Search Documents

  • AUSIMM
    Reducing the Cost of Tunnel Design in Australia

    By B Rouvray, R Bertuzzi

    The development of a design-and-construct tunnelling project in Australia from its concept to its construction requires designs to be prepared and reviewed at several distinct stages prior to document

    Sep 17, 2014

  • AUSIMM
    Pacific Highway Upgrade from Tintenbar to Ewingsdale (T2E), St Helena Tunnel

    By A M. Mueller

    St Helena tunnel is the centrepiece of the Pacific Highway upgrade from Tintenbar to Ewingsdale, abbreviated and commonly known as T2E. At the deepest point the twin tunnels run 45 m below the ridge l

    Sep 17, 2014

  • AUSIMM
    Characterisation of In Situ Stresses for Tunnel Lining Design in the Sydney?Basin

    By A L. de Ambrosis, S J. Clarke

    In the non-codified realm of tunnel design there are issues which are sure-fire instigators of controversy. This paper presents a discussion regarding one particular issue which in the authors’ experi

    Sep 17, 2014

  • AUSIMM
    The Use of Sprayable Waterproofing Membranes in Underground Structures – Concept, Design Options, Benefits and Limitations

    By W Mahoney, F Clement, E Saraiva

    Prefabricated waterproofing sheet membranes are extremely complicated to install in underground sections with complex geometries and, despite being already subjected to quality tests in the factory, t

    Sep 17, 2014

  • AUSIMM
    Earth Pressure Balanced Tunnelling in a Dense Urban Environment, C917A

    By G Jones

    The Singapore Land Transport Authority (LTA) has been procuring the expansion of their underground mass rapid transit rail network at a prodigious rate since the first line opened in 1987. Four lines

    Sep 17, 2014

  • AUSIMM
    The Development of a Procedure for the Inspection of Unlined Rock Service Tunnels

    By D Lees, D Gilchrist

    Sydney has hundreds of kilometres of sewer tunnels. Many of these are over 50 years old and some have been in service for more than 100 years. The tunnels are predominantly constructed in Hawkesbury S

    Sep 17, 2014

  • AUSIMM
    Age-dependent Changes in Post-cracking Performance of Fibre-reinforced Concrete for Tunnel?Segments

    By E S. Bernard

    Toughness testing of fibre reinforced concrete (FRC) at 28 days age is typically undertaken as part of quality control for the many applications where fibres are used in concrete, including shotcrete,

    Sep 17, 2014

  • AUSIMM
    Behaviour-based Safety with a Foreign-based Workforce

    By R Brown

    The Singapore Land Transport Authority Contract C917A is for the design, construction and completion of all outstanding works under the original Contract 917, including taking over the design and cons

    Sep 17, 2014

  • AUSIMM
    Live Track Railroad Tunnel Repair and Clearance Improvement in the United States

    By J Schrank

    Double-stack trains in the United States date back to the early 1980s, starting about the time deregulation of the rail industry occurred. Freight rail became increasingly more competitive to trucking

    Sep 17, 2014

  • AUSIMM
    NO2:NOx Ratios in Australian Road Tunnels

    By P Gehrke, S O’Gorman

    The precise measurement of NO2 was historically difficult in road tunnels, hence criteria and design analysis was based on converting from NOx concentrations via a set NO2:NOx ratio. The reliable dire

    Sep 17, 2014

  • AUSIMM
    SIL904 Hong Kong – Drill and Blast Tunnels, Station Blasting Innovations (Double- and Triple-deck Blasting) and Lining Solutions

    By W Curlewis, D Hake, Z Cuthbert

    The South Island Line (East) will be a medium-capacity railway covering approximately 7 km from Admiralty Station to South Horizons Station on the south side of Aberdeen Harbour in Hong Kong, with int

    Sep 17, 2014

  • AUSIMM
    Development of a Segmental Lining Specification for Steel Fibre Reinforced Concrete Flexural Strength Testing Using Round Panel Tests

    By S Kost, R Nievergelt, F Cortes

    In recent years, the use of steel fibre-reinforced concrete (SFRC) for segmental tunnel linings has become increasingly popular due to numerous advantages including durability, resistance to spalling,

    Sep 17, 2014

  • AUSIMM
    Road Infrastructure Security Assessment and Measures Selection Methodology Using SecMan – Tunnel Example

    By J Karlovšek, M Hafner, M Žibert

    The transport network in Europe is probably one of the most important systems for the European economy and society. Trans-national transport routes play a vital role in the traffic of goods and the su

    Sep 17, 2014

  • AUSIMM
    Maldon to Dombarton Rail Link – Design Development of the Avon Tunnel

    By A Bagis, T Baker

    In 1983 the New South Wales (NSW) Government began to construct a 35 km freight rail line to provide additional rail capacity to Port Kembla in the Illawarra region, south of Sydney, through a direct

    Sep 17, 2014

  • AUSIMM
    An Iterative Geographic Information System Based Approach for the Assessment of Tunnelling Impact to Existing Buildings and Structures

    By L Cain, C Every, S Mirlatifi, J Ashley

    This paper presents a geographic information system (GIS) based method for the prediction of ground movement and the associated impact on existing buildings and structures due to tunnelling in the Nor

    Sep 17, 2014

  • AUSIMM
    Full-scale Tests on Precast Tunnel Segments Made in Concrete Reinforced with High-strength Steel Fibres

    By A Ross, B De Rivaz

    The results of full-scale tests on precast segment made at University of Roma are presented. The segments were cast using fibre-reinforced concrete produced without any traditional reinforcement, by u

    Sep 17, 2014

  • AUSIMM
    Scenic Railway Tunnel Upgrade in the Blue Mountains, New South Wales – An Approach to Design and Construction

    By A Hughes, S G. Rosin

    This paper presents the design and construction approach adopted for the widening and stabilisation of the existing decline tunnel forming part of the Scenic Railway Upgrade project at Katoomba in the

    Sep 17, 2014

  • AUSIMM
    Northparkes Mines – Flotation and Planning for the Future

    By G Harbort, D Clarke, D Morgan, C Sola

    Northparkes Mines commenced production in 1994 and the mine has significant reserves to allow operation into the future. There are a number of potential future concentrator feed sources with variable

    Sep 1, 2014

  • SME
    Environmental and Mineral Exploration System Integration: Promoting Capture of Quality Environmental Data from the Outset

    By Tom Dettweiler, Robina Sharpe, Wright. Michael

    The International Seabed Authority and a number of countries have or are in the process of developing environmental impact assessment guidelines and legislation for seafloor mineral development. The f

    Sep 1, 2014

  • AUSIMM
    Functional Performance of Ball Milling Circuits – A Plant Metallurgist’s Tool for Process Characterisation and Optimisation

    By O Arafat, K M. Bartholomew

    A voracious consumer of energy and grinding media, the modern ball milling circuit has a huge direct cost impact on a mineral processing operation. Through optimisation, grinding also has the potentia