Search Documents

Sort by

  • CIM
    Improved Pellet Reducibility by Closing Grinding Circuits with Hydro Classifiers at QCM?s Pellet Plant

    By Guy Chevalier

    QCM?s pellet plant, located in Port-Cartier, Quebec, produces up to 8.6 million tons of iron ore pellets annually. Four different types are produced: three for blast furnace operations and one for dir

    May 1, 2003

  • CIM
    Stereo Images for Object Detection in Surface Mine Safety Applications

    By John Steele

    The goal of this project is to detect the presence of objects behind haul trucks and to provide an alarm to the driver if such objects are detected. Objects of interest include people, pickups, other

    May 1, 2003

  • CIM
    Autonomous Tramming System for Open Pit Drilling Platforms

    By V. Polotski

    This paper describes a platform for autonomous operations in open pit mining environments. A typical operation consists of: (1) Initial locomotion toward a remote worksite; (2) Pattern navigation with

    May 1, 2003

  • CIM
    Diamond Data from Plant Floor to Office

    By Peter Heine

    Diavik Diamond Mines Inc. (DDMI) has treated systems development as an integral part of the construction project when it built Canada?s second diamond mine. Fully aware that the proper collection and

    May 1, 2003

  • CIM
    Measurement of Environmental Performance of Mining Firms ? Technical Approaches and Strategic Implications

    By Knud Sinding

    Mining firms are widely criticised for their adverse impacts on the environment. At the same time many firms in the industry devote extensive resources, both financial and managerial, to the reduction

    May 1, 2003

  • CIM
    Vector Neutral Truck: A 10% Improvement to the Haulage Cycle

    By Michael Stuart Parsons

    The haulage cycle is the sequence which a haulage vehicle must first arrive at the loading area, then turn around and reverse into position. Once it is loaded, the vehicle leaves and travels to the un

    May 1, 2003

  • CIM
    Effects of Blasting on Damage and Grindability of Impacted Rock

    A series of small scale tests have been conducted to evaluate the effect of micro-fracture development, imposed by blasting, on the material properties of the rock as well as its resistance to crushin

    May 1, 2003

  • CIM
    Atlas Copco drill rigs for Mine Automation and Communication - A totally new technology platform for advanced mining systems

    By Mikael Ramström

    In 2002 Atlas Copco Rock Drills AB released the new RCS technology for all of its drill rig types. RCS opened the way for a new generation of computerized drill rigs based on modern, standard PC-compu

    May 1, 2003

  • CIM
    Experiences with the Application of Large Variable Frequency Drives to Slurry Pumping

    By Kent Zehr

    Suncor Energy Inc. is an integrated producer and refiner of oil and gas headquartered in Calgary, Alberta. The bulk of revenue comes from the Oil Sands Group (OSG) operating in the McMurray formation

    May 1, 2003

  • CIM
    Changes to drill pattern and adequate inter-row delay time improve blasting performance

    By P. H. Oliver

    The current theory of how explosives fracture rock offers no explanation for the improvements in fragmentation and the reduction of fly rock and back break which occurs when an adequate inter-row dela

    May 1, 2003

  • CIM
    Drill-to-Mill: Efficient Drilling and Blasting Resulting in Increased Mill Throughput at Barrick Goldstrike

    By Mark Rantapaa

    Measurable improvements in throughput have been documented at Barrick Goldstrike due to increased ore fragmentation through efficient drilling and blasting techniques. A decrease in throughput at th

    May 1, 2003

  • CIM
    An International Review of the Use and Testing of the Wire Ropes used in Mine Hoisting

    By John E. Udd

    In early 2000, CANMET-MMSL was engaged by the Ontario Ministry of Labour (OMOL) to conduct an international study of the practices, in several key mining jurisdictions, of determining the criteria tha

    May 1, 2003

  • CIM
    Aur Resources Inc. Session Introduction (CIM 105th Annual General Meeting Montreal, May 5 - 7, 2003)

    By Robert Hamilton

    Aur Resources is Canada's leading copper mining company with producing mines and development projects in North, Central, and South America. Copper production from Louvicourt Mine in Quebec, Quebr

    May 1, 2003

  • CIM
    Closing the Loop Using Actual Concentrator Performance to Determine the True Value of Ore Sources

    By Adrian Dance

    The Antamina orebody is a geologically complex, polymetallic skarn located in the Peruvian Andes. A range of copper and copper-zinc ores are campaigned separately through the concentrator producing co

    May 1, 2003

  • CIM
    Applying Today's Global Technologies to Underground Communications Systems? Case Study: Designing A State-of-the-Art Mine Communications System

    By Charles Tkaczuk

    In order to remain competitive the mining industry must keep up with changes in technology. Many innovative technologies from the mining perspective are commonplace in other industries. A ?Global? rev

    May 1, 2003

  • CIM
    Risk Discounting: The Fundamental Difference between the Real Option and Discounted Cash Flow Project Valuation Methods

    By Michael Samis

    The real option valuation method is often presented as an alternative to the conventional discounted cash flow (DCF) approach because it is able to recognize additional project value due to the presen

    May 1, 2003

  • IIMP
    Structural openings and the localization of ore bodies

    By Eric Nelson

    The paper point out the structural openings and the localization of ore bodies. Structural openings in rocks constitute the primary permeability network for the formation of most hydrothermal ore de

    Apr 22, 2003

  • NIOSH
    Technology News - No. 504 - NIOSH Releases New AHSEM and ARBS Software Programs To Improve Ground Control

    It is now widely accepted that horizontal stress is present nearly everywhere underground. Often it is more severe than the vertical stress. It is a major cause of roof control problems in undergro

    Apr 1, 2003

  • CIM
    Considerations regarding the definition of remotely located integrated cogeneration plants. Part 2

    By D. Berkley

    The competitive pressure, the increasing energy costs and the environmental regulations impose substantial challenges to the definition of power plants serving industrial facilities. Primary mining an

    Mar 1, 2003

  • DFI
    Session 26 "Groutability and Grout Evaluation"

    By Peter Yen

    This session consists of five papers. Three involved research on the properties of grout materials, specifically ultrafine cements and polyurethane grouts. Two papers present the development of soil g

    Feb 10, 2003