Search Documents

Sort by

  • NIOSH
    Reducing Exposures to Respirable Coal Mine Dust: Engineering Solutions

    By R. V. Ramani

    "In this paper, the current status of respirable dust control in coal mine atmospheres is presented. The advancements in the engineering control of dust generation and entrainment, and of reducing the

    Jan 1, 1998

  • AUSIMM
    Minimising the Total Cost of Horizontal Development with Burn Cut Blast Rounds

    The total cost of horizontal development can be minimised by optimising the cost of each of the component operations (eg drilling, blasting, etc). Component costs should not be minimised. To optimise

    Jan 1, 1998

  • CIM
    A review of INCO’s mining automation efforts in the Sudbury Basin

    By P. V. Golde, R. A. Poole, G. R. Baiden

    "INCO is committed to proceed into the next century using automation and robotics to achieve safety and productivity goals necessary to enhance its competitive position. Stobie Mine, decades old, is t

    Jan 1, 1998

  • TMS
    Computer Aided Optimization Of Furnace Design And Operating Condition Of Mitsubishi Continuous Copper Converter

    By Susumu Okabe

    Mitsubishi Continuous Copper Converter employs the top blowing lance system for the continuous supply of reaction gases into the molten bath. In order to avoid the excessive refractory wear caused by

    Jan 1, 1998

  • SME
    Increase Your Plant Recovery: More Efficient Spiral Circuits (e60b9228-f61c-4ef0-be1a-7020d584deeb)

    By T. A. Toney

    With new lightweight designs, spirals have become standard equipment in coal preparation plants worldwide. To their credit, spirals typically show very low coal losses to the refuse stream under most

    Jan 1, 1998

  • SME
    Evolution Of Mining Equipment Operations In The Wyoming Powder River Basin

    By K. R. Miller

    In recent years, surface mine equipment operators in the Campbell County region of the Wyoming Powder River Basin have found new ways to solve old problems. This paper will examine overburden strippin

    Jan 1, 1998

  • AUSIMM
    Underground Mines of Tomorrow

    By P Hatherly, H Gurgenci

    With the depletion of the mineral reserves that can be mined by surface mining, demand for highly productive and safe underground mines will increase. Underground drill and blast techniques continue t

    Jan 1, 1998

  • TMS
    Solvent Extraction in the Phosphate Fertilizer Industry

    By Fathi Habashi

    The recovery of uranium from wet process phosphoric acid was applied on industrial scale in the 1940's by using octylpyrophosphoric acid as an extractant. Later, more efficient reagents were used

    Jan 1, 1998

  • CIM
    Computer assisted economic analysis to select a stoping method

    By R. R. Tatiya

    "The ultimate aim of a mine design is to determine the development work involved and resources required by adopting one or more specific alternatives. A part of the process is the production of mining

    Jan 1, 1998

  • SME
    Leadville: A Look Back

    By Dave Southworth

    After Abe Lee discovered gold (in April 1860) near the site of present-day Leadville, Colorado, he and is group staked nearly all of California Gulch with "speculative claims." They did so in an eff

    Jan 1, 1998

  • AUSIMM
    The Preparation of Pastefill and Its Use at Some Canadian Mines

    Two key elements in the design of a pastefill or high density backfill system are the preparation of the backfill material and its distribution underground. This paper examines these two areas. Owing

    Jan 1, 1998

  • SME
    Modeling Of Energy Parameters ERR And TESR Around Burst-Prone Mine Openings (d2e3e893-4cc8-4270-b970-c3e7ebca9917)

    Strainburst phenomena, generally characterized by a sudden release of energy in a volume of highly stressed rock, are often encountered in such situations like crown pillar bursts in cut-and-fill mini

    Jan 1, 1998

  • TMS
    Process Improvements At The Phelps Dodge Chino Smelter

    By M. J. King

    The Chino Smelter embarked on a program to reduce smelter emissions. Fugitive sulfur dioxide and particulate emissions were reduced by (i) removing the flash furnace settling chamber and (ii) installi

    Jan 1, 1998

  • NIOSH
    Isokinetic Strength - Theory And Description Of Isokinetic Strength Measurement

    The concept of isokinetic measurement of strength was originally related by Hislop and Perrine.(1)Characteristics of an isokinetic exertion are constant velocity throughout a predetermined range of mo

    Jan 1, 1998

  • SME
    Evaluation Of The Face Ventilation Systems For Extended Cuts With Remotely Operated Mining Machines Using Three-Dimensional Numerical Simulations

    The purpose of this paper is to demonstrate how the Computational Fluid Dynamics (CFD) technique can be an attractive approach to evaluate the performance of face ventilation systems. To present the c

    Jan 1, 1998

  • CIM
    A Review of ISL Mining at the Highland Uranium Project

    By Laurence McGonagle

    "The Highland Uranium Project (HUP) is located approximately sixty miles northeast of Casper, Wyoming and is owned and operated by Power Resources, Inc. (PRI). With an annual production of680 tonnes (

    Jan 1, 1998

  • CIM
    The behaviour of zinc, cadmium, thallium, tin and selenium during ferrihydrite precipitation from sulphate media

    By J. E. Dutrizac, J. M. Zinck

    Ferrihydrite is often the initial precipitate resulting from the rapid neutralization of Fe(III) sulphate solutions, and it seems to be a major constituent of zinc plant neutral leach residues. The mo

    Jan 1, 1998

  • TMS
    Hydrogen Microprint Technique Applied to Observe Impurity Hydrogen in Aluminum during Deformation

    By Akihide Nagao

    The behavior of impurity hydrogen that is contained in starting material or picked up during processing has been little investigated up to now. The hydrogen microprint technique is applied to determin

    Jan 1, 1998

  • ISEE
    Evaluation of Safety in Pre-Loading Emulsion Explosives at Sulfide Mine

    By Zhang Shixun, Wang Xuguang, Wang Guoli

    A massive millisecond blast at an open-pit mine of large scale can be realized by using the blasting technology of pre-loaded explosives, which can enlarge production scale, reduce the frequency of bl

    Jan 1, 1998

  • AUSIMM
    Risk Management for Design and Mine Contracting at Lady Loretta

    By R J. Everett

    The mining industry is beginning to adopt quality systems based on the requirements of International Standards for quality assurance, such as the ISO 9000 series. Indications from similar industries a

    Jan 1, 1998