Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Computer Modelling of Bench Blasting for Grade ControlBy Lindsay Wade, Peter Dare-Bryan
Benches in surface mines often contain known areas of ore and known areas of waste, which must be mined selectively. When rock is blasted it not only fragments but is also physically, and non-uniforml
Jan 1, 2001
-
In Situ Soil Mixing Concepts Explained; Myths Dispelled - What Is Soil Mixing?By Richard W. Hanford
The geotechnical construction industry generally considers soil mixing to be defined as an in situ ground improvement or treatment method by which a dry or wet reagent is introduced into the ground an
Jan 1, 2001
-
Computer Heat Transfer Model for Directionally Solidified CastingsBy Deming Wang, R. A. Overfelt
"This paper presents a computer-aided heat transfer simulation method to predict the thermal characteristics of an alloy sample in a special furnace for directional solidification. A two-dimensional t
Jan 1, 2001
-
A Fully Integrated Approach to Mine Planning for Proposed Mineral Sand ProjectsThis paper examines the complex interplay of deposit characteristics, mining plans, tailings disposal techniques and rehabilitation requirements on planning for mineral sands operations. All component
Jan 1, 2001
-
Monitoring Method of the Condition of Slag-Cleaning Furnace in Mitsubishi ProcessBy Akira Kaneda
Mitsubishi continuous process employs an electric furnace for settling matte from slag. Electrodes are immersed into the slag layer in the slag-cleaning furnace and the temperature of the melt is main
Jan 1, 2001
-
Computational Modeling of Heat Mass and Solute Transport in Directional Solidification ProcessesBy M. El Ganaoui, P. Bontoux
"A computational model to investigate solid/liquid phase change transitions for binary alloy under directional solidification is presented. Conservation equations are developed by using an homogeneous
Jan 1, 2001
-
New Concepts in Mine Backfill TrainingBy James F. Archibald, Ferri Hassani, Jacques Nantel, David O. DeGagné
Operators depend upon the success of backfilling programs to ensure that mine activities run continuously (Archibald et al, 1993) where backfilling is an integral part of the mining cycle. In order to
Jan 1, 2001
-
Methods for Approximating Discontinuous or Rapidly Changing Conductivity in Numerical Calculations.By Vaughan R. Voller
"Numerical methods for dealing with a temperature dependent conductivity are discussed. An approach based on a local application of a Kirchhoff transformation at the discrete level is presented. The a
Jan 1, 2001
-
Model for Calculating the Lankford Value in Sheet SteelsBy C. Isaac Garcia, Sihai Jiao, Anthony J. DeArdo
"A practical model based on the Hill analysis has been developed to calculate the Lankford value of interstitial free (IF) steels and its distribution in different rolling directions, by considering o
Jan 1, 2001
-
Commissioning Under a Microscope ù The Cawse Nickel Start-UpBy R Young, D OÆSullivan
When Centaur Mining and Exploration produced nickel metal fromlaterite ore at its Cawse nickel project in January 1999, a new era in the nickel industry was heralded in. One of three new laterite proj
Jan 1, 2001
-
Ore Treatment at Martha Current Operations and Future DirectionsThe treatment plant at Martha Mine was upgraded from a nominal throughput of 110tph (O.93mtpa) to 150tph (1.25mtpa) late 1999. Post-upgrade performance did not meet expectations when treating either t
Jan 1, 2001
-
Fundamental Studies of the Removal of Tramp Elements from SteelBy Luben Savov
This paper presents recent research works on the removal of the tramp elements Cu, Sn, Zn and Pb from steel. The evaporation of Cu and Sn in iron-based melts treated at reduced pressure of the gas pha
Jan 1, 2001
-
Designing The UFOceanic AUV For Cost-Effective Mineral ProspectingBy David M. Holmes-Smith
Many attempts have been made to design and build an AUV that is small, meets the sensing objectives and is cost effective. Many inventors have already designed smaller vehicles but the problem observ
Jan 1, 2001
-
Exploratory Study into the Effects of Electropulsing on the Flow Stress and Ductility of Steel Wire as Related to Wire DrawingBy Di Yang
The influence of high density (104 -105 A/cm2) electric current pulses (70 us duration) and continuous DC (~103 A/cm2) on the flow stress and ductility in tension of a high carbon steel wire were dete
Jan 1, 2001
-
Optimum Blasting? Is it Minimum Cost Per Broken Rock or Maximum Value Per Broken Rock?In most mining operations the ore undergoes several processes such as drilling, blasting, loading, hauling, crushing, grinding and liberation to become the final salable product. Drilling and blasting
Jan 1, 2001
-
Aspects of mining R&D in Australia (765b26a3-c30d-4d4d-843b-4cdffd30f3eb)"The Cooperative Research Centre for Mining Technology and Equipment (CMTE) is funded by the Commonwealth Government, by its mining research members — the Universities of Queensland and Sydney and the
Jan 1, 2001
-
On-line Moisture Determination of Ore Concentrates ‘Review of Traditional Methods and Introduction of a Novel Solution’By Phillip Cancilla, Daniel Roy, Frank Rosenblum
"The manual moisture determination methods employed today by mineral processing plants falls short in providing timely information required for automation control. The costs associated with transporti
Jan 1, 2001
-
Pastefill Transportation Techniques and Predictive RheologyBy Andrew T. MacKenzie, Paul A. Rantala
Predictive pastefill rheology (flow characteristic), models have long challenged pastefill practitioners. While the methodology and practicality of recipe formulation is attainable in most locals, the
Jan 1, 2001
-
ANFO’S Behavior in Height-To-Detonation and other Thermal Stimulus TestsBy E. Contestabile, B. von Rosen, P. Lightfoot
As part of an accident investigation ANFO was subjected to various abusive tests. A tractor-trailer carrying 18,000 kg of blasting explosives, caught fire, burned for approximately 30 minutes, and the
Jan 1, 2001
-
Production and Recycle of DustBy W. G. Davenport
The offgas from flash furnaces inadvertently contains dust. The dust contains 25 to 30% Cu so it must be treated for Cu recovery. This is almost always done by recycling it back through the flash furn
Jan 1, 2001