Search Documents

Sort by

  • SME
    Site-specific blasting model for mine-to-mill optimization - SME Transactions 2011

    By J. Kemeny, K. M. Kim

    A site-specific blasting model has been developed for the Asarco Mission mine. The main inputs to the model are the in situ block size (F80), the post-blast fragmentation (P80) and the intact tensile

    Jan 1, 2011

  • SME
    Investigation of subsidence events over inactive room-and-pillar mines - SME Transactions 2011

    By Yi Luo

    Subsidence events occurring above inactive room-and-pillar (R&P) mines, including abandoned mines or sealed portions of active mines, are classified as unplanned subsidence, because of their timing an

    Jan 1, 2011

  • AUSIMM
    Production Capacity Optimisation in the Presence of Grade Uncertainty

    Grade uncertainty can have a number of important implications for a mining operation. One of the most significant risks in not considering grade uncertainty in planning is the over or under allocation

    Dec 6, 2010

  • AUSIMM
    Never Touch a Running System - Longwall Cutting Sequences and their Potential

    The optimisation and validation of shearer cutting methods is a time consuming engineering task. Many different parameters, of which not all can be controlled, can vary. The easiest solution, to incre

    Dec 6, 2010

  • AUSIMM
    Enterprise Optimisation

    Enterprise Optimisation is a methodology for increasing the value of mining and mineral processing operations through better long-term planning decisions. It involves a combination of ten mechanisms w

    Dec 6, 2010

  • AUSIMM
    A Simulation Approach for the Comparison of In-Pit Crushing and Conveying and Truck-Shovel Mining Methods

    In-pit crushing and conveying (IPCC) is being increasingly considered as an alternative to traditional truck-shovel mining methods. The move towards IPCC is driven by a number of factors including the

    Dec 6, 2010

  • AUSIMM
    Fundamental Study on Fracturing Grouting for Shaft Lining Reinforcement at Deep Alluvium Seam in Eastern China

    Many problems result when coal mine shafts are built in complicated geological conditions and serious shaft lining ruptures have often occurred in the eastern part of China since 1987. Grouting is app

    Dec 6, 2010

  • AUSIMM
    Equipment Selection - What is the Issue? What About the Application of Simulation Packages?

    The selection of the mining fleet can have as much of an effect on the efficiency and effectiveness of an operation as the mining method. This is not to say that inefficiencies are only attributable t

    Dec 6, 2010

  • AUSIMM
    Determination of Fracture Toughness of Anisotropic Rocks Under Water Vapour Pressure by Semi-Circular Bend Test

    Failure of rock materials is a process of crack propagation. Crack initiation takes place when the crack tip stress intensity K reaches a critical value called fracture toughness, K1C. The rock fractu

    Dec 6, 2010

  • AUSIMM
    A Comparison of Rebar and Spiral Bolts using Laboratory Pull-Out Tests

    This study is to compare reinforcement of rebar and spiral bolts using laboratory pull-out test. For this purpose, the pull-out test was performed in laboratory for a curing period of 7- and 28-days.

    Dec 6, 2010

  • AUSIMM
    Advances in Continuous Miner Automation

    This paper describes new research and development currently being undertaken by the CSIRO Mining Technology Group to advance the automation capability of continuous mining equipment in underground coa

    Dec 6, 2010

  • AUSIMM
    Adaptation of Hydraulic Shovels for Arctic Temperature of Yakutia Region

    Hydraulic mining shovels can be successively used at open-pit mining operation in severe climatic zone with air temperature interval from -700C to +450C typical for some northern region of the world p

    Dec 6, 2010

  • AUSIMM
    Optimisation Challenges in Underground Mine Planning and Design

    Underground mine planning is characterised by a series of designs, starting with prefeasibility and culminating in operational. Information on the mineralisation and geotechnical conditions is availab

    Dec 6, 2010

  • AUSIMM
    Infrared Imager as a Tool for Monitoring of Power Shovels, Gearcase Bearings and Electric Motors

    Thermal method of diagnostic as a nondestructive monitoring is based on data logging of infrared radiation from heated surface or from the associated thermal field. Monitoring of gearcases and motors

    Dec 6, 2010

  • AUSIMM
    A Review of the Theory and Application of Multi-Criteria Decision Analysis Techniques in Mine Planning

    Mine planning includes equipment selection as a subprocess because aging equipment must be replaced to maintain or improve productivity levels. The criteria used for decision-making in mine planning a

    Dec 6, 2010

  • AUSIMM
    An Investigation to Integrate Optimum Long-Term Planning with Short Planning in Underground Mine Production Scheduling

    Generating short- and long-term mine production schedules in isolation and independently from each other means that only a local optimum can be achieved when each scheduling phase is carried out. The

    Dec 6, 2010

  • AUSIMM
    Precision Surface Mining - Choosing the Best Tool for the Job

    Precision surface mining is increasingly occupying a significant role in open pit mining. Improvements in technology now allow continuous surface mining of material well above 140 MPa (20 300 psi) eff

    Dec 6, 2010

  • AUSIMM
    She'll be Right Mate - Culture and Safety

    By N S Melkoumian

    While improvements in occupational health and safety (OHS) in the mining industry have decreased fatalities and accidents, little attention has been paid to the cultural confound of 'safety'

    Dec 6, 2010

  • SME
    NAT 2010 Full Proceedings - NAT2010

    By Bradford F. Townsend, Matthew E. Fowler, Michael F. Smithson, Lawrence R. Eckert

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2010

  • AUSIMM
    Managing the Transition from Low Stress to High Stress Conditions

    The transition from low stress to high stress conditions is a challenge eventually faced by most mines in Australia that extend to depths greater than (generally) about 1000 m. In areas with strongly

    Nov 25, 2010