Search Documents

  • ISEE
    New Horizons of the Engineering of Blasting in Service of Productivity: Selective Sequencing

    By Matias Suarez, Diego Zenteno

    This paper is aimed to display the new advancements of blasting engineering done in different mining sites throughout the country, associated to electronic sequencing, energy of the explosive and its

    Feb 1, 2020

  • ISEE
    Render-Safe Operations in an Urban Environment

    By Robert McClure, Carlton Lehman

    Rendering safe explosives in an urban environment presents a unique challenge due to the safety concerns and disruption to the general public. Potential damage to the surrounding homes, businesses, ut

    Feb 1, 2020

  • ISEE
    Minimising Coal Damage and Loss Due to Cast Blasting

    By Tapan Goswami

    This paper discusses the importance of coal mapping, the rock properties of the roof and floor interface of the coal seam, and the significance of loading and initiating designs in minimising coal dam

    Feb 1, 2020

  • ISEE
    Hybrid Specifications for Underwater Blasting Specifications on the Soo St. Marie Channel Deepening

    By Timothy Smith, Matthew Ryan, Dr. Anthony Konya

    Hybrid specifications are a relatively new style of specifications specifically for the drilling and blasting industry that has seen widespread use over the last decade with the U.S. Army Corp of Engi

    Feb 1, 2020

  • ISEE
    A Five Staged Approach to the Analysis of a Blast from Budget Through to Implementation

    By Stephen Mansfield

    Analysing how accurately a blast design is implemented is one of the cornerstones of a successful operation, and critical for mine optimisation. This paper presents a concept that involves the collect

    Feb 1, 2020

  • ISEE
    Implementation of Track & Trace Solutions in Existing Production Environments

    By Frank Hirthammer

    The paper explains the procedure of implementing Track & Trace solutions for manufacturers of explosives based on customer experiences. By using concrete examples, the process from project start to im

    Feb 1, 2020

  • ISEE
    Kuz-Ram Equation Analysis: A Reparametrization for the Peruvian Case

    By Dennys Huaman, Carlos Rojas

    Using the Levenberg-Marquardt algorithm to reparametrize the Kuz-Ram original model equation of the mean characteristic size and assess the errors of both models and their comparisson using different

    Feb 1, 2020

  • ISEE
    Optimized and Calibrated Migration to HXNBlast at Minera San Cristóbal

    By Javier Castaneda, Luis Zozaya, Noel Huarachi, María Rocha

    The objective of the project was to implement and calibrate drill and blast models supported by Geotechnical and Geological models as well as the mine and operation characteristics. The models would t

    Feb 1, 2020

  • ISEE
    Quake, Quarry, or Quack

    By Dominic C, Gregory B. Poole

    On December 12, 2018 at 4:14 AM EST, an earthquake registering a 4.4 magnitude on the Richter Scale occurred in central Tennessee. According to a survey posted on the USGS website, this earthquake was

    Feb 1, 2020

  • ISEE
    Track and Trace in Europe and Worldwide, the Beginning, the Present and in the Future

    By Frank Hirthammer

    Since the introduction of the Explosives Track & Trace in Europe in 2014 for manufacturers and 2015 for end-users, a lot has changed in all areas of the supply chain and the use of explosives. The reg

    Feb 1, 2020

  • ISEE
    A Method to Measure Detonation Front Curvature of Emulsion Explosives

    By Nikolaos Petropoulos, Ulf Nyberg, Ulf Stenman, Daniel Johansson, Håkan Schunnesson

    The optimization of the explosive performance is of great importance since blasting is extensively used in civil projects and mining industry. An improved understanding of how the energy from the deto

    Feb 1, 2020

  • ISEE
    Technology for Risk Management and Decision Making in Civil Explosives

    By Johan Hawinkel

    This paper explores the journey through time of technology in the civil explosives market to provide testing, measurement, analysis and control tools. This ultimately leads to better decision-making,

    Feb 1, 2020

  • ISEE
    Six Pillars, Inventory Management & ATF Record-keeping

    By Ron Ketterling

    We will discuss electronic and paper record keeping, what works and what doesn’t. We’ll review record keeping in light of those five sub-committees: Audit, Awards, Constitution, Ethics and Planning. Y

    Feb 1, 2020

  • ISEE
    Evaluation of the Methods to Determine Constituents of Bulk Commercial Explosives used in the Mining Industry

    By Kush Patel

    This paper presents methods currently available for the evaluation of bulk explosives and discusses the results of the evaluation of bulk explosives using each of the methods. Through the preliminary

    Feb 1, 2020

  • ISEE
    Digitization for Optimization: Easier and Cheaper

    By Benjamín Cebrián, David Flores, María Rocha Gil

    This document shows the evolution of drilling and blast digitization process, savings and trends in a mine, using new technologies that creates business opportunities and general improvement of D&B pr

    Feb 1, 2020

  • ISEE
    Signature Hole Analysis and Vibration Modeling: An Indonesian Case Study

    By Wawa Jaka Sungkawa, Slamet Rachman Jaka, Tom Dermody

    A project was undertaken to research and develop a method to confidently predict vibration. It was decided that the scaled distance formulas were not adequate to predict vibration when using non-elect

    Feb 1, 2020

  • ISEE
    Peculiarities of Drilling and Blasting in Underground Small-Scale Mines

    By Patricio González Santis, Jacopo Seccatore

    This paper documents drilling and blasting activities from gold mining in Ecuador and Chile. First, are described the outdated and often non-rational techniques employed by miners, to provide a genera

    Feb 1, 2020

  • ISEE
    Assessment of Post-blast Damage Zones in Tunneling Operations Through MWD and Machine Learning

    By Clara Godoy, J. A. Sanchidrian

    In this paper, Machine Learning techniques have been used to combine data monitored from the drill rig with scanner profiles of the excavated sections to develop an automatic geotechnical rock mass ch

    Feb 1, 2020

  • ISEE
    Automatic Blast Design Based on Autonomous Drone

    By Thierry Bernard

    New technology to automatically design a blast based on autonomous drone. The process of flying a drone, calculating the 3D cloud of points, generating the critical face profiles and placing holes aut

    Feb 1, 2020

  • ISEE
    Digitized, Integrated and Optimized Drill and Blast

    By Sushil Bhandari, Amit Bhandari

    In this paper, a case study is presented of a large global cement company using a cloud and mobile based platform across 17 of their mines consistently over a large number of users over a period of ov

    Feb 1, 2020