    Increasing Capacity of Nickel Product at Niihama Nickel Refinery

    By H. Sato, Y. Sato, T. Ooishi, K. Sakamoto

    "Sumitomo Metal Mining Co., Ltd.(SMM)'s Niihama Nickel Refinery(NNR) produces high quality Nickel cathode, Cobaltcathode and other by-products using hydrometallurgical refining process called “MCLE”(M

    Jan 1, 2017

  • DFI
    Geotextile Encased Columns (GEC) as Pile-Similar Foundation Elements: Basics, Specifics, Case Studies

    By Marc Raithel, Sven Schröer, Lilma Schimmel, Dimiter Alexiew

    "The Geotextile Encased Columns (GEC) deep foundation system for embankments and dikes on soft soils was introduced some 20 years ago and is now considered State-of-the-art in Germany, Europe and, ste

    Jan 1, 2017

  • SME-ICGCM
    Development Process for a Greater Capacity Propsetter® System

    By Christopher J. Brown

    "Proper ground stability in gate roads has been a critical aspect of success in longwall mining. In particular, the tailgate has proven to be one of the more active mine areas that needs to be managed

    Jan 1, 2017

  • CIM
    Commercial Production of High Purity Nickel Cathode from Copper Refinery Bleed Stream

    By Ian Ewart, Trevor Bergfeldt, Gourab Satapathy, Ajay Patel

    "Conventional electrowinning (EW) of nickel from sulfate electrolytes is complicated by several factors including the requirement for a diaphragm cell to separate the anolyte and catholyte and the nee

    Jan 1, 2017

  • SME
    Holden Mine — Application of Jet Grouting to Improve Stability of a Tailings Embankment in a Narrow Mountain Valley

    By P. Crouse, J. Obermeyer

    "INTRODUCTION Site location and history The Holden Mine is a former underground copper mine that was developed and operated by the Howe Sound Mining Company (Howe Sound) from 1938 to 1957. The mine is

    Jan 1, 2017

  • DFI
    Case History: Innovative Load Test Program Optimizes Pile Capacity in Challenging Ground Conditions

    By Emad Farouz, Francis A. Abreu

    "This paper presents a case history of a successful construction-phase pile load test program that optimized the pile design in challenging ground conditions at the Great Neck Wastewater Treatment Pla

    Jan 1, 2017

  • DFI
    A Case History on Design, Construction, and Performance of Stone Column Ground Improvement beneath an MSE Embankment

    By Dominic Parmantier, Karen Dawson, Suthan Pooranampillai, Seungcheol Shin

    "This paper presents a case study of the deformation-based design, construction, and performance of stone column ground improvement (GI) beneath a mechanically stabilized earth (MSE) wall and bridge a

    Jan 1, 2017

  • DFI
    Diplomacy and Innovation: Octakong and the Hong Kong-Zhuhai-Macau Bridge Project

    By David White

    "When finished (projected completion in 2016) the Hong Kong-Zhuhai-Macau Bridge Project will comprise three cable-stayed span bridges and a 4.15 mile immersed tube tunnel - linking Hong Kong to Macau

    Jan 1, 2017

  • DFI
    Case History: Large Diameter Micropiles for the Highway 53 Relocation Project

    By Nathan W. Iverson, David S. Graham, Paul J. Axtell

    "The Highway 53 relocation project in Virginia, Minnesota, involves construction of a very tall bridge across a currently inactive iron ore mine pit. The inactive pit is partially flooded and serves a

    Jan 1, 2017

  • DFI
    Case Study: Large Diameter Helical Pile Foundation for High Voltage Transmission Towers in Soft Glacial Deposits

    By John Dunn, Matt Hawley, Kashif Butt, Nicholas Gura

    "This paper presents the results of a static load testing program completed on helical pile foundations for the replacement of high voltage transmission line tower structures. The foundations were par

    Jan 1, 2017

  • DFI
    Analytical Expression for Plastic Hinge Length in Extended Pile-shafts

    By M. Hesham El Naggar, Mehdi Heidari

    "Equivalent fixed-base cantilever model is a common approach for performance base seismic design of bridge structures supported by extended pile-shaft. In this method, global displacement ductility fa

    Jan 1, 2017

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Baum Station – A New Pile Driving and Drilling Navigation System

    By Dzianis Proshchanka, Yoshi Izumi, Koji Mitani, Ayuna Kitaura

    "A new pile driving and drilling navigation system has been developed. It utilizes the commonly used surveying total station, combined with an innovative reticle. Conventional crosshairs have been rep

    Jan 1, 2017

  • DFI
    Bearing Capacity of Semi-Deep Skirted Foundations

    By Abolfazl Eslami, Samieh Rezazadeh

    "Semi-Deep skirted foundations are considered to be a viable option for a variety of onshore and offshore applications. It is necessary to determine appropriate foundation configurations that allow lo

    Jan 1, 2017

  • DFI
    Challenges in Managing an Aging Infrastructure, Lessons Learned from a Near Miss at the Lake Manatee Dam

    By Glen R. Andersen

    "Two of the greatest challenges we face in managing our aging infrastructure are to perform accurate condition assessments and to realistically predict the risk of non-action. The aim of this paper is

    Jan 1, 2017

  • DFI
    Charleroi Locks: Repair Methods to Restore Structural Integrity of Large-Diameter Drilled Shafts

    By Alexandre Alex) J. Bredikhin

    "DISCLAIMER: the statements presented herein are those of the author and do not necessarily represent the views of US DoD or its Components.ABSTRACTProgress on the $750M lock project on the Monongahel

    Jan 1, 2017

  • DFI
    Cased Auger Piles (CAP): An Effective Piling Solution (With CAP Technique)

    By Federico Pagliacci

    Continuous Flight Auger (CFA) technique represents an important technological advance in the construction of piles in soft soils. The possibility of excavation under the water table with no need for d

    Jan 1, 2017

  • DFI
    Interpretation of Seismic Response Data from Full Scale Helical Pile Tests

    By A. B. Cerato, M. K. ElSawy, A. Elgamal

    "Helical piles are gaining popularity as foundations for new construction as well as retrofitting option for deficient foundations. More recently, large diameter helical piles are used to support stru

    Jan 1, 2017

  • DFI
    Driving and Extraction of Steel Pipe Piles in Nearshore Environment

    By Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez

    "A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br

    Jan 1, 2017

  • CIM
    Agnico Eagle Laronde Plant: Metallurgical Challenges Present and Future (CIM Journal | Vol. 8, No.1, 2017)

    By J. Cayouette, C. Bolduc, P. Blatter

    "The LaRonde mill was commissioned in 1988 and began treating ore from the Penna shaft in 2000. The mill has been expanded to accommodate 7,500 t/day, but ramped down to 6,000 t/day since the deep ext