Curved Microtunneling to Reduce Disruption in City Environment - RETC2023By Allan Rocas, Aswathy Sivaram, Daniel Cressman, Tatiana Chiesa
The City of Toronto plans to construct a 1,350 mm consolidation sewer along the East Don Roadway (EDR). The project includes installation of approximately 260 meter of 1,350 mm diameter concrete press
Jun 13, 2023
-
The Versatility of Tunnelling and Trenchless Methods for Sustainable Grid Construction - RETC2023By M. Peters, P. Schmäh
The development of renewable energies and a sustainable power grid are the challenges for future energy supply. Underground cables will replace the vulnerable overhead lines, because of their safety b
Jun 13, 2023
-
Design and Construction of REM Tunnels and Underground Structures - RETC2023By Verya Nasri, Agustin Rey
Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill
Jun 13, 2023
-
Using the Digital Geologist to Count Cobbles at the RSC7 Tunnel - RETC2023By Dan Preston, Shane Yanagisawa, Robert Marshall, Don Deere
Geotechnical Baseline Reports often estimate the number of cobbles that will be encountered in terms of volume or weight. These estimates are practically impossible to verify in the field. ClaroVia Ho
Jun 13, 2023
-
Gateway Program—Cut and Cover Tunnels in Manhattan - RETC2023By Drew Bazil, David Smith, Matteo Ferrucci, David Pittman
The Gateway program will provide additional rail capacity between New Jersey and Manhattan. This paper describes how a 70-foot-deep section of cut and cover tunnel was designed to directly support fut
Jun 13, 2023
-
Remote De-Tensioning of Tieback Anchors After Structural Completion - RETC2023By Sean Peterfreund, Grant Finn, Ty Jahn
For urban underground development involving tieback anchors for excavation support, authorities having jurisdiction typically require tiebacks to be de-tensioned before project completion. This paper
Jun 13, 2023
-
Design and Planning of New Passageway Tunnel for Circulation Improvements at Grand Central— 42nd Street Station, New York City - RETC2023By Alfredo Valdivia, Dominic Reda, Vojtech Gall
The design and planning for the construction of a new passageway to improve access and circulation to better accommodate anticipated increased passenger flow within Grand Central—42nd Street Station.
Jun 13, 2023
-
Developing Project Cost Estimates in Volatile Markets - RETC2023By Connor Langford, Murray Gant, Ken Massé
For public organizations, preparing accurate project cost estimates is a critical component in capital project planning. Project delivery methods provide a structured approach to moving projects throu
Jun 13, 2023
-
Pipe Canopy Presupport with SEM Tunneling Under Active Roadway and Rail Tracks - RETC2023By Todd Kilduff, Ryan O’Connell
Pipe canopies continue to gain momentum as a reliable methodology for construction of excavations below critical facilities with minimal surface settlement tolerances, such as railroads or roadways. T
Jun 13, 2023
-
Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick
California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i
Jun 13, 2023
-
Metropolitan Water Tunnel Program in Massachusetts - RETC2023By Rafael C. Castro, Paul V. Savard, Kathleen M. Murtagh
Preliminary design is underway for the Massachusetts Water Resources Authority’s (MWRA) next major tunnel program, the Metropolitan Water Tunnel Program (MWTP). The MWTP is the latest part of MWRA’s o
Jun 13, 2023
-
Los Angeles, California JWPCP Effluent Outfall Tunnel Project— Tunneling Under Extremely Challenging Conditions - RETC2023By R. Schuerch, C. Cimiotti, M. Piemontese, N. Karlin, P. Perazzelli, P. Halton
The new Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to White Point Manifold. The tunnel will
Jun 13, 2023
-
Using GIS Application for Inlet/Outlet Tunnel Geologic Mapping for Ground Support (CH Reservoir Case Study) - RETC2023By Cory Bolen, Nadav Bar-Yaakov, Eric Zimmerman, Gregory Raines
The Chimney Hollow Reservoir Project broke ground in August 2021, constructing the tallest Asphalt Core Dam in North America, intending to improve reliability of drinking water supply to Northern Colo
Jun 13, 2023
-
Wireless Optical Displacement Sensor for Convergence and Divergence Monitoring - RETC2023By Raphael Victor
The construction and modification of tunnels brings a requirement for precise measurement of convergence and divergence to safeguard the structure, maintain safety and provide the assurance needed to
Jun 13, 2023
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023By Karin Bäppler
Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w
Jun 13, 2023
-
SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell
The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad
Jun 13, 2023
-
Direct Tensile Testing and CT-Scanning of Fiber Reinforced Shotcrete - RETC2023By Denis Tepavac, Mark Trim
Structural performance of fiber reinforced concrete (FRC) depends on its ability to carry tensile forces after cracking. Australian Standards AS5100-2017 and AS3600-2018 are the only available design
Jun 13, 2023
-
Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi
Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di
Jun 13, 2023
-
Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023By Enrico Pavese, Tim Kearney, Stefan Lemke
Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag
Jun 13, 2023