Search Documents

Sort by

  • DFI
    Corroboration and Remediation Options

    "After the non-destructive testing is completed, the data must be compiled, evaluated, and interpreted. During this process, the data may indicate that there is an anomaly warranting further investiga

    Jan 1, 2004

  • ISEE
    2004G Volume 2 - Hotshot Auto-Programmable Electronic Detonator System

    By Detnet Solutions

    1. “Daisy-Chain” concept The term “daisy-chain” stems from the fact that when the HotShot? detonators are connected there is a chain or electrical path for electrical current to flow from detonator A

    Jan 1, 2004

  • SAIMM
    Splash Generation And Formation Of Surface Waves In A Bottom Blown Ferroalloy Refining Vessel

    Splashing and wave formation has been studied experimentally by using one-seventh water model of CLU (Creusot-Loire Uddeholm) reactor with two different tuyere configurations by using paraffin and wat

    Jan 1, 2004

  • CIM
    A Study of Lime Dissolution and Diffusivity in Steelmaking Slag

    By K. S. Coley, G. A. Irons, T. Kaneyasu

    "It is very important to reveal the lime dissolution mechanism in steelmaking slag, to promote its dissolution without calcium fluoride, which is now almost forbidden for use in most industrialized co

    Jan 1, 2004

  • ISEE
    Impulse Delivered to a Plate from Explosive Detonation

    By D. Goodings, W. L. Fourney, Bonenberger, R., Uli Leiste

    The problem of the maximum depth at which a mine buried in the surf zone or beach zone is a threat to landing vehicles is being studied by Naval Surface Warfare Center (NSWC), Indian Head Division, Na

    Jan 1, 2004

  • CIM
    Features of High-Temperature Oxidation of Non-Ferrous Metal Sulphides and Pyrite in Acidic Sulphate Solutions under Oxygen Pressure

    By K. N. Bolatbaev, S. S. Naboichenko

    The initial rates of dissolution of pyrite, chalcosine, sphalerite and galena in acidic sulphate solutions under oxygen pressure were measured in the range of Poe = 0.2-1 MPa, 130-180 °C, [H2SO4]0 = 0

    Jan 1, 2004

  • CIM
    Hot rolling process variable effect on the anisotropy of mechanical properties in Ti-6A1-4V alloy Hot rolling process variable effect on the anisotropy of mechanical properties in Ti-6A1-4V alloy

    By Jin-Hwa Song

    Rolling temperatures and cross rolling ratios were varied to investigate the effect of crystallographic texture of alpha-phase on the anisotropy of mechanical properties in modified Ti-6A1-4V alloy. H

    Jan 1, 2004

  • SME
    Stone Mine Design In Highly Fractured Rock

    By V. Scovazzo

    Cost-effective underground mine configurations have been designed in highly fractured rock masses where the stone possesses a high material strength. A limestone mine in the eastern United States is u

    Jan 1, 2004

  • AUSIMM
    The Tooloom Gold Project, NSW ù æForgotten But Not Gone!Æ Rediscovering a 147-Year-Old Gold Field

    By B A. Wake, G G. Lowder, M J. White

    The Tooloom gold field is located within the New England Fold Belt in the far northeast of New South Wales, approximately 130 km south southwest of Brisbane. Gold was first discovered at Tooloom in 18

    Jan 1, 2004

  • AUSIMM
    New Developments in the Bacterial Oxidation Technology to Enhance the Efficiency of the BIOX<sup>«</sup> Process

    By J van Niekerk

    The BIOX« process for the treatment of refractory gold ores and concentrates has been commercially in operation for 18 years. A total of six BIOX« operations have been successfully commissioned since

    Jan 1, 2004

  • IMMS
    Assessment Of The Rehabilitation Of The Seabed Following Marine Aggregate Dredging

    By S. E. Boyd

    Studies of benthic recolonization following the cessation of dredging in U.K. waters and elsewhere are limited, and are largely confined to experimental circumstances. Investigations of the physical

    Jan 1, 2004

  • SME
    Wallaby Planned Failure

    By A. Haile, A. Poole

    During 2001-2002, the Granny Smith Mine of Western Australia undertook the development of a planned circular failure. Excavation took place in an interim pit wall that intersected the transported sed

    Jan 1, 2004

  • SAIMM
    Seismic Hazard In Western Australian Mines

    A Seismic Hazard Scale (SHS) has been developed to provide a practical seismic hazard assessment tool applicable to mine site personnel. It has been applied to seismic data sets from numerous Western

    Jan 1, 2004

  • ISEE
    Drilling & Blasting of a Small Diameter Shaft Next to Historic Structure

    By Corry Goumans, Ron J. Elliot

    This paper discusses the challenges encountered in drilling and blasting of a small diameter shaft underneath a parking garage in historic Gastown, Vancouver, BC. This project involved drilling in a r

    Jan 1, 2004

  • DFI
    Brightman Street Bridge Replacement Project (fbb13111-569c-48aa-97e7-9bb48f6ec170)

    By Jeffrey M. Taylor, Arturo Ressi di Cervia

    "Construction of the drilled shafts for the Brightman Street Bridge Replacement Project were not only challenging due to working over the water but were also challenged by changed soil conditions, con

    Jan 1, 2004

  • CIM
    Coherent Jets in Steelmaking: Principles and Learnings

    By Pravin Mathur

    "Praxair&apos;s CoJet® technology was introduced in 1997 to effectively inject chemical energy in electric arc furnaces. Coherent jets were invented as a revolutionary means of injecting oxygen and ot

    Jan 1, 2004

  • DFI
  • TMS
    Effect of Process Variables on Droplet Heat Transfer

    By Hani Henein

    "Heat transfer between droplets/particles and a gas phase plays an important role in the transport of numerous materials processing operations. These include rapid solidification operations such as ga

    Jan 1, 2004

  • TMS
    Separation Characteristics of Gas-Solid Flow in a U-Beam Separator using RSM Model

    By Jiang Fan, Wang Haigang

    "The three-dimensional complex multiphase turbulent flow in U-beam separators was simulated using the Reynolds stress equation models (RSM). To account for the effect of the stochastic characteristic

    Jan 1, 2004

  • SAIMM
    Monitoring And Control Of Furnace 1 Freeze Lining At Tasmanian Electro-Metallurgical Company

    By P. Dennis, T. Pieters, A. De Kievit, S. Ganguly

    TEMCO has been producing manganese ferroalloys in submerged arc electric furnaces for over 40 years. The furnace linings all along have been of conventional insulation type until 2001 when a freeze li

    Jan 1, 2004