    Curved Microtunneling to Reduce Disruption in City Environment - RETC2023

    By Allan Rocas, Aswathy Sivaram, Daniel Cressman, Tatiana Chiesa

    The City of Toronto plans to construct a 1,350 mm consolidation sewer along the East Don Roadway (EDR). The project includes installation of approximately 260 meter of 1,350 mm diameter concrete press

    Jun 13, 2023

  • SME
    The Versatility of Tunnelling and Trenchless Methods for Sustainable Grid Construction - RETC2023

    By M. Peters, P. Schmäh

    The development of renewable energies and a sustainable power grid are the challenges for future energy supply. Underground cables will replace the vulnerable overhead lines, because of their safety b

    Jun 13, 2023

  • SME
    Design and Construction of REM Tunnels and Underground Structures - RETC2023

    By Verya Nasri, Agustin Rey

    Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill

    Jun 13, 2023

  • SME
    Using the Digital Geologist to Count Cobbles at the RSC7 Tunnel - RETC2023

    By Dan Preston, Shane Yanagisawa, Robert Marshall, Don Deere

    Geotechnical Baseline Reports often estimate the number of cobbles that will be encountered in terms of volume or weight. These estimates are practically impossible to verify in the field. ClaroVia Ho

    Jun 13, 2023

  • SME
    Gateway Program—Cut and Cover Tunnels in Manhattan - RETC2023

    By Drew Bazil, David Smith, Matteo Ferrucci, David Pittman

    The Gateway program will provide additional rail capacity between New Jersey and Manhattan. This paper describes how a 70-foot-deep section of cut and cover tunnel was designed to directly support fut

    Jun 13, 2023

  • SME
    Remote De-Tensioning of Tieback Anchors After Structural Completion - RETC2023

    By Sean Peterfreund, Grant Finn, Ty Jahn

    For urban underground development involving tieback anchors for excavation support, authorities having jurisdiction typically require tiebacks to be de-tensioned before project completion. This paper

    Jun 13, 2023

  • SME
    Design and Planning of New Passageway Tunnel for Circulation Improvements at Grand Central— 42nd Street Station, New York City - RETC2023

    By Alfredo Valdivia, Dominic Reda, Vojtech Gall

    The design and planning for the construction of a new passageway to improve access and circulation to better accommodate anticipated increased passenger flow within Grand Central—42nd Street Station.

    Jun 13, 2023

  • SME
    Developing Project Cost Estimates in Volatile Markets - RETC2023

    By Connor Langford, Murray Gant, Ken Massé

    For public organizations, preparing accurate project cost estimates is a critical component in capital project planning. Project delivery methods provide a structured approach to moving projects throu

    Jun 13, 2023

  • SME
    Pipe Canopy Presupport with SEM Tunneling Under Active Roadway and Rail Tracks - RETC2023

    By Todd Kilduff, Ryan O’Connell

    Pipe canopies continue to gain momentum as a reliable methodology for construction of excavations below critical facilities with minimal surface settlement tolerances, such as railroads or roadways. T

    Jun 13, 2023

  • SME
    Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023

    By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick

    California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i

    Jun 13, 2023

  • SME
    Metropolitan Water Tunnel Program in Massachusetts - RETC2023

    By Rafael C. Castro, Paul V. Savard, Kathleen M. Murtagh

    Preliminary design is underway for the Massachusetts Water Resources Authority’s (MWRA) next major tunnel program, the Metropolitan Water Tunnel Program (MWTP). The MWTP is the latest part of MWRA’s o

    Jun 13, 2023

  • SME
    Los Angeles, California JWPCP Effluent Outfall Tunnel Project— Tunneling Under Extremely Challenging Conditions - RETC2023

    By R. Schuerch, C. Cimiotti, M. Piemontese, N. Karlin, P. Perazzelli, P. Halton

    The new Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to White Point Manifold. The tunnel will

    Jun 13, 2023

  • SME
    Using GIS Application for Inlet/Outlet Tunnel Geologic Mapping for Ground Support (CH Reservoir Case Study) - RETC2023

    By Cory Bolen, Nadav Bar-Yaakov, Eric Zimmerman, Gregory Raines

    The Chimney Hollow Reservoir Project broke ground in August 2021, constructing the tallest Asphalt Core Dam in North America, intending to improve reliability of drinking water supply to Northern Colo

    Jun 13, 2023

  • SME
    Wireless Optical Displacement Sensor for Convergence and Divergence Monitoring - RETC2023

    By Raphael Victor

    The construction and modification of tunnels brings a requirement for precise measurement of convergence and divergence to safeguard the structure, maintain safety and provide the assurance needed to

    Jun 13, 2023

  • SME
    Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023

    By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline

    Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump

    Jun 13, 2023

  • SME
    Steep TBM Challenge for the Limberg III Pump Storage Power Plant Project - RETC2023

    By Karin Bäppler

    Hydropower produces almost two-thirds of the world’s renewable electricity generation and delivers a major contribution on the ambition of the Paris Agreement and Sustainable Development Goals (SDG) w

    Jun 13, 2023

  • SME
    SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023

    By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell

    The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad

    Jun 13, 2023

  • SME
    Direct Tensile Testing and CT-Scanning of Fiber Reinforced Shotcrete - RETC2023

    By Denis Tepavac, Mark Trim

    Structural performance of fiber reinforced concrete (FRC) depends on its ability to carry tensile forces after cracking. Australian Standards AS5100-2017 and AS3600-2018 are the only available design

    Jun 13, 2023

  • SME
    Designing and Constructing the Advance Tunnel for the Scarborough Subway Extension - RETC2023

    By Jorge Ferrero, Andreas Raedle, Uhland Konrad, Michael Dutton, Keivan Pak Iman, Walter Trisi

    Strabag, in partnership with Arup, is constructing the Advance Tunnel for the Scarborough Subway Extension (ATSSE); a project by Metrolinx and Infrastructure Ontario (Sponsors). The 10.7 m internal di

    Jun 13, 2023

  • SME
    Qualifications and Design of Waterproofing Systems for Underground Structures - RETC2023

    By Enrico Pavese, Tim Kearney, Stefan Lemke

    Watertightness is of central importance in hydraulic and underground structures but has always been associated with a risk, as demonstrated by the very high impact that water inflows have on the damag

    Jun 13, 2023