jun 16, 2022

  • SME
    Molybdenite Concentrate Purification by a Continuous Sulfation‑Leaching Process

    By I. WILKOMIRSKY, J. BECKER, F. Parada

    Purification of molybdenite concentrate from copper concentrates was performed by sulfation. The sulfation of molybdenite concentrates was carried out with pure sulfuric acid (> 96%) at 160–190 °C to

    Jun 14, 2022

  • SME
    Wet High Intensity Magnetic Separation (WHIMS) of Algerian Kaolin: a Potential Application

    By Mohammed Laraba, Rodrigo Alvarez Garcia, Juan Maria Menendez-Aguado, Roula Abdelmalek

    The aim of this research is the study of the WHIMS parameters on the improving process of a local (DD: Djebel Debbagh, East of Algeria) kaolin. The obtained results of performed XRF, SEM, and XRD char

    Jun 11, 2022

  • SME
    A Derivative Method to Calculate Resistance Sensitivity for Mine Ventilation Networks (Mining, Metallurgy & Exploration)

    By Lihong Zhou, DAVOOD BAHRAMI

    A reliable and stable ventilation system is essential to the safe operation of underground mines. The stability of a mine ventilation system becomes extremely critical while responding to a fire incid

    Jun 7, 2022

  • SME
    Preparation of Magnesium Chloride from Magnesite Dust Using Hydrochloric Acid Leaching and Spray Drying

    By Ch. R. V. S. Nagesh, Ramesh Naidu Mandapati, Venkata Swamy Nalajala, Tondepu Subbaiah, Naga Jyothi Kothamasu

    Leaching studies of magnesite obtained from Tamilnadu Magnesite Limited, Salem, have been carried out using hydrochloric acid leaching and percentage of magnesium chloride recovered was estimated. The

    Jun 7, 2022

  • SME
    Structures and Reduction Kinetics of Pelletized Rich Iron Ores for Iron Production: a Case Study for Na Rua Iron Ore in Vietnam

    By Lim Thi Duong, Du Duy Bui, Thuat Ngoc Pham, Chuc Ngoc Pham, Que Anh Nguyen, Hoa Anh Bui, Chi Thi Ha Nguyen, Hoan Thanh Nguyen, Bac Quang Nguyen, Kien Trung Nguyen, Dung Trung Doan, Nhiem Ngoc Dao

    The microstructures and kinetics of a rich iron ore ( TFe = 65.84%) of Na Rua mine, Vietnam, used for the iron production were investigated in this study. Thermal behaviors of iron ores were well-exam

    Jun 7, 2022

  • SME
    Efficient Recovery of Niobium and Tantalum from Ferrocolumbium Tantalum by a Continuous Leaching Process Using HF − H2SO4 − HNO3 Synergistic System

    By Zhiyuan Ma, Yong Liu, Xianjin Lyu, Jianfang Lyu, Jikui Zhou

    A stable and continuous leaching process for niobium and tantalum extraction from ferrocolumbium tantalum (FT) was developed. The effects of initial concentration of HF and H2SO4, grinding fineness, l

    Jun 5, 2022

  • SME
    Flotation Tendency Assessment Through DOE: Case of Low‑Grade Moroccan Phosphate Ore

    By Abdelaziz Baçaoui, Imane Aarab, Mohammed Derqaoui, Abdelrani Yaacoubi, Khalid El Amari, Abdelmoughit Abidi, Abderahman Etahiri

    Numerous researchers have addressed the complexity of the direct flotation separation of apatite from low-grade phosphate ore. The majority of these studies were limited to the micro-flotation scale.

    Jun 5, 2022