Search Documents

Sort by

  • CIM
    Develop New Reductants for Inco Multi-Purpose Vessels

    By J. Lui

    At its Copper Cliff Smelter, bulk nickel and copper concentrate is processed in two Inca flash furnaces and Peirce Smith converters to produce Bessemer matte containing 0.6%Fe. After slow cooling and

    Jan 1, 2007

  • CIM
    Changes in the Converter Slag Chemistry Due to the Southern Peru Ilo Smelter Modernization

    By J. Suarez Condezo, E. Herrera Alarcon

    The Ilo Smelter Modernization Project will require treating the slag from the Peirce Smith converters in Slag Cleaning Furnaces using pig iron technology. Currently the slags from the converters show

    Jan 1, 2007

  • AUSIMM
    Case Study - Total Life Cycle Planning for a Greenfield Site

    Central to any business is its Asset Management Plan which encapsulates the business context and key organisational objectives such as profitability, safety and environmental standards. Life Cycle Pl

    Jan 1, 2007

  • CIM
    Management Of Contaminated Soil And Groundwater: A Perspective For The Chilean Copper Industry

    By A. Bezama

    For over a decade European countries have addressed contaminated sites by developing technologies for managing both polluted soil and groundwater. This development has not only been driven by health a

    Jan 1, 2007

  • CIM
    Numerical Information System Supporting Safe Management Of Copper Post-Flotation Tailings Pond "Elazny Most", Poland

    By W. Swidzinski

    "Zelazny Most" post-flotation copper mine tailings pond is the only place to of storeing wastes for KGHM POLSKA MI EDZ S.A. The flotation tailings is are the main waste stream in copper mining in Pola

    Jan 1, 2007

  • CIM
    Leaching of Bulk Flotation Concentrate as an Alternative to Treat a Complex Sulfide Ore

    By C. A. Sosa-Blanco

    Minera Sabinas in central Mexico treats a complex sulfide ore containing galena, chalcopyrite, sphalerite and argentite as valuable minerals, and in some cases important amounts of non-magnetic pyrrho

    Jan 1, 2007

  • CIM
    Liquidus Temperatures in Calcium Ferrite Slags Equilibrated with Molten Copper at fixed Oxygen Partial Pressures

    By S. Nikolic

    "Calcium ferrite slags are currently used in a number of copper-converting processes. Despite the industrial importance of this system the phase equilibria have not been fully investigated. Characteri

    Jan 1, 2007

  • SME
    Good Times at Arizona Conference Are Tempered With Concerns For the Future

    By William M. Gleason

    When SME’s 2006 Arizona Conference convened in December at the Hilton El Conquistador Resort in Tucson, AZ, there was considerable excitement among the 387 attendees. There was a noticeable buzz s

    Jan 1, 2007

  • CIM
    Integrated Grinding and Flotation Simulations for the Improvement of Circuit Performance at BHP-Billiton’s Minera Escondida

    By H. E. Urtubia, C. W. Bailey

    "BHP-Billiton’s Minera Escondida Limitada is one of the world’s largest copper producers. It treats a combined 88 million tons of copper ore per year through its two concentrators: Los Colorados and L

    Jan 1, 2007

  • CIM
    Mucking efficiency in open pit blasting

    By J. J. Montoro

    The influence of blasting on the excavators’ efficiency, defined as mucking rate (amount of rock mucked per unit time) and mean bucket load (amount of rock loaded in each bucket operation), is investi

    Jan 1, 2007

  • CIM
    Matching Theory and Practice in Heap Leaching Processes

    By J. M. Menacho

    As usually occurs in technological development, heap leaching knowledge has been built upon two parallel lanes, theory developed on fundamentals but relatively far from industrial applications, and op

    Jan 1, 2007

  • SAIMM
    Development Of A Process For Dephosphorisation Of High Carbon Ferromanganese

    By R. P. Goel, P. N. Chaudhary, R. K. Minj

    The bulk of high carbon ferromanganese produced in India continue to have more than 0.35% phosphorus since they are produced by carbothermic reduction process. The low phosphorus manganese ores are de

    Jan 1, 2007

  • CIM
    Optimization Of Refractory Lining Design And Installation Practice To Reduce Vessel Downtime And Maximize Performance Of Anode Refining Vessels

    By A. J. Rigby

    Anode vessels are often relined with refractory every one to two years and a typical reline time can take between 16-20 days. Modem refractory designs using dense, corrosion resistant brick applied di

    Jan 1, 2007

  • CIM
    The Metallurgical Sulfuric Acid Plant Design, Operating & Materials Considerations 2007 Update

    By L. J. Friedman

    The recovery of sulfur dioxide from metallurgical gases for the production of sulfuric acid has been the primary means of reducing sulfur dioxide emissions from nonferrous smelters. Sulfuric acid has

    Jan 1, 2007

  • CIM
    Factors affecting adhesive strength of different thin spray-on liners

    By D. D. Tannant, H. Ozturk

    Thin spray-on liners are increasingly being used as rock support in underground mines. The adhesive strength between the liner and the rock surface is an important design parameter. Adhesion tests wer

    Jan 1, 2007

  • AUSIMM
    Grade Control at the Yandi Iron Ore Mine, Pilbara Region, Western Australia ù Comparative Study of the Blastholes and Reverse Circulation Holes Sampling

    By B Menzel, M Wlasenko, J Phillips

    Yandicoogina (Yandi) open pit mine is located in the eastern part of the Pilbara region of Western Australia. It hosts pisolitic iron-oxide mineralisation distributed within a meandering paleoriver ch

    Jan 1, 2007

  • CIM
    Daily Production Planning Efforts at Phelps Dodge Miami Smelter

    By V. Ushakov, P. Bogdan

    Daily production scheduling in a highly dynamic smelter environment has always been a great challenge for the operation management due to a significant amount of uncertainties. Planned and unexpected

    Jan 1, 2007

  • CIM
    Operational Strategy At Chagres Smelter, Maximizing Installed Capacity

    By R. Bonifaz

    The Chagres Smelter, part of the Anglo American plc group situated 80 Km north of Santiago in Chile, completed a series of operational improvement in 2005 resulting in an optimum capacity in its opera

    Jan 1, 2007

  • AUSIMM
    Argyle Diamonds - Closing a Large Open Pit During a Mining Boom

    The Argyle AK1 Pit has been operating and producing over 25 per cent of the worldÆs diamonds by volume for over 20 years. The mining boom in Western Australia is creating upward cost pressures to Argy

    Jan 1, 2007

  • NIOSH
    Administrative controls for reducing worker noise exposures

    By E. R. Bauer

    Noise-induced hearing loss (NIHL) continues to be a concern of the mining industry. A new noise standard (30 CFR, Part 62) is aimed at reducing NIHL in mining through engineering and administrative no

    Jan 1, 2007