Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Simulações Numéricas Da Vazão De Água Em Lanças Para BofBy Breno Totti Maia
Para uma boa operação das lanças de oxigênio para convertedores BOF é necessário existir uma boa condição de refrigeração, devido à agressividade existente no ambiente, onde ela fica exposta a condiçõ
Jul 29, 2018
-
Otimização Do Transporte Ferroviário Outbound Na Arcelormittal MonlevadeBy Paulo Eduardo Melo da Cunha
Com um cenário de constante mudança na área e logística, uma demanda cada vez maior por transporte rápido, eficiente e a baixo custo, muito se tem exigido dos gestores de logística na solução, otimiza
Jul 29, 2018
-
High Impact Integrated Melt Shop Management Systems - Effective Implementation With Sustained SuccessBy John Ross Middleton
Based upon 30 years+ experience in the Development, Implementation and Ongoing Support of Computer based Melt Shop Management Systems in about 40 plants in the UK, Europe and the USA, consideration of
Jul 29, 2018
-
Installation Of A 350 T Bof Converter At Arcelormittal PolandBy Günther Staudinger
Danieli Linz Technology has been honored at 4.1.2013 with the first contract for the exchange of a 350 t BOF converter for ArcelorMittal Poland Dabrowa Gornicza on a turnkey basis. This paper describe
Jul 29, 2018
-
Classificação Computacional Da Segregação Central De Placas Pelo Processamento De Imagens De Impressões De BaumannBy Franz Ramstorfer
Impressões de Baumann são utilizadas amplamente nas aciarias para a avaliação e monitoramento da qualidade interna de placas: em particular a segregação central. A análise e monitoramento da segregaçã
Jul 29, 2018
-
Martabe integrated life-of-mine optimisationBy K J. Grohs
Martabe gold and silver mine is situated in northern Sumatra and comprises several deposits in steep terrain that are required to be developed in the optimal sequence for the best possible Net Present
Jul 25, 2018
-
A risk-based approach to drainage design standard selection for mine rehabilitation and relinquishmentBy A Densten, C Gimber
Surface water management and drainage is a key aspect of mine rehabilitation and closure planning. In the authors’ experience, drainage related problems are amongst the most common forms of failure in
Jul 25, 2018
-
Wetting and drying cycles as a means to determine the effect and consequences of tailings ageingBy T Baumgartl, R Akesseh, M Edraki, B Usher, M Shaygan
With the continuing demand for industrialisation and urbanisation, the rate of mining and processing lower grade ores will also increase, producing large quantities of waste. As extreme weather events
Jul 25, 2018
-
Mount Isa Mines Rehabilitation Materials Sampling and Analysis program for closure planningBy C Nucifora, M Landers, J Jones, G Maddocks, K Mandaran, A Forbes, W Wilson, S Newman
Glencore’s Mount Isa Mines Limited (MIM) operates the Mount Isa open cut and underground copper (Cu) and zinc-lead (Zn/Pb) mines near Mount Isa in Queensland, Australia. Tailings from processed Cu and
Jul 25, 2018
-
Are our closure planning and regulatory processes adequate to identify, quantify and appropriately transfer residual risks after successful mine rehabilitation?By P B. Swart, P D. Erskine
Despite an increasing focus by media, communities and activists driving an elevated regulatory focus in Australia and indeed some other mining jurisdictions, the mining industry globally has had limit
Jul 25, 2018
-
Evaluation of sustainability of copper production value chain from ore to metal using advanced simulationBy A Remes, A Dennis, M Talikka, T Kotiranta, S Horn
A mine project combines vast amounts of information from various disciplines including but not limited to geology, mining, metallurgy, technology, environment and economics. In many cases, all relevan
Jul 25, 2018
-
Conclusions from long-term cover system performance monitoring – a case studyBy R Barritt
Remedial options for a waste rock dump (WRD) were considered as part of closure planning studies at an active mine in Western Australia. To minimise the impact of any seepage from the landform it was
Jul 25, 2018
-
Listening to Local Voices – a systematic approach for understanding what a social licence to operate means for Rio Tinto in the PilbaraBy L Dawson, S Carr-Cornish, N Boughen, K Moffat, S Masterson
The risk and consequences of community rejection and loss of a social licence to operate is well articulated (Moffat et al 2018), however, the means for systematically managing this risk are less esta
Jul 25, 2018
-
Arsenic pathways in copper mining – sustainability issues and potential solutionsBy D Bradshaw, E Forbes, M Edraki, M Tayebi-Khorami, E Manlapig
There is an increasing trend in the extraction and development of copper resources from complex deposits. These deposits pose mineral processing challenges, as they often contain low grade disseminate
Jul 25, 2018
-
Olympic Dam mine closure planning processBy G Hill, D Grant, M Tyler
Located approximately 570km NNW of Adelaide in South Australia, the Olympic Dam mine (OD) is the world’s fourth largest remaining copper and gold resource and the largest uranium resource. Discovered
Jul 25, 2018
-
Utilising mine planning to deliver closure landforms through productive movementBy M Bettison, R Wright, N Taylor
The primary mine planning focus during early study phases of future mining projects is Life of Asset ore production and grade quality, this will always be the situation. While waste schedule optimisat
Jul 25, 2018
-
Is your mine closure a sustainability failure? Transform your asset and create a self supporting neighbouring community. It’s as easy as ABCD!By K Cochrane
Time and time again history shows us that mine closures are sustainability failures. Mine operators do not know how to turn the mine closure into an asset and communities around the mine do not know h
Jul 25, 2018
-
Risk management for minesite closure planning and execution – start now! Lessons from the closure of the Leigh Creek Coalfield, South AustraliaBy A Querzoli, B Williams
In late 2014 the Flinders Power Management Team was executing business improvement plans to ensure continued electricity generation until 2028 and beyond. Six months later, in June 2015, the Board ann
Jul 25, 2018
-
Using an undisturbed landform to calibrate long-term predictions of the evolution of a rehabilitated landformBy G R. Hancock, M J. Saynor, J B. C Lowry, K G. Evans, M Narayan
Tools such as landform evolution models (LEMs) provide a means of predicting how a landform may evolve over extended periods of time. Here, we utilise the CAESAR-Lisflood LEM to assess a proposed reha
Jul 25, 2018
-
Contour banks in spoil rehabilitation – a matter of timingBy J L. Merritt
Contour banks and waterways are standard soil conservation measures to assist farmers reduce the impact of gully erosion on sloping cropping land by reducing the slope length to the interval between t
Jul 25, 2018