Search Documents

Sort by

  • CIM
    Effect of different modifiers on microstructures and porosity of A-356 alloys

    By A. Abdollahi

    Modification of the silicon in Al-Si alloys can be performed by adding a very small amount of some elements like Na, Sr and Ca to alter the form of silicon from an acicular shape to a fine fibrous one

    Jan 1, 2004

  • CIM
    Ball Valves with Nanostructured Titanium Oxide Coatings for High-Pressure Acid-Leach Service: Development to Application

    By J. Walker, G. E. Kim

    Since May of 2000, Mogas Industries, in partnership with F.W. Gartner Thermal Spraying Co. and using the services of Perpetual Technologies, has invested time, energy, and resources towards developing

    Jan 1, 2004

  • CIM
    Increase in efficiency of NOx reduction during simultaneous application of primary methods

    By L. Szecowka, M. Poskart, Siwka M. . J.

    Oxides of nitrogen, created during combustion, are the most hazardous components of atmospheric pollution. However, it is possible to limit the negative influence of hazardous components on the natura

    Jan 1, 2004

  • SAIMM
    Electrochemical Studies Of The Interaction Of Ethyl Xanthate With Pd-Bi-Te

    By J. A. Venter, M. K. G. Vermaak

    There are practical indications that flotation recovery of palladium bismuth tellurides is poor. This work tested whether this can be caused by a lack of interaction of the collector with the tellurid

    Jan 1, 2004

  • AUSIMM
    Project Management for All Seasons ù Financial Risk Mitigation in a Challenging World

    By O C. Aitken

    Mining project developers are committed to taking on all the challenges and obligations of financial risk management. It is interesting that our current models of project finance have not changed mark

    Jan 1, 2004

  • AUSIMM
    Management of Technical Risk for the Ravensthorpe Nickel Project

    By R Fury, I Skepper, D White, G Miller

    Although the Pressure Acid Leaching (PAL) of nickel laterites has been conducted at Moa Bay, Cuba, since the early 1960s, the commissioning delays generally encountered by the æsecond generationÆ of P

    Jan 1, 2004

  • CIM
    The Gas-Liquid Interfacial Areas in Bubble Plumes

    By S. J. Buckler

    Many metallurgical processes use submerged gas injection to increase the contact area between gas and liquid phases in order to promote faster overall reaction rates. The work presented in this paper

    Jan 1, 2004

  • ISEE
    Application of Strict Liabilty and Negligence to Blasting Claims

    By Timothy D. Stark

    Blasters are usually strictly liable for injury or damage caused by flyrock (trespassory invasion) and blast-induced vibrations (non-trespassory invasion). The application of strict liability to non-t

    Jan 1, 2004

  • DFI
    Load Testing Methods

    This Section describes four alternative methods for load testing of drilled shafts: high strain dynamic test (HSDT), rapid load test, static load test, and bottom load test. Until recently, static loa

    Jan 1, 2004

  • SAIMM
    Foaminess Of Slag: Cause And Control

    By S. Pal, A. K. Lahiri

    Most of the compounds present in slag are surface active. This gives rise to foaminess of slag. The foam life and foaming index are normally determined by the draining rate of slag through the plateau

    Jan 1, 2004

  • TMS
    Flow Array for Nickel Laterite Slurry

    By Donald J. Hallbom

    Limonitic nickel laterites slurries exhibit complex rheological properties including time dependency that varies from thixotropy to rheopexy. Chronic problems may occur if plant designers and operator

    Jan 1, 2004

  • SAIMM
    Application Of A High-Intensity Cooling System To Dc-Arc Furnace Production Of Ferrocobalt At Chambishi

    By B. Salt, R. Sullivan, E. Roos, M. de Vries, K. McKenna, L. R. Nelson, M. J. N. Uys, P. Jacobs, E. Munnik, P. Lewarne

    A review is presented of the furnace cooling system design and operating developments since the initial furnace start up in January 2001 of the Chambishi DC-arc furnace to produce ferrocobalt alloy. T

    Jan 1, 2004

  • CIM
    Study of Ultra-High Strength CrMo Steel by use of TEM, EDS and EELS

    By J. Qi

    Based on the commercial steel 42CrMo (4140, SCM440), a new generation of CrMo steel was developed by increasing the content of Mo, adding the alloy element of V and Nb, and decreasing the content of P

    Jan 1, 2004

  • AUSIMM
    Distribution of Alteration and Mineralisation in Northern Carlin Trend Gold Deposits, Nevada

    A series of petrological studies were carried out on the characteristics of alteration and mineralisation in mainly structural-controlled (Deep Star, Meikle, Deep Post) and predominantly lithological-

    Jan 1, 2004

  • AUSIMM
    CIP ù Who Needs It? A Combination Circuit of Gravity, Flotation and Intensive Leach May Provide the Optimal Environmental and Cost Outcome for Gold Plants ù Stage II ù Results

    By A McCallum, J Abols, G Patrick, G Johansen

    The authors challenge the traditional thinking that whole ore cyanidation followed by Carbon in Pulp (CIP) or Carbon in Leach (CIL) should be applied as a standard process in the majority of gold proc

    Jan 1, 2004

  • CIM
    Reducing the Energy Consumption of the Barrick Goldstrike Autoclaves

    By S. P. Cashin, D. Kashuba, W. Esplin

    Barrick has had 6 autoclaves in operation at the Goldstrike Mine, North of Carlin Nevada, since 1993. The 6 autoclaves operate in parallel, processing slurry of gold ore. The gold in the ore is predom

    Jan 1, 2004

  • SAIMM
    Electrochemical Studies Of The Interaction Of Ethyl Xanthate With Pd-Bi-Te (19717297-0989-49cd-af70-d160e30e4069)

    By M. K. G. Vermaak

    There are practical indications that flotation recovery of palladium bismuth tellurides is poor. This work tested whether this can be caused by a lack of interaction of the collector with the tellurid

    Jan 1, 2004

  • TMS
    SPLC -A Power Supply for Smelting Furnaces (ce60cb64-a8c7-44c1-8a55-6ea5dca00691)

    By Terry Gerritsen

    Electrode control systems regulate power by physically positioning electrodes. Due to the size and weight of the electrodes, this is a slow process where power fluctuations of less than a few seconds

    Jan 1, 2004

  • CIM
    Borehole seismic survey for mineral exploration: Case histories from Norman West and Halfmile Lake

    By G. Bellefleur, K. Stevens, E. Adam, D. Synder, G. Perron, C. Müller

    The Downhole Seismic Imaging consortium was initiated by the Geological Survey of Canada and three Canadian mining companies to assess the usefulness of borehole seismic techniques for the exploration

    Jan 1, 2004

  • CIM
    Modification of the Stillwater Base Metals Refinery Process

    By L. Newman, R. Wyrick, R. Berezowsky

    The Stillwater Mining Company operates an integrated mines, mill, smelter and base metals refinery complex in Montana, USA for the production of a high-grade platinum group metals (PGM) bearing concen

    Jan 1, 2004