Search Documents

Sort by

  • CIM
    Stability Assessment of Rock Slopes: Towards an Inverse-Reliability-Based Methodology

    By Xiang Li, Xibing Li

    It is paramount that the stability of rock slopes be correctly accounted for under diverse operating and environmental conditions. Owing to different sources of uncertainty entailed in such stability

    Jan 1, 2015

  • CIM
    Project Development

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The business objectives of a metallurgical project determine targets and constraints, such as the range of products, production capacities, in-service dates, and capital and operating cost parameters.

    Jan 1, 2015

  • SAIMM
    Positive Risk Management: Hidden Wealth in Surface Mining

    By J. A. Luckmann

    "SynopsisThe purpose of this paper is to introduce an innovative approach to risk management in surface mining operations, namely, positive risk. Traditionally, risk management focused on mitigating l

    Jan 1, 2015

  • SAIMM
    Sprayed Concrete for Underground Excavations — A Status Report

    By B. C. Viljoen

    "SynopsisCommencement of the next phase of the Lesotho Highlands Water Project is a year or so away from becoming reality. Some 50 km of tunnels in the form of access adits, shafts, diversion tunnels,

    Jan 1, 2015

  • SME
    Solving Mine Drainage Water Issues with Peat-Based Sorption Media

    By P. Eger, D. Green

    "The Soudan Mine was Minnesota’s first iron mine, operating from 1882 to 1962. The mine was donated to the State of Minnesota in 1963 and became a state park in 1965. The mine discharge contains eleva

    Jan 1, 2015

  • CIM
    Variability of In Situ Stress: The Effect of Correlation between Stress Tensor Components

    By J. P. Harrison, K. Gao

    It is well known that in situ stress measurements at a given site will generally display significant variability. However, it appears that a robust analysis of such measurements – i.e., one that is fa

    Jan 1, 2015

  • SME-ICGCM
    Estimating Rock Mechanics Parameters through Shear Wave Analysis with Well Cad

    By William R. Kohl, Craig B. Clemmens

    "Since 2010, North Central Resources, Bridgeport, WV, has been using the sonic log to estimate the rockmechanics properties of the coal and adjacent strata in their exploration drilling program. In 68

    Jan 1, 2015

  • CIM
    Hydrometallurgical Recovery of Zinc, Manganese and Lead from Pyrometallurgy Sludge

    By J. -F. Blais, M. -O. Simonnot, J. Mocellin, G. Mercier, J. -L. Morel

    Large quantities of ferromanganese sludge are generated as waste material by blast furnace during the manufacturing of ferromanganese. These slags are very rich in manganese, zinc and lead (5 to 40 %)

    Jan 1, 2015

  • SME-ICGCM
    Laboratory Studies on Creep Behavior of Grouted Tensioned Rebar in Weak Strata

    By Joseph Hirschi, Naga S. Y. Tirumalaraju, Aditya Mishra, Anthony (Sam) J. S. Spearing

    "Primary roof support in underground coal mines in the USA consists mostly of fully grouted passive rebar or grouted (partially or fully) tensioned rebar. Research conducted at two room-and pillar coa

    Jan 1, 2015

  • CIM
    Application of Response Surface Methodology to Model Dependence of Strength and Deformabilty of Limestone Rock on Intact Specimens Shape Deviations

    By P. Mišcevic, B. Kavur, I. Vrkljan, N. Štambuk Cvitanovic

    It is known from earlier and recent research that mechanical properties of intact rock like uniaxial compressive strength (UCS), Young's modulus (E) and Poisson's ratio (?) are influenced by shape dev

    Jan 1, 2015

  • CIM
    Development of Hydraulic Fracturing Technology for Hard Roof Weakening in Chinese Coal Mines

    By H. P. Kang, Y. J. Feng

    The hard roof in underground coal mines is generally considered as a main cause that induces disasters in working faces and entries, such as rock burst and windblast. Hydraulic fracturing technology i

    Jan 1, 2015

  • SME-ICGCM
    An Approach to Predict Rock Mass Deformations in Three Dimensions for a Part of an Open Pit Mine and Comparison with Field Deformation Monitoring Data

    By Pinnaduwa H. S. W. Kulatilake, Biao Shu

    The intact rock properties and discontinuity properties for both Devonian Rodeo Creek (DRC) and Devonian Papovich (DP) rock formations that exist in the selected open-pit mine were determined from tes

    Jan 1, 2015

  • CIM
    Evaluation of Groundwater Leakage into a Dam Foundation Drainage Tunnel

    By J. M. Hong, H. K. Zheng, R. Hu, C. B. Zhou

    The Jinping-I double curvature arch dam, located in the middle reach of the Yalong River and with a maximum height of 305 m, is the world highest dam of the same type that has been completed. Since th

    Jan 1, 2015

  • SME
    Sustainable Mining in a Buddhist Country: The Case of Thailand

    By J. Kretschmann, K. Sakamornsnguan

    "Sustainable development is an influential ethical concept in modern mining management. However, the concept is not culturally neutral because it is based on Christian, Western values. These values ca

    Jan 1, 2015

  • DFI
    Characteristics of Strength Development of Fiber-Reinforced and Cement Improved Soft Clay of Shanghai

    By Mu Chen, Ye-Shuang Xu, Dong-Wei Hou, Shui-Long Shen, Huai-Na Wu

    "This paper presents a laboratory investigation on the mechanical behaviors of the cement-clay admixture improved by polypropylene fiber. Cement can significantly improve the clay admixture. The fiber

    Jan 1, 2015

  • SAIMM
    Re-aligning the cutting sequence with general support work and drafting a support sequence at Simunye Shaft

    By K. Lombard

    "‘Roof support awaiting time’ (RSAT) is a term used at Goedehoop Colliery’s Simunye Shaft to describe the potential production time lost due to the continuous miner (CM) standing idle waiting for roof

    Jan 1, 2015

  • SAIMM
    Observed Spatial and Temporal Behaviour of Seismic Rock Mass Response to Blasting

    By K. Woodward

    "SynopsisSeismically active mines generally experience an increase in seismic hazard due to rock mass instability following blasting. Re-entry protocols commonly include measures to limit the spatial

    Jan 1, 2015

  • DFI
    Load-Deformation Based Design of Deep Mixing for Supporting MSE Walls at Kitimat LNG, BC

    By Randy R. Williams, Brian W. Wilson, George M. Filz, Marina S. W. Li

    "Detailed design of an extensive deep mixing (DM) scheme using the Cutter Soil Mixing (CSM) technique was completed for foundation support of mechanically stabilized earth (MSE) walls for Kitimat Liqu

    Jan 1, 2015

  • SME-ICGCM
    Characterization of Tensile and Shear Loading on Smooth and Indented Wires and PC–strand Cable Bolts

    By Steven Derycke, Stephen C. Tadolini, Anand Bhagwat

    "The tensile and shear strength of intrinsic bolting support systems has always been a major concern of designers. A comprehensive laboratory testing program was designed to evaluate the tensile and s

    Jan 1, 2015

  • CIM
    Sustainability in Plant Design

    By Ben C. McLellan, Philip J. Bangerter, Andrew Murphy, Glen D. Corder, Damien Giurco

    Sustainability now forms a critical part of metallurgical plant design. In addition to compliance with requirements and corporate principles, design engineers must also consider how community and soci

    Jan 1, 2015