Search Documents

Sort by

  • CIM
    Hydrodynamic modelling of hydrometallurgical unit operations

    CSIRO Minerals, in association with the AJ Parker CRC for Hydrometallurgy, has an active program of hydrometallurgical research in which physical and computational modelling are used to better underst

    Jan 1, 2005

  • AUSIMM
    Long Shaft ù A Deep Level Mining Success Story

    By G McLeay, T Moran

    Long Shaft has traditionally been seen as one of the most challenging mines in the Kambalda area with operations having been suspended by the previous owners in 1999. When mining recommenced in Octobe

    Jan 1, 2005

  • CIM
    Deposition of porous cathodes using plasma spray technique for reduced-temperature SOFCs

    By J. Jankovic

    Numerous advantages have been recognized for solid oxide fuel cells (SOFCs) operating at temperatures of 500-700°C. However, there are several issues related to low temperature SOFCs, such as high ele

    Jan 1, 2005

  • CIM
    Microwave Reduction of Nickeliferous Silicate Laterite Ores

    By C. A. Pickles

    Microwaves are being applied industrially in a number of fields and possess a number of potential advantages that could be applied in extractive metallurgy. Microwave heating has a number of unique ch

    Jan 1, 2005

  • CIM
    Bringing fuel cell technology to market ? Bridging the gap from technical success in the laboratory to product success in the marketplace

    By A. Varma

    Successful technology commercialization occurs when a company is focused on creating shareholder value by providing a reliable product at a price point attractive to the market, while at the same time

    Jan 1, 2005

  • DFI
    Analytical and Field Estimates of Shaft Resistance in Socketed Piles: Bandra-Worli Sea Link, Mumbai

    By Sunil S. Basarkar, Dilip M. Dewaikar, Rajesh H. Gajjar

    "A load transfer program AXPILE was developed for simulation of the loadmovement characteristics of socketed piles of the Mumbai reg ion. This program used empirical relationships for ultimate shaft r

    Jan 1, 2005

  • CIM
    A fractal model for the aggregate density-size distributions generated during aggregation processes

    By M. J. Gagnon

    The agglomeration of particulate materials is used in many mineral processes to enhance the settling of the fine particles, Depending upon many physical and chemical parameters, the aggregates demonst

    Jan 1, 2005

  • SME
    On the Dynamics of Charge Motion in Grinding Mills

    By T. N. Patra, Sanjeeva Latchireddi, B. K. Mishra, Sravan K. Prathy

    The motion of grinding balls has been the subject of study since 191 9 when Davis published the first treatise on this subject. Subsequently came the notion that knowing mill power draft, using Bond e

    Jan 1, 2005

  • CIM
    Effect of Heat Treatment on the Corrosion Properties of Nanocrystalline Co-l.1 wt % P Alloys

    By H. Jung

    The microstructures and grain sizes of nanocrystalline Co and Co-1.1 wt % P alloys were characterized by X-ray diffraction. The corrosion properties of as-deposited and annealed Co-l.l wt % P alloys a

    Jan 1, 2005

  • CIM
    The Holy Grail - Predicting Localized Corrosion Damage from First Principles

    By D. D. Macdonald, G. Engelhardt

    The accumulation of damage due to localized corrosion [pitting, stress corrosion cracking (SCC), corrosion fatigue (CF), crevice corrosion (CC), and erosion-corrosion (EC)] in complex industrial syste

    Jan 1, 2005

  • CIM
    Fault diagnosis in metallurgical process systems with support vector machines

    Fault detection and identification are major challenges in process engineering and manufacturing and the key component of abnormal event management systems. Timely detection, diagnosis and rectificati

    Jan 1, 2005

  • AUSIMM
    Computer Simulations to Enable Continuous Blending to Two Plants at Sishen Mine From the Medium-Term Point of View

    Sishen uses a state-of-the-art tracking system to track material from its position in blast blocks through various stockpiles and crushers. Qualities are blended directly to the crusher as opposed to

    Jan 1, 2005

  • AUSIMM
    Conveyor Loading of Skips

    The basic methods to remove material from underground mines are to: convey continuously, batch in trucks, or batch in a shaft hoisting system. A critical aspect in shaft hoisting is accurately batch l

    Jan 1, 2005

  • DFI
    Underpinning Historic Museum for U-505 Submarine Relocation

    By Goudschaal Mark R.

    "The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This

    Jan 1, 2005

  • CIM
    Surface damage and phase fragmentation in Al-Si alloys during single pass scratch tests

    The fracture behavior of second phase particles and the role of matrix material on the wear resistances of the three Al-Si alloys containing 8, 17, and 19% Si were investigated using single pass scrat

    Jan 1, 2005

  • AUSIMM
    Statutory Compliance of Sealing Plans and Information Required by Queensland Industry Regulators

    Following the Moura No 2 Wardens Court of Inquiry and subsequent changes to the Queensland Mining Legislation there is a requirement in Queensland coal mines for: a person with the recognised competen

    Jan 1, 2005

  • AUSIMM
    Spraying the Surface or Just Scratching the Surface ù What Are the Real Benefits of In-Cycle Fibrecrete?

    Through the use of structural analysis programs such as Unwedge and considering the shear strength of applied fibrecrete it can be shown that fibrecrete can provide a higher factor of safety in a ætyp

    Jan 1, 2005

  • AUSIMM
    Mine Hoists for the Nickel Rim South Project

    By T Gartner

    This paper describes the design, manufacture and site services associated with the supply of mine hoists for the new mine under construction by Falconbridge Limited in Ontario, Canada. Two new shafts

    Jan 1, 2005

  • AUSIMM
    Commissioning ù The Interface Between Construction and Operations

    This paper outlines the role of commissioning in the project cycle, shows how to get organised for commissioning and describes the principal commissioning activities. Emphasis is placed on appointing

    Jan 1, 2005

  • ISEE
    Difficulties and Suggestions when Drilling and Blasting in a Karst Environment

    By James T. Ludwiczak

    Drilling and blasting in a Karst (sinkholes and mud seams) environment has long been a problem for blasters, miners, quarry operators, contractors, and developers. While one cannot change the geologic

    Jan 1, 2005