Search Documents

  • CIM
    Macroscopic Analysis of the Reaction between Molten Copper and Water: Simulations and Preliminary Experiments

    By T. Crivits, I. Bellemans, K. Verbeken

    In the metallurgical industry, furnace cooling is often employed to enhance furnace lifetime. Hence, the pyrometallurgical phase comes in close contact with a non-air coolant. The proximity of the pyr

    Jan 1, 2019

  • CIM
    Oil Sands Tailings Storage Facilities: Design Considerations for Ease of Closure

    By N. A. Beier, N. Slingerland

    "Oil sands tailings impoundments rank among the largest (spatially) in the world, covering a total of approximately 220 km2 of northern Alberta, Canada. A preliminary geomorphic design for an oil sand

    Jan 1, 2019

  • CIM
    Design and Construction of a 1/40th Scale Longwall Mine Model for Physical Testing of Methane Explosions

    By R. C. Gilmore, J. McMack, G. E. Bogin, J. F. Brune, C. DeRosa

    "Researchers at the Colorado School of Mines are designing and building a 1:40 scaled physical model of a fully operational longwall coal mine. The purpose of the model is to minimize the occurrence o

    Jan 1, 2019

  • SME
    Mining Asset Development for Virtual Reality

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • CIM
    Raise Drilling and Equipping a 1,892 Metre Deep Service Shaft in Zambia

    By B. Burger, T. Bester, S. Deonarain, L. S. Schultz

    "This paper details the process followed to raise drill and equip a 6.1 metre diameter vertical service shaft at Glencore’s Mindola Deeps project in Kitwe, Copperbelt Province, Zambia. The project sco

    Jan 1, 2019

  • SME
    Our Efforts to Modernize an Archaic Mine Project Cost Estimating Software System

    By S. Stebbins

    In 1994 Western Mine Engineering, Inc., (WME), which is now InfoMine USA, Inc., set out to build a suite of stand-alone software programs that would provide their clients the means to estimate the cos

    Jan 1, 2019

  • CIM
    Lucky Friday’s No. 4 Shaft - Ten Years from Concept to Completion

    By David Berberick

    "Hecla Limited’s No. 4 Shaft at the Lucky Friday Mine is the largest capital expenditure in the corporation’s 128-year history and is considered the deepest shaft in the United States. This paper will

    Jan 1, 2019

  • CIM
    New Opportunities for Closed Mining Sites: Bioprospecting for Antibacterial Agents

    By G. N. A. Senhorinho, J. A. Scott, C. A. Laamanen

    "Closed mine sites are widely regarded as a negative asset due to their legacy of environmental impacts. These sites are often characterized by waterbodies with elevated metal concentrations and low p

    Jan 1, 2019

  • SME
    Mineworkers’ Perceptions of Mobile Proximity Detection Systems

    By J. Helton, J. L. Bellanca, M. McNinch, L. R. Swanson

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • CIM
    Advanced Thermodynamic Modeling in the Pyrometallurgy – Refractory Corrosion Simulations

    By C. Pichler, S. Luidold, C. Wagner, C. Sagadin, D. Kreuzer

    Engineers and scientists have been combating the attack upon refractory materials of molten metals/matte and slags for hundreds of years. The details in many cases are still questionable or at least d

    Jan 1, 2019

  • SME
    The Development of a Multiple Level Underground Limestone Mine from Geology through Mine Planning

    By Christopher Newman, Robert Dupuy, David Newman

    "The development of a multiple level underground mine is a complex task in which geology, engineering, ground control, and unit operations are integrated into a single mine design. The components are

    Jan 1, 2019

  • CIM
    Incorporating Ventilation Fan Plants in Rail and Vehicular Roadway Overbuilds

    By R. E. Ray

    "As real estate for new development in urban settings becomes scarce, commercial high rises are being constructed above open passenger rail tracks and vehicular roadways. Rail and roadway overbuilds a

    Jan 1, 2019

  • CIM
    ILTEC Technology – New Pathways towards Safe and Effective Cooling

    By T. Lux, M. Hanel, Degel, A. Filzwieser, R., H. Joubert

    It is the increasing demand for an economic and cost saving operation mode that requires effective cooling in order to achieve low refractory wear and good furnace lifetime, which is making cooling te

    Jan 1, 2019

  • CIM
    Ventilation Strategy Related to Battery Powered Equipment at Macassa Mine

    By S. Ross, M. Mayhew

    "Kirkland Lake Gold introduced battery equipped vehicles (BEVs) at the Macassa Mine in 2011. The fleet of underground BEV haulage trucks and loaders has grown over the years to over 30 units, the worl

    Jan 1, 2019

  • SME
    Optimization Oriented Work Preparation for Sub-Surface Construction Work under Special Consideration of Construction Logistics and Explicit Choice of Procedure and Equipment

    By J. Herhold, S. Plaum

    The focus within the economical optimization of projects, which are conducted underground, shifts more and more towards the conduction of construction work underground. Underground operations can be d

    Jan 1, 2019

  • SME
    Practical Options for Solving the Dolomite Problem with Florida Phosphate Resources

    By C. Feng, W. Song, B. Moudgil, P. Zhang, W. Xiao

    Separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. Over 50% of the future phosphate reserves in Florida contains too much dolomite to process using

    Jan 1, 2019

  • SME
    Declustering Weights as a Measure of Average Sample Spacing, Applications in Mineral Resource Classification

    By D. Hulse

    Mineral resource classification is described in both the SME and CIM Standards for Mineral Resource Reporting. The CIM Standard states “… sampling … is sufficient to assume geological and grade or qua

    Jan 1, 2019

  • CIM
    Overview of Active Explosion Barrier Systems for Underground Coal Mines

    By Laura Steeves, Inoka Eranda Perera, Jhon Silva, Arend Spaeth

    "This paper reviews the main concepts ruling the design, implementation and performance of active explosion barrier systems for underground coal mines in the USA. The document examines the parameters

    Jan 1, 2019

  • CIM
    Auction-Based Control as a Site Implementable Means of Stabilising the Movement of Material through a Train of Countercurrent Decantation Thickeners

    By B. R. Maas

    Processing material at a consistent rate through the continuous countercurrent decantation (CCD) thickeners presented a major bottle neck to unlocking additional value from one of the post-flotation s

    Jan 1, 2019

  • CIM
    Preventing and Managing Fires at Deep and Ultra-Deep Level Gold Mines in South Africa

    By M. G. Beukes

    "In South Africa most of the large gold mines operate between 1500m and 4500m below surface where reef is accessed initially through a vertical shaft system then via a network of tunnels and mined in

    Jan 1, 2019