Search Documents

Sort by

  • DFI
    Load Transfer And Capacity Of Drilled Shafts With Full-Depth Casing

    By Rolf Katzenbach

    Construction of drilled shaft foundations with the use of hydraulic oscillators and rotators to install temporary casing over the full depth of the shaft is described. The equipment and techniques we

    Jan 1, 2007

  • SME
    Technology News – Improved Separating Technology Gives Zemex Plant 50 Percent Improvement

    When it comes to processing industries, speed matters. More precisely, the faster/greater the throughput of finished product out the door, the more quickly money can flow back into the corporate coff

    Jan 1, 2007

  • DFI
    Nailed It! The Great Wall of the Chinese Embassy

    By Fred Tarquinio, Giovanni Bonita, Lars Wagner

    "A new embassy for the Peoples Republic of China is under construction in Washington, DC. The 475,000 square feet (44,125 m2) structure has five levels below ground and four above, making it the large

    Jan 1, 2007

  • CIM
    El Mochito Mine – Latest Operational Improvements and Future Challenges in the Area of Mineral Processing

    By Renaud Adams, Vladimir Salatic

    "The El Mochito Mine located in Honduras, Central America, has produced lead, zinc and silver in concentrates since the 1950s. The paper discusses changes made in both lead and zinc circuits to reduce

    Jan 1, 2007

  • AUSIMM
    Sublevel Cave Propagation at Mount Marion Gold Mine

    By P Hucker, E Hall

    Harmony Gold operates the Mount Marion underground gold mine near Kalgoorlie, Western Australia. The mine consists of two ore zones, East and West, and mining of these zones is currently conducted usi

    Jan 1, 2007

  • SME
    The Madrid Renewal Inner Ring Calle 30 with the Largest EPB Machines—Planning and Results

    By Enrique Fernandez

    M-30, Madrid’s inner ring, covers 42 sq km of the city centre where one million people reside. It was constructed in several phases during the sixties and the eighties. The design criteria applied to

    Jan 1, 2007

  • CIM
    New technology for the abatement of SO2 in nonferrous pyrometallurgical processes by a dry limestone scrubber

    By F. Parada, R. Parra

    "The neutralization process of SO2 from coal burning plants is a well-defined technology using limestone to form CaSO4 according to the following reaction: CaCO3 + SO2(g) + 1/2O2(g) = CaSO4 This paper

    Jan 1, 2007

  • SME
    Permitting New Tunnels in Southern Ontario, Canada—Panacea, Pragmatism, and Professionalism

    By Adrian Coombs, Paul Magowan, Derek Zoldy

    Continued development and intensification are fuelling the urgent need for new trunk infrastructure within The Regional Municipality of York and throughout the Greater Toronto Area. Permitting of thes

    Jan 1, 2007

  • NIOSH
    Programmable electronic and hardwired emergency shutdown systems: A quantified safety analysis

    By John J. Sammarco

    Abstract- Emergency shutdown systems (ESDs) for mining machinery provide critical functions to safeguard miners. Traditionally, ESDs were realized with simple hardwired circuits; today, there is a gro

    Jan 1, 2007

  • AUSIMM
    The Geomorphology of the Channel Iron Deposit in Bungaroo Valley - The Formation of an Irregular Basal Topography and its Impacts on Resource Recovery

    By L Terrusi

    The Bungaroo Valley hosts a concealed Tertiary channel iron deposit (CID) along a 17 km stretch of its length. Bungaroo Valley is approximately 0.5 km wide upstream at its easternmost extent, and 3.5

    Jan 1, 2007

  • AUSIMM
    Assessment of Options for Economic Processing of Preg-Robbing Gold Ores

    By K Buda, W Staunton, M Hill, V Tjandrawan

    One of the challenges facing the gold industry in the 21st century is the continuing need to identify new reserves of economically treatable ores. Discoveries of large, metallurgically simple orebodie

    Jan 1, 2007

  • AUSIMM
    Alliance Type Contracts

    When it comes to structuring major mining contracts, the two most widely adopted formats are æmeasure and valueÆ and æcost-plusÆ. A problem with both of these formats is the difficultly of aligning th

    Jan 1, 2007

  • CIM
    Spheroidization of a medium carbon HSLA fastener-grade steel

    By P. P. Sinha, D. N. Bhatia, B. R. Ghosh, R. K. Gupta

    Medium carbon, low alloy, high-strength steels containing Ni, Cr, and Mo are used for the fabrication of various types of high-strength fasteners required for launch vehicle structures. Cold heading p

    Jan 1, 2007

  • DFI
    Piling Framed Tie Down Concrete Retaining Wall (4e2f4102-889f-44e0-a228-adb5cc7c450f)

    By Saieb Haddad, Henry Pate

    "Building retaining walls in an urban area is becoming more diffi cult due to right-of-way restraints. Using standard concrete cantilever walls requires a construction easement behind the walls for in

    Jan 1, 2007

  • CIM
    A new approach to waste dump site selection according to the fuzzy decision-making process

    By F. Samimi Namin

    During the process of developing surface or underground mines, some sites are considered for dumping of surface soils, while others are applied to reclaiming surface and waste disposal. For each kind

    Jan 1, 2007

  • AUSIMM
    Cyanide Measurement and Control for Complex Ores and Concentrates

    By J A. Rumball

    Measuring cyanide in the leach liquors associated with high copper and/or sulfide ores is a non-trivial exercise. It is well known that copper complexes with cyanide and reduces the amount of cyanide

    Jan 1, 2007

  • CIM
    Copper Roast Segregation Process: A Promise to be Fulfilled and a Challenge for Material Handling Technology

    By A. del Campo A.

    The roast segregation process, which was patented in 1974, makes use of a set of chemical reactions that are different from the traditional sequential oxidation of iron and copper sulfides used by all

    Jan 1, 2007

  • DFI
    Rehabilitation of U.S. 70 Bridge over Lake Hamilton (de2c0766-552c-4812-a9ab-394a9bebc445)

    By Ryan P. Sullivan, G. Alan Klevens, Jian Huang

    "BACKGROUNDLake Hamilton in Hot Springs, AR was created in 1932 when the Arkansas Power and Light Co. completed Carpenter Dam on the Ouachita River to generate electricity. Today, the 7,200-acre (2,91

    Jan 1, 2007

  • CIM
    Discrete-Event Simulation in the Primary Metals Industry using Simul8

    By K. H. Concannon, K. I. Hindle

    "The use of simulation modeling in the primary metals industry (including mining, smelting, and metals processing) is expanding as significant cost-benefits can be realized by companies employing capi

    Jan 1, 2007

  • CIM
    Study of Elemental Sulfur Formation in the Fluid Bed Dryer Baghouse

    By J. Lui

    Inco Copper Cliff Smelter commissioned two new Inco flash furnaces in 1991/1993 as part of its S02 abatement program. Each flash furnace is equipped with a fluid bed dryer. The ~ 12 wt% water content

    Jan 1, 2007